You are on page 1of 41
Soe 7 Mite : 2° IR eae it $e oe FE RE AS cart CHINA STATE CONSTRUCTION ENGRG. CORP, 298i Overs Bing i 5 Reference ; CSCE/TRL/99/504/400 Een meer ea Date : 6 January 1999 Pan fax 1852 2885 5939 | The Engineer's Representative Binnie Black & Veatch Hong Kong Ltd Junction /O Ting Cheung Road / Tin Pak Road Tin Shui Wai Site Office New Territories e Attn : Mr. Ho Pak Hoi ____ Chief Resident Engineer Dear Sir, Contract No. YL 39/98 ‘Tin Shui Wai Further Development ‘Tin Ying/Hung Tin Road and Tin Tsz/Long Tin Road External Links VIcthod Statement for CAPWAP Test We would like to inform you that our captioned CAPWAP analysis for H steel pile would be carry out by Foundation Techaiques Ltd We submit the P.D.A. testing and CAPWAP Analysis method statement for your comment. 1) Preparation Before Testing. ‘ 2) Equipment Set Up for Normal Operation Mode. (Transducer Input) 3) Data Input. 4) P.D.A. Output Quantities 5) Reprocessing of Field Data Record. Appendix A : Technical Information of P.D.A. ‘Testing and CAPWAP Analysis. Appendix B ; Reference Job List Appendix C : HKLAS Accreditation Certificate for Construction Material “Thank you for your attention Reference : CSCE/TRL/99/504/400 Date: 6 January 1999 Yours faithfully, For and on behalf of CSCEC » C. Cheung, Project Manager Enel co. Head Office KCCMY Tio Page 2 eee a ® Foundation Techniques Lid. Sete Fw ao (1) Preparation works before testing iri Information requested Requesting fron the engineer or his representative the relative Information for P.D.A. testing. The information required as follows: a) The pile mark and its location, b) Type of pile to be tested (Je. steel H=pile, steel pipe Pile, prestressed concrete pile, steel composite pile etc.) . ¢) Sectional dimensions (ie, diametre or sectional sizes, net eross sectional area, wall thickness or frange and web ‘ thickness) ‘ a) Pile length (Je. total pile length, spliced section lengths and length below gauges) @) Pile physical properties (specific weight or weight per unit length, elastic modulus, vave transmitting speed in pile. f) Hammer details (if diesel hammer: name of manufacturer, modal name, weight of ramj if drop hammer or hydraulic hammer: weight of hammer, stroke of hammer). g) Reference sora hole log (the nearest bore hole to tha test pile) @ h) Type of P.D.A. test (ie, installation test, end of initial drive test or restrixe test). 1-2 Preparation works for gauges attached to tast piles 4) Prepare six (6) numbers of steel pads. Each three (3) of them shall be attached, by means of welding, to the correctly measured position at one and its opposite sida of tha test pile. ii) Attach transducers and accelerometers to the teat pile with proper type, siza and length bolts. If the belt ig too tight, it may crack or shear the transducer or the accelerometer, if too loose, the transducer or the acceleroneter may slip, (Sac figures 1-1, 1-2, 1-3: Transducer Bolt Arrangements fer test piles) wdeae dbo su anes t sw cH) -Pigura Ll We ee roundation Technique: | Roe ms i yy 3 i ' 1 1 ! ' t | ' 1 ' 1 Transducer Bolt Avrangamanta for steel pile Rt ERS Wea ue STRAIN GAUGE + ALE HOLES AT 6 om AND 2¥ TAPPED STRAIN GAUGE = aece ACCELE! 7 anganents for tee Fipe File Teansdusay Jolt 15: ee ee Gree + is OO STRAT GATE = ” / “ Me CRREREROMETER = ALL HOLES AT 2 mm AND ANCOR BOLT 85 INSERTED je ’ Figure 1-3 1 Tyanséucer, Sole Arrangenants For Concrete Pile 4 GREY vane oe tae saat ae @ aod @) Foundatlen Techniques Lid. een en od 444) check with PDA if ofeset of strain tranaduaors after Sachaent are within tolerable values, If not, adjust the transducers unil thay comply with the raquirenents, Rquipaent set up for noraal operation mode Cable connection of equipmant (See figure 3-1 : Schematic of equipmunt sateup for normal operation = ‘transducer input) P.D.R. power checkout ‘fo avoid danaga or blovn fuses due to improper power Supply to the 7.0.A., tha source of power @Upply and Eesbonges of pover ine st the #.D.Ay must be cAetslly checked. calibration check a) Per model Gea Preae "CAL" to check {# the transducers and the analfeot are functioning properly, 1601, 3 calibration signal (see figure 2-2 : Cailpration signal) will be digplayed. b) For model ccc or PAK men the PDA Ss wall peopared (1a, tranaducera are proporiy attached to teat pile and date correccly input), depress "CE" and return on keyboard, & calibration signal as sinilar es Figura 2-2' wil) eisplay on screen. Data inpet Prior to enmmencenant of testing, tha following Anformation and data shall be inpuc Into the POA, (1) tntormation of pile + Pile length, size @ dinensLons (Gt) Pile properties + Hlestic modulus, specific waight, wave peed, (S14) Daniping factor (3) (iv) Calthration acceleroneta! eters of strain transducers and Foundation Techniques Lt: carne pe ae ance canoes nos ott" onoan i ® eae ST procccrtee SCILLSCOPE MULTIPLEX | PTIONAL TELEPHONE LINK sk STORAGE aseruLescors Schematic of Data Processing Figure 2-1 1 Schematic OF Equipment Sec Up. 6 Foundation Techniques Lt | : Re HI Rh gomseo a émsee | Figure + Calibragion signal (a) (5) P.D.A. output quantities Generally PDA produces the following output quantities. maximum total resistance with Damping factor J=0. maxinum energy transferred to pile. downward travelling force wave. naximum Case-Geble resistance. naximum compression force. naximun tension force, blows per minute. : = EM + : “Reprocessing of field data record The analog force, acceleration and valecity data and other quantities were recorded on analog magnetic tape (or floppy disk for using Model GcPC or PAK) during field tasting. The recorded data allows the field event to be recreated for further studies as well as ‘a permanent record. For more detailed analysis, CAPHAP analysis will be carried out, if required. Appendix A: And CAPWAP analysis BACKGROUND i Since the mid-1960s research has been at Case Lestitute of Teckaology in Cleveland with the objective of. {eaproving pile instalation and construction coateol methods uslog electroaic measuremeat and roodern analysis smathods, This work bad been supported by the Ohio Departmeat of Transportation wad the Federal Highway ‘Adminstration, 4a 1973, the research results Were introduced into practiog, Professor Q, G, Goble, who had beea the principle investigator at the Caso founded Pile Dynamics, lnc. a compeay which manufictures » amoag other devices - the Pile Deiving Analyte (PDA), Together with his foomer restarch ssn be alo founded Goble 3 Likins and Associates, Inc. (GRL) a consulting eogincering firm specialized in the dynamic Beasuremeat and antlyeis methods of piles, "Pile Dynaenics genduslly improved the PDA techuology, elways searching for and wllicing advances in electronic and computer tochnalogy. Tn xddition, new devices wero built nd introduced into the market. GRL, en the other band, developed methods apd software for the analysis of the tacasived qusatitice. Its the iateat of tis paper, to summarized both analytical and measurement tools available to the civil engineer. RESULTS FROM DYNAMIC TESTING v The following are the min cbjectives of dynamic pile testing (or monitoring), + © Bearing Capacity tthe tins of testing. forthe prediction of a pile's long term bearing, meanirements are taken during restriking. © Dypamie Pile Stresses during ddving. In order ta limit the possibility of pile damages, stresses must bo kept within etrisin bounds, For concrete pile both tension and compression stesséy ara important, +, Pile Totogrity often aust be checked both during aad after ple instalation, © Hamater Performance must bo checked for preductivity and construction coatrol. MEASUREMENTS e ‘The bitis for the results calculated by the PDA are pile top force and velocity signals, obtained using plczoslectrio accelerometers and boli-straln transducers attached tothe pile vear its top. The PDA conditions snd calibrncs these signals and immediately computes avecago pile force tad velocity. Using Case: Method solutions, the PDA calculates the results desoribed in the following sectioa, Other meagurtment are sometimes also required, The ram velocity may be directly oblained radar te¢hnology jn the Hammer Performance Analyzer” (HPA). For open end diesel himvaers, the time berween two Impacts indicates the magaituds of tho fall height. ‘This