You are on page 1of 30
MASTER fo Principal cvi2000/09 Resident INFRASTRUCTURE FOR oO Engineer _| PENNY’S BAY DEVELOPMENT CONTRACT 1 CONTRACTOR’S SUBMISSION FORM Method Statement of RC. Structure of Date of | | | | i | [Submission Ref. No. : CV/2000/09/CSF/000216A Specification Reference: P'S. Section 6, 14, 15, 16 Drawing Reference: Dwg. No. 91800/418/12018 - 91800/418/1233, Description of Contents: Enclosed please find the captioned method statement for your comment and approval ‘Yam 0 Irrigation Pumping Station _Submission: 12" March 2002 Remarks: CED Distribution | Purpose of Submission: | From: Contractor's Project Manager Name: W. S. CHONG For Review 1 For Information For Record Purposes ig. (oe Clon Kl da China state Construction Engineering Corporation WSCRORGEVHYIERS cc. MCAL ~ Mr. Keith Tsang China State Construction & Engineering Corporation Contract No. CV/2000/09 Infrastructure for Penny’s Bay development Contract 1 /2000/09/CSE/000216/4 Submission Ref: Method Statement for Foundation and R.C. Structure of Yam O Irrigation Pumping Station China State Construction & Engineering Corporation Contract No. CW/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station Table of Content Scope of Works 2. Sequence of Works 3. Plant & Equipment Appendix Drawings and Sketches ‘Appendix I Inspection and Test Plan (ITP) Appendix I Material Catalogue Appendix IV Risk Assessment China State Construction & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station 1. Scope of Works Under the scope of the works on the Contract, Yam © Irrigation Pumping Station shall be constructed. Open cut excavation method will be adopted for the construction of the footing. This method statement will focus on the followings: 1) _ Excavation to the Base Level of Formation 2) Construction of Footing 3) — Construction of the Framing of R.C. Structure 4) Backfilling to the ground surface level 2. Sequence of Works 21 The area will be excavated down to formation level provided by the Engineer using open cut method before the construction of the concrete footing : 2.1.1 Set out the layout plan according to the sketch no, $A/033/A for the irrigation pumping station. 2.1.2. The excavated material will be delivered to designated stockpile area by dump truck. 2.1.3. Slope will be formed at a design safety angle of 40 °. ICE Certificate was submitted on 8 Jan 2002. (Cert. No. ICE/02/0101D) 2.1.4 Access to site refers sketch no. SA/033/A. Construction of concrete footing, 2.2.1. Trim the ground to the required surface level by small backhoe. 2.2.2 Compact the earth soil by vibrating roller or plate. China State Construction & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station 2.23 2.2.9 2.2.10 2.2.16 Set out pegs evenly on the soil for the level of the blinding layer and cast approx. 75mm thick concrete until it levels off the pre-set peg level. Set out the framing layout structure of the concrete footing Erect one side of the formwork for the control of the rebar cover accuracy. Mould release agent will be applied on the inner surface of formwork. (See Appendix III) The temporary work design (Falsework and Formwork) will be submitted separately. Reinforcement will be handled by crane lorry to the construction area and fix by steel fixer. All reinforcement shall be fixed as per working drawing and relevant bar bending schedule and cutting lists. The bar bending schedule will be submitted separately. Concrete spacer will be tied to the reinforcement evenly to provide enough cover as specified to the casting concrete. Sacrificial reinforcement, in the form of support U-bars, may be used to ‘maintain uniformity of the top steel ‘The remaining side of the formwork will be erected after all cast-in item had been fixed. All cast-in items for E&M installation etc. will be submitted separately, Construction joint location refers to sketch no. SA/034/ 100mm(H) kicker will be provided for concrete wall and columns. Concrete will be delivered by truck mixer from the mixing plant and discharged into a concrete skip for pouring concrete by lifting crane. Concrete will be poured layer by layer with compaction by vibrating poker until China State Construction & Engineering Corporation tract MS fe t No. CV/2000/09 R.C. Structure of Yam O Irrigation Pumping Station the construction joint (CJ) or designated level is reached. 