inforrnation is measured and calculated by the Saximeter™. Furthermore, the combustion presture may be mescured in diesels for proper wave equition modelling, i Acceleration sxeasurenoats taken on a helmet in addition to staadard pile top foree and velocity measurements yield pile top cushion stiffness information. ‘The Pile Integrity Tester (PIT) can be used to avatustedaanage to piles which nay bave occurred ducing driving for casting, It should also be meationed that this so-called "Low Strain Method” of integrity testing requires aly the messuremeat of acceleration at a pile top. Tao stress wave producing impact is then generated by & seul hand-held hammer, 7 renin wien ANALYTICAL SOLUTIONS: BEARING CAPACITY Wave Equation ORL bas prepared « program, GRLWEAP, which provides for 1 truly analytical solution, i. it docs not require measuremeals and provides to user with « funcional reladonship berween both bearing capacity and pile stress asd the blow count. Tasso results cau be adjusted or calibrated {f measurement of the quantities tre available. However, tho real strength of the trditlonal wave equation approach lies in a prediction of Ariving bebaviouc aad in the selestioa of na optimal driving system. Case Methont ‘The Caso Method {¢ a closed from solution based on 4 few simplifylag ésmumptions nich a3 ideal plastic soil behaviour and un ideally elastic and uniform plle, Oven the measured pile top force B() tnd ple top velocity ‘(the total soil cesiatance RO = A((FO) + FQ) + ve) + ve) @ Alo is the pile impedanes . time t + 2L40 pile length below gags (Bip) is the speed of the stress wave ense lasiéc modulus of the pile fo mass density pile crass sectional arez peo ‘The total resistance consists of « dynamic and a statio component, Thus. RQ) = RO RO @ The static resistance component it, of course, the desired pile bearing capscity, The dynamlo component may be computed from a soil dasaping factor, J, and a pile toa velocity, v,(1) which is coavenicatly calculated for the pile too, Using wave considerations, this approach leads immediately to the dynarole resistence: : RO 9 HE + ZvQ) - RO] @ 1nd fiaally o'the static restsunce by mesos of Eq, 2, ‘This solution is simple enough to’bo evaluted “Ia real time", Le, between hammer blows, usiag the PDA. SCAPWAPC This nethod (Case Pile Wave Avalysis Program - Contiauous Version) comblaes tbe wave equation pile and ‘oll eoodel withthe Caso Method measurements. Thus, the solution includes uot only the total and statis bearing copscity values but also the fitction, end bearing, damplag factors and soll stiffness. The method iteratively determines the large nutober of unknowns by eigoai matching, While GRLWEAP analysis, the CAPWAPC. program works with tbo pile top measurements, Furthermore, while GRLWBAP and Case Method require certain assumptions regarding the soil behaviour, CAPWAPC determines these coll parameter, ‘Tho wavo equation and CAPWAPC solutions laclude stressea along the pile. For the PDA, field results include the ple tap sires dict from the mcasuromest and , for conceatated cad bearing, the uirst at the pile toe from Eq. 1. For concrete piles the maximum tension strss is also of great laportance. Tt occurs at some point below the pile top. ‘The maxlziuen teusfon stress can be compulad from the pile top measurements by considering the ‘mugeitude of both upward and downward traveling waves, W, and W,. W, = ‘UFO - ZV) @ We = BLO + Zt) ® itt If any one of these waves is negative, a tension wave exlts, It must be checked whether the wave travelling : In the opposite direction is sufficiently compressive to reduce the wet tension to allowable levels, ‘The PDA also performs this calculation, e PILEINTEGRITY i High Strain Teses Stccas waves in a pllo aro roflocted wherever ibe foupedance (Z=HA/s) changes. The reflected waves wrive ‘at the pile top at a time which depends on the location of the change, "The reflected waves cause changes in bo pile top free and valoiy. The sagt reaivy ebags afte pl op variables allow 0 detente the extent of the cross cectional change. Thus, with b being a relative intogcity factor which is unity for no Impedance chango and zero for be pile ead, the following can be calculated by tho FDA. ba (lal +a) © i with y= OM, = Weal(Wa- Wad @ where We is the upward travolling wave at the on set of the reflected wave, It is caused by resistance. Way + Is the upwesds travelling wave dus to the damage reflection. 7 Wy is the maximum downward travelling wave duo to impact, Low Strain Tests ‘The pile top is struck with » beld hand bammee and the reeuling pls top secoleration Is measured, displayed ‘and Interpreted for sigas of wave reflections. Ia geacral, a comparison of the reflected seceleration leads to a relative measure of extent of damage, again the locetlon of the problema is Indicated by tbe arrival time of the reflection. 1 RABDRTECOGUITA ‘ n 60 werae | td WLOL * HAMMER PERFORMANCE ‘The EDA can very simply salvulate tho exergy transferrod to the pile top. Bledafecey vier ae a ‘The mayimum of the B, curve isthe most important informatio for en overall evaluation ofthe performance of a driving syetaca, This co-called ENTHRU valua allows fora classification ofthe hamumet's performance, tad, when comblaed with tho lmpact velocity frees HPA, the driving system's performance can also be judged, ‘Thus, with B, being the manufictures’s rited bummer easrgy, the med transfor efficlency is + 4 ~ ENTHRUEE, (Bb) With the ram kivetic energy, B, from HPA, the harumer efficiency is 8 = EVE, : (Be) and the driving system efficiency ENTHRUME, (6a) “The Saximeter™ calculates the stroke froma opea eau diesel using b = (it) T- by @ whore 2 eamh gravitational acceleration, T tne between two Blows, h, a stroke loss value due to gs compression aad time losses during impact “The actually available diesel hammer energy, B, etn be coavenieily ealeulated from the product of ram welght and stroke. ‘Then tho genus transfer efficiency can be enlculaed , = ENTHRUA, 10) “The above onergy and efficteacy values are available for improvements in construction productivity as well as for the modalling by the wave equation. az APPENDIX B a a i “loro ‘on mp 14zde Pax rast 2786 $962 FOUNDATION TECHN! QUES uve LK ' long Kong Laboratory Accreditation Scheme This Is to certify that e FOUNDATION TECHNIQUES LTD. et has bean accepted by the HOKLAS EXECUTIVE, ‘on the recommendation of the LABORATORY ACCREDITATION BOARD, : be asan . Accredited Laboratory Tha Laboratory Is registered for speciio tests, a9 listed in the e HOKLAS Ditactory, within the Test Category of Ca: Q CONSTRUCTION MATERIALS Oiganizations accredited by HOKLAS meet the requirements of ISO/EC Gulde 25 and the relevent raquirements of the ISO 9000 sorles of standards, including those described In ISO 9002. ‘The common seal of the Hong Kong Laboratory Acoreditation Scheme, was affixed hare to by Authority of the HOKLAS Executive, othe (DR. LAB. NG) Executive Administrator Registration No. Date of Registration n 22 JULY 1996 The cerita ie atuad subse 0 tha wars and condone c 0136 Pee San bw HOKLAS. : APPENDIX C 15309 FAX +852 2798 8¥Oz rou go! ". FOUNDATION TECHNIQUES LTD. CALIBRATION WORKSHEET Engineer’s Stee! Measuring Rules “Calibration of Ragineera Seast Measuring Roles_| Job No, / Coloration Not FIeDMTA/L “Fw wn Daten (Cea gt. andeference ain alban oon) 4:00pm. 4/99 _| Time and Dole of Cal: 4:00pm 5/199 Humidity (%): 63% : 3 FPDMTIO4 Division and Range of Rule 0-3.5m_ Bauipment No. of Reference Eats FT/MT/OOL Power lack return ruler Seale ‘Measured Valoe (man) (Reading of Reference Steel Rule + Reading of Lens) Checked bys ___—— Date ‘Form No.: 006001 Rev 2 (25/11/98) OUNMATION TECUNL WOES gon “a9 wD Lara PAK v82 O7EE Registration Number 71 i} ELYLAS ‘ Rerse aa Foundation Techniques Lt. . 