2.2.17 The concrete will then be covered by a polythene sheet during the period of setting. 2.2.18 After the required strength of concrete had been achieved, normally one day after, the formwork will then be strike down and removed. 2.2.19 The construction joints will then be formed and roughened by scrabbling tools for the construction of the upper structure. 2.2.20 The concrete pour sequence is shown on Sketch No. SA/035/A. Backfilling of Footing 2.3.1. Suitable fill material will be backfilled to the excavated area in 300mm layer by layer to fill the void found under the formation. 2.3.2 Vibrating roller shall be compacted in each layer of the filled material. 2.3.3. Repeat step 2.3.1 to 2.3.2 until the filling reaches the designated level 2.3.4 Compaction test shall be carried out if required. Construction of framing of R.C, Structure 2.4.1 Set out the framing alignment of the wall and adjust the starter-bar in accurate cover position. 2.4.2 All formwork will be erected one side only. Mould release agent (see Appendix II]) will be applied on the inner surface of formwork. 2.4.3. Set out the cast-in items or inserts on wall of formwork. 2.4.4 Reinforcement will be handled by crane to the fixing area and positioned & China State Construction & Engineering Corporation Contract No. CV/2000/09 for R.C. Structure of Yam O Irrigation Pumping Station 249 2.4.10 2.4.11 2.4.12 24.13 414 24.16 fixed by steel fixer, All reinforcement shall be fixed as per working drawing and relevant bar bending schedule and cutting lists, Install the cast-in items into reinforcement reserve position, such cast-in items will be tied by wire onto the rebar and kept sufficient cover by concrete spacer. Sacrificial reinforcement, in the form of U-bar, may be used to maintain uniformity of the wall steel. Erect the remaining sides of the formwork. Concrete will be delivered by truck mixer from the mixing plant and discharged into concrete skip for pouring concrete by lifting crane. Concrete will be poured layer by layer with compaction by vibrating poker until the construction joint (Cl) or designated level is reached. The concrete will then be covered by a polythene sheet during the period of setting, After the required strength of concrete had been achieved, the formwork will then be strike down and removed after the minimum time for removing formwork had been elapsed, (Refer to GS: Clause 14.35 and Table 14.6) ‘The construction joints will be formed and roughened by scabling tools or green cut method, Repeat step 2.4.1 to 2.4.12 for the roof structure Concrete will be poured layer by layer with compaction by vibrating poker to the top slab level of the roof. Hand tools shall be applied for making concrete surface to the required finished schedule after the concrete pouring to the roof structure had been completed. Strike down and remove the formwork of the roof slab after the minimum time for removing formwork had been elapsed. (Refer to GS: Section 14.35 and China State Construction & Engineering Corporation Contract No. CV/2000/09 ‘MS for R.C. Structure of Yam O Irrigation Pumping Station Table 14.6) 2.5 Backfilling of the Pumping Station to ground level. 2.5.1. Suitable fill material will be backfilled to the excavated trench area in 300mm layer by layer to fill up the ground below the ground level. 2.5.2 Vibrating roller shall be compacted in each layer of the filled material, 2.5.3 Compaction test shall be carried out if required. Plant and Equipment - Backhoe - Small Backhoe - Dump trucks - Vibrating Roller - Steel reinforcement bar cutting and bending machine - Mobile crane = Crane lorry - Vibrating poker = Compacting roller - Generator Set - Submarine Pump Set China State Construction & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station Appendix I Drawings and Sketches ne China State Construction & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station LIST OF DRAWING Title ‘Yam O Irrigation Pumping Station — Location Plan ISAIO34/4, "Yam © Irrigation Pumping Station — Section and Construction Joint [SA/OSS/A "Yam O Irrigation Pumping Station ~ Concrete Pour Sequence | —_] apap Aw Cee NTS ola A PREPARED BY CHECKED EY + SCALE SKETCHNO, 2s BAY DEVELOPMENT CONPRACT 1 LOCATION FLAN OF yaa, O IRRIGATION PUMPING STaTion CONTRACT NO. CV/2000/08 INFRASTRUCTURE FOR PENNY? | Te jaunsell ors ins ad NOIMIIS Fe NOUTIS TRS We EAS PLO GPT od oy ites a yh se 31S YOO TE GNNOED arty Saat hay aati po 2 ees ons YOOTF ONNOED _ Aoyoss re Oo China State Construetion & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station Appendix IT Inspection and Test Plan Ref. No. CV/2000/09/ITP/005/B Construction of Pumping Station OL 2 angnundy ang seams wuld POH - 90 [1204 ON OU jomwog 9 ywiog Pro -HL oom sso ‘ i : ss | smopmemd| « | zm] a8, 7 stapes E07 Reqs | @oenntary snug toons 09-9 wed POH -H x sore noe ng eanooa Aowonboa poe 3058 bet ung on oso | vs ID EOE BANS % /S00/ALUG0/000T/2 * China State Construction & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station Appendix III Material Catalogue * "TS Principal cviz000/09 | Resident INFRASTRUCTURE FOR | Engineer PENNY'S BAY DEVELOPMENT | CONTRACT 4 Civil 6 Engineering Department CONTRACTOR'S MATERIAL SUBMISSION FORM [Title of Submission: Curing Compound for Structural Works (Submission Ref. No. : CV/2000/09/CMS/100040/4 | Required information | I Date of Submission: 5/12/01 Details Provided L Suppliers Name |Fosroc Hoag Koog Led | | ‘Suppliers Address [TI01 Eton Tower, 8 Hysan Avenue, Hong Kong | [Name of Product or Sanice [Concave 93 | Tye of Product or Service [Carn Compo ["Appicable Spectication Clause sient Resicable Stancard [BS 7540 md BSG Data Proved of Used Proposed Location of Proposed Duration f aD Darroution © Supmission: Review Z [Purp jofom : Contractor's Project Manager Name: W. S. Chong | Signature‘) 7 China State Construction | LTS feta Engineering Corporation | by ey | WSC/KG/KSLIW Cc ICAL — Mr. Keith Tsang SD (W) CED (CV/2000/09) Goncure SO High efficiency curing right du Technical suppert wnen first applied 1 produ cvating barrier to moisture loss ensuri hydration, improved durability and reduced shrinkage. ‘The white and akuminised grades contain pigments base of titanium ciexide anc! aluminium flake respectively 19 meet specifications requiring such pigmentation fer 5: reduction of solar temperature gain. tt should be notes that SO. reduction of solar te mere efficient cement Fesrce Technical Service Os coses. 019 2 ema Health and safety Concure $0 shoulé net be swallowed or allowed ‘nto contact wit skin and eyes. Avsi¢ innelstion of vapours and ensure adequate venti pment Searing Suitable protective gloves and goggles shoule be wor ‘Somme peasie are sensitive to resins anc solvents. Samer ry equipment should Se cleaned immediately ster use (or Rczaiex Antipaint cr write scir (creams such as Kerodex Antisotve | flushing through with Solvent * tional skin prot Should accidental skin with 5 resin removing cream suct Grade Skin Cleanser or Rozakiers Jo wil be slowly removed by anysical serasioa in O mitations. casens calling for wax stimating - packaging rage eure $0 has a mi gains? igmerted ¢ mners uncer normal waranouse e=né! Co & Concure is he 2se28662 © Singanore Te 881 1265 2898 2831 Fax 861 (305 Tet 028820677 indonesia Fox 02899 9546 Chine Te C20 384 3228 Fac 0203843280 portant note ‘96 proccss are guacarsmed against defective matariais and naterais and Si oon Fad BG Lay, 199 Pome Bi Bu97 Buvy| he oun peuy uo os oank: Boor 8661. Feraueyy, ea/oe/, Vax NOMVOOA LO3TOu _o6en eunouos SUWIAIC SCMAYSAAM LOarOu.s TO?=Prinel . Principal | cvr2o00/08 | Resident INFRASTRUCTURE FOR | E ~ PENNY’ BAY DEVELOPMENT O Deemeeng | Ngineer NNY Tl Departmer | ‘9 | #80\CONTRAGT 1 aos CONTRACTOR'S MATERIAL SUBMISSION FORM Title of Submission : Mould Release Agent for Structural Works Date of I ‘Submission: 6/12/04 [Submission Ref. No. : CV/2000/09/CMS/100043/A _ | I a5] = | Required Information | Details Provided ‘Suppliers Name [Fosroc Hong Kong Ltd [Suppliers Address | 1101 Eton Tower, § Hysan Avenue, Hoag Kong Name of Product or Sens [Resbol Type of Product or Service | Mould Release Ageat | Applicable Specification Gl [aut = | Applicable Standard [NA & | Test/ Backup Data Provided [Catalog as attached & Previous History of Used [Asperthe amached Job Re | Proposed Location of use - [Femwor ofeonarie wos —| | Proposed Duration feruse [Stractaral Works forthe Contract | Health and Safety Information provided [Refer to catalog BD referenceno. INA | | FSD reference no. ia | CED Dewieation | Remarks seu Lg t | Eq 1 | oi ! Gra} ERT ORT jen) FE I Ty EE [Purpose of Submission: 7c Bete | For Review For Information ‘oF Record Purposes From : Contractor's Project Manager | | i n i Name: W.S. Chong - is Mey WSCKGKSLIW Co": ARCAL ~ Mr. Keith Tsang . (CW) CED (CV/2000/09) China State Construction Engineering Corporation on . 