603 Shul Hing Centre 43 Sheang Yuet Road Kowloon Bay Kowloon CONTACT: Me. Mack DIVERS, Serloe Quality Assurance Engineer . ‘Tel, + 2758-4861 Pax, + 2758 8962 FACILITIES ; Public testing services FT inmclagarion aways Snag AES Pound Ps ia anny Tos TTY Pyle Pia THON) asm nasa ‘i dian ee nds he erty of 4 Calera of ASTD ‘exp Found Gonos see tans Tat (Pen 1 atu Med Ded Maumee Mia 1993 tea ot ewan st ines st (0 Rap Ma 86419962 2K Wy emerdging #108 a PC etralaton of woe sats ‘980 Papo No.3 519 Ton 3.338 drove HOC 49°C cacenady te (060 Naor. 611904 T482336 hemlet of mune ona rerendeog rcretin f aby avo Dagan 16: a TON 24 ae peat 7 (lala ded) he eer em Sol (cont'd) 06/01, *98 WED 14:48 FAX +882 z709 vod Determlaation of the pss, play Ngai ide Deremlaaion of panicle sta dladbuion bby wet leving wih aspera Devolnaion of porte ses dubs ty wel sevig witout disper, Sedinuataion by bySromaer metod with aperant ‘Sesimenaion by bydtometr mathad ‘witout dispersant Const of sotmuoss price sae aiibation cure thom th rou of wet slvng td sedimenoion west Determination of yen ltr ‘ladonship of somerustabe eo lg 4 1090ce ould eveminatont dy eat J olor rnbadesdlp af eresbobe lt ing 0 100008 mould Deiminstion of iy ens oie telaioasip of non-rusable sls lan CDR mould evrminadoa of (ry deny ol | ‘eadanship of crusade 0s aa CHR mould Inde content comet comet comteat G80 Report Ho, 36 1994 Test. 5.3 Registration Number 71 Page 2 of 3 {GEO Report No, 96: 1994 Te 23.2 ‘QEO Report No. $6 1994 Tent 2.9.28 GRO Report Na, 36 1996 Test2.9.50 G20 Raport No, 36: 1994 Tes 2.9.58. GEO Report No, 36 1 1994 eH 2.9.6 (GO Report No, 36 1994 Test 4.3.38 GEO Report Ho, 36 1994 Ten 4.344 (OBO Report No. 36 1896 Tear 4.3.48 gs FOUNDATION ‘TECHNIQUES wea isuation Number 710 an ese eas eee Daeeeinasion of (QBO Report No, 36 1994 Tent 92.4 sya in la bu deny and asia dry dans of 0 by the sand seplacement method stable fe fae, mediamgrined seis (id sll pouring eying) ‘Deseminalon of (GEO Rapors No, 36: 1994 Te 9.2.2 4 de in bt design J si ory cena ef cit ‘ by do ad coplasenene metod Vv salable for fiz, wediom, ‘nd conrsecined sols ‘i age pouring eying) 06-01-1999 . 2 @ son come: ao Ce ‘MARY CONTRACTOR! 20B NOL ADDRESS ‘TYRE cunt CONSULTING ENGINEERS ‘COMPLETED. ‘PAU (OOL JING AN HILTON HOTEL, SHANGHAI, CHINA ‘TUBE ‘2K. & SHANGHAI CONST. OVE ARUP AND PARTNERS PAU Qo JUNE BAY SEWAGE TREATMENT PLANT, STAGET TUDE sma MOTT, HAY AND ANDERSON ‘PAU O05 [REDEVELOPMENT OF TAI HANG TUNG ESTATB DADO (GAMMON CONSTRUCTION LTD. ‘LK. HOUSING AUTHORITY PAO) 006 LEUNG TINESTATE, PHASES, TUEN MUN DADO ‘SUING YIP BNO, CO. LTD. ‘KX HOUSING AUTHORITY PAU Oo? SHAM SULPO SCREENING PLANT, KOWLDON DADO XWUR LEE ‘WATSON HAWKSLEY ASIA PAY O86 RUMSEY STREET ELEVATED WALKWAY,HE, WILE HIruING SPENCE ROBINSON PAU 009 “TUEN MUN TWON LOT 186, TUEN MUN, N.T. DADO ‘CHEE SHING FOUNDATION LTD. (CHOW WAI KAM & ASSOCIATES PAU O10 LEONG TINESTATE. PRASE H, TUEN MU DADOANIE —-FRANKIKIERLTD. 1X. HOUSING AUTHORITY PAD Git TASWO BSEATE, PHASE, TAIPO AREA 3 DADORRPEE — SHING PENG. COLTD. HLXC HOUSING AUTHORITY PA 012 REDEVELOPMENT OF KWAIFONG ESTATE ne SING YIPENG. CO2TD. HX, HOUSING AUTHORITY PAD. O13 HOIKAU, HOINAMISLAND, CHINA RES KOMGAL -MADNSELL. CONSULTANT ASIA PAU OM CHING TAI COURT, TSING ¥5 AREA ers SGE. HL. HOUSING AUTHORITY PAD 1S CHEUNG ON ESIATE, PHASE, TSING YIAREAB HAIL CAMDAON HK) LTD LAC HOUSING AUTHORITY PAU 0X6 ‘TALWO ESTATE, PLASE 2, TAIPO AREA 3 DADOATME GUE FL HOUSING AUTHORITY PAD O18 CHAIWAND ESTATE, PARSE! DADOSHPUS — FRANOXIER LTO. 3X HOUSING AUTHORITY 1 Pau 019 HL RLAGHDAA FERRY TERMINAL, CANTON ROAD TUBE FRANEIKIBR LID. ‘MAUNSELL CONSULTANT ASTA aay PAU CD YINGMING COURT, JORKBAY PLE ZIM HONG FOUNDATION 11D. LX. HOUSING AUTHORITY Dairy H PAU 2) EXCHANGE SQUARE, SITEB, PHASED BPLE (GAMMON COSNTRUCTION LTD. OVE ARUP AND PARTNERS DApres PAU (G2 THIFRIMARY SCHOOL, TUER MUD ADO ons. RX. HOUSING AUTHORITY wars PAD G23 YIUONESTATE, MAOK SHAN, SHATIN,N-T. ANDO SSIDSG YiP ENG. CO. LTD. HX HOUSING AUTHORITY rasan PAD 04 TUENMUNNEW TOWN (TA25) NBROGRAPH «CHUN WO.CONST. REENG.CO.1TD. SCOTT WILSON KIRKPETRICK cadens PAU 025 YUENLONG AIO HSIN CHEONG (FOUNDATION LTD. 7X. TSU ASSOCIATES Orage | PAU 026 SHANAO POWER STATION, CHINA oss BOPWELLCONSTRUCTIONLTD, OVE ARUF AND PARTNERS ens PAU 02) SECONDARY SCH. FUSEINEST. TPO AREA 17 DAIDD CQUANGDONG HE. EK HOUSING AUTHORITY Angst PAU. 029 CHBUNGFAT EST. PRASE IS ne CGAMASON CORSTRUCTIONLTD. 1.K_ HOUSING AUTHORITY maspes PAU qBp CREUNGFATEST. PHASE! BRE GANMORCONSTRUCTIONLTD. ‘EX, HOUSING AUTHORITY esDots PAU GSI TUNG TAUESTATE, FRASE 4B BmE FRANKIKEIRLTD. HLX. HOUSING AUTHORITY woes | PAI) G2. JUNK BAY SEWAGE TREATMENT WORKS ‘TRE. sma MOTT, HAY AXD ANDERSON nse | RAW (BB TALWO ESTATE, PHASE DT DADO CHINACONSTRUCTION TEX, HOUSING AUTHORITY Ob Sepse PAU OM TURN MUN THAG TUBEAI-PILE ——CHUNWOCONST. &ENG.CO.LTD. OVE ARUP AND PARTNERS mons {PAU 02S CHEUNG FATEST. PHASE woe GkMON CONSTRUCTION LTD. LK. HOUSING AUTHORITY aes ‘ PAD 036 TAYWO ESTATE, PHASE I DAIDO (CHINA CONSTRUCTION LTD. HK. BOUSING AUTHORITY OSs 1° PAU. GB TAIWORSTATE, PASE DADO PRANKTXIER LD. XC UOUSING AUTHORTTY ess | PAU. GBB CHIDG-TAI COURT, FLEVATED WALECWAY BME 5G. LX. ROUSING AUTHORITY seri 1 PRU GO LOWER'WORG TAT SIN RETATE, PHASE AIO FRANKUXIER LTD. BK HOUSING AUTHORITY 29-Nov-86 C~ @ ws cove: sw C TPs cumer MAIN CONTRACTOR | (CONSULTING ENGINEERS reoccur eo PAD Pau PAD PAU PAU PAD PA PAD PAU PAU PAU Ost LELCHENG UK ESTATE, PHASE 0@ FANLING AREA25B 3366 POTTINGER STREET FOOTBRIDGE 0G YUEN LONG INDUSTRIAL ESTATE 04 NEW HOUSING AUTHORITY HEADQUARTERS (046 NEW HOUSING AUTHORITY HEADQUARTERS 04 TOY PING ESTATE PHASE 3, SHE WO HUI 0 HIF (TERMINAL 6) LTD (050 TIN KING ESTATE PRASE 4, TUEN MUN 0S! REDEVELOPMENT OF RWUN TONG (7-P.R.) ESTATE. (060 LOWER WONG TAISIN ESTATE, PRASE 24 (061 HO CHUNG MARINA 7H.7, LOT NO526, SAI KUNG ‘LOWER WONG TAI SIN PSTATE, PHASE 8A (i) 06 WAH MING ESTATE, PHASE 2, FARLING 06 TUNG CHAD STREET, Si1UM SHUI PO, KOWLOON [494 MA ON SRAN AREA 103, PHASE2 (065 MA ON SRAN AIGEA 103, PHASE 1 066 LOWER WONG TAI SN ESTATE, PHASE 88, (067 MA ON SHAN AREA 103, PHASE 1 058 LOWER WONG TAI SIN ESTATE, PHASE 84 (If) “069 KING LAM EST. PHL3 AT JONE-BAY ARBA 23 87 HLOS-TAIPO AREA 8, PHASE 3 OL TAIPO AREA, PHASE 2, C/N : 190 OF 1987 O72 TATPO AREA £, PRASE 4, CIN : 227 OF 1987 0] POLAM ESTATE, PUASE2, JUNK BAY O75 WAN TAU TONG EST.,.PH,1, TALPO AREA 6 (CHINA CONSTRUCTION LTD. SHING YIP ENG, 00. LTD. ‘KIER LOMITED ‘NIFPOR HUME CONCRETE (HK) LTD. OAMMON CONSTRUCTION LTD. ‘GAMMSON (CLIENT : HICHA) SHIN YIP ENG. 00. LTD, ARGOS CONSTRUCTION LTD, FRANOXIER LTD. CHINA CONSTRUCTION LTD. INTRUSION PREPAKT (P.E) LTD. GUANGDONG I.E. LIP HING CONST. CO. LTD. FRANK) XIBRLTD, KM HUNG FOUNDATION LTD. FRANK KIER LID. IM HUNG FOUNDATION LTD. NEDERHORST. ‘GAMMON CONSTRUCTION LTD. FRANKI KIER {XM RUNG FOUNDATION LTD. WING MOU CONSTRUCTION RIPPON HUME CONCRETE (8K) LTD. JISIN CHONG (FOUNDATION) LTD. FRANKIXIER LTD. + SIN CHONG (FOUNDATION) LID, FRANKSKIER LTD. 7 GUANGDONGHE. HSIN CHONG (FOUNDATION) LTD, GOANGDONG ELE. SHING VIP ENG, CO. LTD. SHING YIPENG. CO.L7D. NEDERBORST LK. HOUSING AUTHORITY ILE. HOUSING AUTHORITY HIGHWAYS OFFICE ‘PALATIAL ENG CONSULT. LTD LK. HOUSING AUTHORITY RK HOUSING AUTHORITY 1LK HOUSING AUTHORITY MAUNSELL CONSULTANT ASIA 1K, HOUSING AUTHORITY 3K. HOUSING AUTHORITY 1. HOUSING AUTHORITY 1K. HOUSING AUTHORITY LK. HOUSING AUTHORITY LK. HOUSING AUTHORITY LK. ROUSING AUTHORITY ELE, ROUSING AUTHORITY HLK, HOUSING AUTHORITY AVIS ENG. EQUIPMENT LTD. AVIS ENG. EQUIPMENT LTD. HL, HOUSING AUTHORITY #LX_ HOUSING AUTHORITY -MAUNSELL CONSULTANT ASIA, LK. HOUSING AUTHORITY 1K. HOUSING AUTHORITY ILE. MOUSING AUTHORITY LK. HOUSING AUTHORITY 1B.K. HOUSING AUTHORITY H.. HOUSING AUTBORITY LK HOUSING AUTHORITY 1K, HOUSING AUTHORITY 14K. HOUSING AUTHORITY ILK, HOUSING AUTHORITY 3181 tnee eol2 ESe+ Xvd OPT GIN 68, TO/90 SENDINWONS, NOLLVGNNOS 6-01-1508 Hf . CO @ 308 cove: oo Ce e 2 ‘MAIN CONTRACTOR / pees 08 NO. ADDRESS re amt CONSULTING ENCOUERES commen - 's pauses POLYTECHNICTHD MSs err [INTRUSION PREPART (F-E) LTD. P&TARCHL ENGR oats a BYPDAS = rary z PAU 07% NEIGHBOURHOOD COMMUNITY CENTRE DAO PRANEIEIER LTD. LX. HOUSING AUTHORITY ese os ‘TAT WO EST., TAI PO AREA 3123. N-T_ k PAU SSIS MAN SHAN AREA 103, PHASE 2 wr [BVTRUSION PREPAET (FB) LID. ALK. HOUSING AUTHORITY eek A 3 veo & PAU O77 FUNG KAM ST,. YUEN LONG AREA DADO ‘HEEP KEY & PARTNERS LTD. ARCHITECTURAL SERVICES D. sp OS ca SE TSeL OKs i0OE DADO means! oe nen nove Meee PAU Of WAHKWAIDST., PH.D £3, KELUETT BAY wae (CHEE SHING ENG. CO. 12. HOUSING AUTHORITY ume PAU G8) WANTAU TONG EST.,PHLI, TAL PD AREA 6 NESS NIPPON WUME CONCRETE (HIOLTD. BLK. HOUSING AUTHORITY tern * aus i ENTEGRITY ome By VIDEO) prema PAU 06 X-WHOWLLON SEWAGE TREATMENT & DISPOSAL DATDO RANI KIER LTD. [ARCHITECTURAL SERVICES D. mae 8 TAU O@ REDEVELOPMENT OPTUNGTADEST.,PILS— NILSS FRAN KERLTD. MA. HOUSING AUTHORITY ome | 8 PAO 08 TUENMURLXT wuss THEEST.ER CONST. LTD. [ARCHITECTURAL SERVICES D. wie 3 PAD ORS TATPOINDUSTRIALEST..POLNDER FACTORY X-PRLE GAAOHON CONST. LTD. ‘SPENCE ROEINSON mee 5 PAU 085 HIT TERMINAL? une {ARGOS CONSTRUCTION MAUNSELL CONSULTANT ASIA Dwee gs PAU O87 TAT CHEE AVE, YAUYATCHUEN.KOWLOOK = HPILE GAMMON CONSTRUCFION LTD. ‘TRADE ARBED pene °S ae Ee mTnt oF ON OKEST SE eee tens cea aa eae ae SE POS OONNADCHITED. C.