1 Minimises ME Non-stain 5 ct rom the ineriace during clacing and ry minimises suriace vipration. This a ning process. Application questions, further intarr require only a single appiicaticn 2 recoated ita delay Fasrec office, Néw unsealed timber surfaces shovi¢ be . cui prior to re-coatng wih Reba a previous cescribed. The use of Resbol minimises the amount of clearing required prior to re-use of the formwor itis necessary to rer of repair or resealing with Resbel Formeste,& The File chemi fe ication After stripging or demouiding ‘ker use, the formwork ar mould shuld be 2: tust prior 8 wiped ciean of any exces application at tended use the mould surisces require repair or ring witn polyurethane sealer, al resicual traces cf Storage, iheit m frost. Sh rarer iseverenty exccuad io tos, must be sired . roughly 6 Teb 2882 8682 Fat 28952037 Singapore Tel: 861 1268 Precautions Health and safety Aleebel should be treated as tially harmful as there is Featol sroulé net be swalowed cr alowes te come'nta contact with skin and eyes. Avoid innatat of vapours Cteaning and dispesai Sailages of Reebcl shoul be a! vermiculite and transferred to sultant Contaminated areas will become si Additional information .chnical data and guidance range of concreting aids inctuding ol carders, ar entraining agent: ralease agents, surtzc: repair materials, ational Limite Reebol is the trademark of Malaysia Te 03 $17 5860 Fax 03 811 6960 Tals 020 264 8225 Fase. 020 384 2260 Fax: 88 0308 soe BUS HELD MIS “09.08 ove 19 OWL cove log ou LW | 00-66 L200 SULA vo-06 ems unyat (© Yeast Buna, ‘gO OLA 4912/M 19Wy Lu ZO), waay yeav'y 1) BOIEAA Jo ae reer 10 Bui JHORISOY AWW AA, lo-00 o00z voz oon ogo’ 1PV1 Bua we 1su99 UF jog abug unya Uarn Buoy van, 04 (91 Fen nus UHL ooimoyt oe coors: oovz oar ozs 00s bor e1z/z1z OHOD, Bune} wa ‘19efo4e 1eUUNY, “Oscad yeeforg sjouUNL MED oe ‘oZcad fosmid O1L BONY TEAK INS ULL UNL te} V0 DOD EM wus BUND “Boh OOM JEM IOUS UML "G02 QHON. | 20% QUO China State Construction & Engineering Corporation Contract No. CV/2000/09 MS for R.C. Structure of Yam O Irrigation Pumping Station Appendix IV Risk Assessment 7 somaty a ‘ : wxmd yepswey eu » Ssorprts0a80e109 axed aneats | yexuioho samen wor t 1 souftog unjose eat € cue Tepe, | Seumpen: | ose Sis “pnt Kg pose seann.] Jo eepenaon pu Appon torn option fa por al Oo www € © mou teo5 ‘eat ' jompapstdeeg um woud soup | pret anes wer z u nov voto, wu £ wemqomasng | yoom | aqoruones || ARS, [ Famacena | scumbeewo | power Pm | coy janmpeanmnn | SAAR [emia [ wow | pemrmesy | MM | a Tileny [Lie aomory Tara A |_srarodeny Aa worey EA HT 1 - not] rm) So owen pwn IMHNS 20uNHN a _ SOLOS ofeW w w# _———— WONAIOASNOD wopPs Sort ——— Tova coq | wopps | seu | 4a | aoonrrasr Louvers womens ayn ; GOTHOOTAD ON PEHVIED Troe qu03 juawdofarag Avg §,6unDg 105 aamanayseajuy | wopEdLsT O WEA Jo 24M} INA9S “I°Y JO IUSENFY ASL PY] Guoy Suoy) “Bxduq woponASUO) Bes FUMED cect sremteeetineetecmt menbcemmcom neta a RRS TOOT MTT = Po ERT © tee yoo ~ ar REPORTER Fa yoossdy TTT sapormery eres — vet ‘ © ry WON EO unNpHy t e OUR meses Pinows Suypury soon sappy pow one pt Prien aa unger t x wend pep ‘ ‘ - pete Ue ‘papyvcud ouidmbo | ames ws oa csanjsoorraet (us) soonaay | RUNES | ys ta won | : on | siemens . . Sayryeonmey | “MP | treme oe ot Gee mon cman emoumny Rae [Semmes | POET | annem | ON 7 gota | a argued fq worDy TT oa vera no) mot] waaay | punicany [Av noua pe waa wot | nara | venue nom | @ 204 ataay | nin nom om | (©) vou porn ovpe Any sm0H9G revo | payne | yout | oat |) seer cea, - - o @ a AONANOASNOD ‘wopres spat _ * Tove sq |wopps | seowr | a | qoourrayry TOwv aaa: i. oes dudung GOODOTIAD ON WENO Ls9e2)N03 - juawdoysrag Sug ¢,Sudiag 40} aamonAyseazUT | _MoREALIT G wIM.A Jo auMaNNNG “3°Y Jo MIUISSaSSY AS | _ “PFT Guoy BuoxD “FxFuq uoromspsuo? ayers UNL

You might also like