&NOS.1S | HPLE SSNCHONG GOUNDATION LYD, TRADE ARBED uae 8 157, DES VOBUX D.C. a PAU OM TAIPO AREA 6,05 PE CHINA STATE ENG. CORP. TRADE ARBED Dbgess PAU Om PING HA.RD., TIN SHUT WAU, HOS nem GASGLON CONSTRUCTION LID. ‘TRADE ARBED Ages PA. 073 20, PRAT AVENUE nme SIMON & SONSENGINEERING LID, TRADE ARBED ae PAU Ob TAIFO AREA 6.N7.1108 wens CHINASTATEENG. CON... «»—-HLX. HOUSING AUTHORITY Teng PAU 056 -TIN SHU! Wal, 7.LNO.1 NT: sme “TAK SON ENG.CO. MAUINSELL. aes pau 301 “TIN-YIU EST, PHA, TIN SHUI WAI AREAS, DAIDOSILPLE —TSINCRONG (FOUNDATION) LTD. ‘LK, HOUSING AUTHORITY Oenonss xr. PAU 302 EWUNTONG BYPASS PITASE re DRAGAGES ET TRAVAUX CONSULTANTS LTD. sep CONTRACT NO, HEBD CCABWARC punuc PAU 103 TALPOSWDAMING POOL COMPLEX, AREA22 —-AIDO CHEE SIMSG ENG. CO. LX. CIKENG & PARTNERS nase ane CQ tea peg ley LILI i ‘TERM CONTRACT NO.42 OF 1988 & & a MAIN CONTRACTOR f pare 3 208 NO. ‘ADDRESS 18 cuBNT CONSULTING ENGINEERS commuprep g, PAU 356 POLICE STATION, AREA JUNK BAY nae [STRUSION PREPART ARCHITECTURAL SERVICES D. pus — ‘VIBRATION . 7 PAU 10¢ ‘TERM CONTRACT & PAD 105 WATER TREATMENT & TRANSFER FABILITIPS, HOLE GUANGDONG ILE. ARCHITECTURAL SERVICES D. Dag oy ADTAU, NT. é PAU 106 TUEN MON AREA 16, PRASET ANDO HEB SUING ENG. CO. ‘BK. ROUSING AUTHORITY nue 3 PAU 107 NWKOWLOGN SEWAGE TREATMENT & DISPOSAL DATDO GaAMMON ‘WATSON BAWESLEY ASIA woes = § CONTRACT NO. cvIsIn4 : PAU 108 SPORTS CENTREIN AREA GSHEK WU MUL N.T. DATO S#ING YIP ENG, CO. LTD. ARCHITECTURAL SERVICES D. TeAwg 8 PAU 111 $15, BUTE STREET, KOWLOON HOLE GAMMON CONST. LTD. Boo. oer PAU 114 }.R.C. TYPECIN AREA 44, FANLING NT. DAIDO CHEE SUING ENG. CO. [ARCHITECTURAL SERVICES D. oats PAU MS TIN YIUEST. PL2, TIN SHUI WAI NT. DATDOM-PILE 2K. HOUSING AUTHORITY ‘ACER CONSULANT LTD. 29 PAU 119 TINYIVESTATEPIL4,TINSHNWALAREAS =| HIDE HSIN CHONG (FOUNDATION) LTD. LK. HOUSING AUTHORITY 20-Nor-89 PAM 123 TON YIVEST. PN 2, TIN SHUTWAIN-T. YE SHING YP ENG. CO. LTD. ‘ACER CONSULANT LTD. Ear DL 3657 SHEK WU HUI AREA 284 DADO INTRUSION PREPART 2.0.0. BDer 2 ‘PAU 127 MAON SHAN AREA 108782 ATO ‘CHINA STATE ENG. CORP. LX. HOUSING AUTHORITY nose | E ‘TERM CONTRACT NO.42 OF 1988 § PAU 128 TIN SHIN WATEST. PULL AREAS DaIDo RO @.K) MIT 2X, HOUSING AUTHORITY eres E TERM CONTRACT NO.A2 OF 1988 £ YAU 129. SHATIN SEWAGE TREATMENTWORK Tue ‘ARGOS CONSTRUCTION MAUNSELL Dawe 5 PAU 131 TMTL323 TUEN MANNT. DADO LSIGHTON-BRUCKNER ome PAU 152 TAIPO INDUSTRIAL ESTATE, TAIPO, N-T. WEE GAMBAON CONST. LTD. ‘BSPINTERNATIONAL 2-90 PAU 134. SECONDARY SCHOOLIN PACKAGE 6,,TUEN LONG DATDO {GUANG LEE PILING BNG. CO.LTD. ARCHITECTURAL SERVICES D. merase E PAM. 136 MAQN SHAN AREA 108 FRASET DAIDO GUANG LEG PILING ENG.CO.LTD. ‘IL. HOUSING AUTHORITY reer PAU 464 STL MULTLSTOREY WAREHOUSE PIL 1, TURE ‘LEIGHTON. BRUCKNER ‘DRAGAGES ET TRAVAUK Baap 5D WAI CHONG . PAH 165 MA ONSHAN AREA 108701 ‘VESRATION TLE HOUSING AUTHORITY 2020190 “TERM CONTRACT NO.A2 OF 1538 : PAM 346° DITO" WELDING : ‘HX HOUSING AUTHORITY 2650 (MOU 167 LOT NO. 2003 IND 121, TONG YANSANTSUEN STRESS SHING YIP ENG. CO.1TD. tayo i NT. PAU 145 MA ON SHAN AREA 108 71.1 DaDo GUANG LEE PILING ENG. CO.LTD. LE HOUSING AUTHORITY Talay - ‘TERM CONTRACT NO.42 OF 1988 : PAU 151 TINSHUMESTATEPEAATINSHUIWATAREA 16 DAIDO BLE, HOUSING AUTHORITY Iasepoe : 06-01-1909 PAGE 5 OF 20 47 @ 08 cone: aio e ae raven MAIN CONTRACTOR / sos NO. ADDRESS Tre comer (CONSULTING ENGINEERS ¢ hh g PAM. 154 TIN SHUI BSIATE.PHLAB,TINSHUIWAIAREA 16 DAIDO (CHDVA HARBOUR ENG. CO. BK. HOUSING AUTHORITY Salen ‘TBEM CONTRACT NO.<2 OF 1988 PAU 155 SBCONDARY SCHOOL -MA ON SHAN AREA 75 ‘DADO (GUANG LEE PILING ENG LTD ARCHITECTURAL SERVICES D. DAP 3 YAU 160 TSZMAN ESTATE PPHASE 1 REDEVELOPMENT = FDA GAMMON CONSTRUCTION LID. LK. ROUSING AUTHORITY UDO ‘TSZ WAN SHAN, KOWLOON é ‘TERM CONTRACT NO.42 OP 1988 i S10 PRIMARY SCHOOL IN AREA 6, SHIEK WUHUL, KT. DAIDO INTRUSION PREPAKT (RE) LTD. ARCHITECTURAL SERVICES D. hie, £ gi6s MA ON SHAN DAIDO GASDSON CONSTRUCTION LTD. MAUNSELL CONSULTANTS LTD. Bost 610178 SIO SAT WAN ESTATE, PUASE3, CHAT WAN, PDA BX, HOUSING AUTHORITY concen ‘TERM CONTRACT NO.4? OF 1988 610173. UW. KLN. SEWAGE TREATMENT WORKS DAIDO DIGHTON BRUCKNER F.ENG.LTD. WATSON HAWKSLEY ASIA 6D STONE CUTTER ISLAND 10175 SKULEK YUEN URBAN CLINIC AT SHATIN AREA DAIDO. UNTRUSION PREPAKT (FE}LTD. ARCHITECTURAL SERVICES D. Dew 50 pune G10I77—_THI9LYTTLETON ROAD, HONG KONG HUE VIBRO (HONG KONG) LTD. wu; 610179 —_HOS-TUEN MUN AREA 16 PEASE DT, HYDE ‘CHEE SHING FOUNDATION LTD. 2X. HOUSING AUTHORITY wae of 610180 SEUNG SIR TOWN LOT NO.S2. ATFANLING NT. H-PILE GAMMON CONSTRUCTION LTD. nau : 610199 HOS TUENSAIN AREA $4 PHASES, DADO CHINA STATEENG, FLX. HOUSING AUTHORITY 2awpss CONTRACT NO.9 OF 1950 i 610200 FIRESTATION DNTINSIIIN WAL, AREA4,NT. -DATDO ‘GUANG LEE PILING & ENG.LTD. ASD. Verepoo< t $120 “REDEVELOPMENT OF TUNG TAU ESTATE PHASE? DAIDO SUNLEY MIV'SENG, CONST. LTD. ELK, HOUSING AUTHORITY soaps E 610204 YUENLONGSEWAGE TREATMENT PLANTEXT. H-PLE ‘CHIU UNG CON. ‘WATER SERVICE DEPARTNENT Divveso 60 TIN SUULWAV AREAS DADO (CHEE SHING FOUNDATION LTD. ASD. Son f 61022, LUNG TIN ESTATE PHASB2,TAIO, DAIDO- CHINA STATE ENG. SEK, HOUSING AUTHORITY SAPS LANTAU ISLAND ‘TERM CONTRACT NO. 42 OF 1958 . + 6um17 | -OBULKERY STREET AND GILLIES AVENUE, = ELPILE GAMMON CONSTRUCTION LTD. com. WONG Dione HUNGHOM : GIB MA ON'SHAN AREA 0 - Dawo. FRANKIIER LID. ‘B.K. BODSING AUTHORITY 29.050 imo ADTAL ESTATE FUASE3, TSENG KWAN VIBRATION CHINA STATE CONST. ENG. CORP. “HLK. HOUSING AUTHORITY YApeI a 61023 NOS. 51.53 ROBINSON ROAD, HONG KONG ae VIBRO GONG KONG) LTD. SPENCE ROBINSON pee 610225 _S1:53A CANTON ROAD, HONG KONG. PLE ‘GAMAAON CONSTURCTION LID, ‘CW, WONG es 61027 ©—TSZ MAN ESTATE PHASE 1 CAPWAPC GAMION CONSTURCTION LTD. TX. HOUSING AUTHORITY. 1200050 ‘TSZ WAN SHAN, KOWLOON 1 ossors c @ ce @ tg > JOB CODE: 610 Vow 7 a. MAIN CONTRACTOR / par — a a comer Se all ere eet oz © N.W. SEWAGE TREATMENT WORKS, APLE GAMMON - FRANKI KIER WATSON HAWELEY ASIA mM ‘STONE CUTTERS ISLAND JOINT VENTURE s euaxzs ‘TUEN MUN EASTERN CORRIDOR, BPE ‘MANSTONE CONSTRUCTION LTD. EXGHWAYS DEPT. 06-How 91 g (TUBER MUR SECTION) z (alt Soonioemeeman onra 11: euasnameeete en EE ite nous eer umn Pen raowooncom : CONTRACT NO. 197/1989 x ot A I ene moon. et diet eot peer ee : Be toecerne: crise : 610736 © MOBILE TSING Y1 FUSL TERMIRAL PROJECT, ‘TUBE GANMON CONSTRUCTION LTD. May) € ‘MARINE STRUCTURE, TYTL 115 AREA 17, TSING YI ft cee aves sas Feta i ae ltl aa ee a “gust ‘LONG TIN ESTATE PHASE 2, TAI O, LANTAU ISLAND H-PILE (CHINA STATE CONST. ENG, CORP. LK. HOUSING AUTHORITY WEApr SD = pone eeme as Se aa en cle Sec comme Beare ‘WONG TAI SIN, KOWLOON g / ‘TERM CONTRACT NO. 42788 z | 610253 «MA ON SHANSTTL 381 COMPOSITE ‘CWE PILING & CIVIL ENG, CO. LTD. DSepst ed 610256 PROPOSED PSPS AT STTL 352 AREA 103 ‘DADO FRANK KIER LID. H.K, HOUSING AUTHORITY Doo. = Doreen : es MaoRSuANsri 3 COMPOSE ADO-CONCRETE Gm) LD. wmn § Sr Temerewnmm Ses er we ct Eas tom soca oan i ‘TERM CONTRACTOR NO. <2 OF 1988 z 610267 “TUEN MUN AREA 44 NESS: (CHEE SING FOUNDATION LTD. ARCHITECTURAL SERVICE DEPARTMEt — 12-Sep-91 «& es ee ee ra aera ae Cle Srnec at Eee ee come Eri mame cee anon coaaAT ESV LE Herr a vn * 61079 ‘TWTL 324, TSUEN WAN 5 PLE © ‘GAMMON CONSTRUCTION LTD. 0S-O-1 See eanme See Seca cee coe en CEE Peter yone over co CE lace a Gig eeraeac led ae eas coincome ARMREST HER MIT ne Bmeaowtaen eraeornae on ‘TEREM CONTRACT NO.: 42 OF 1988 worse PAGE BOr 20 © ~ @ 02 cove: aw ¢ e : “8. : MAIN CONTRACTOR / pam 305 NO. ADDRESS Tre amr (CONSULTING ENGINEERS comm oS 5 G1sr2* TINSSIUK WAYTOWN LOT NO. 6, PRIVATE RSIDENTIAH PLE ‘TAK SON ENGINEERING CO.LTD [NG CHUN MAN & ASSOCIATES a ne DEVELOPMENT, YUBN LONG = 610879 320 MARRIED QUARTEXS POR F'S. IN AREA 22, T-K.0 DAIDO- QUANG LEE PILING ENG. CO. LTD. ASD. I7-Seps2 3 809 TINSHU WAI TWGM SECONDARY SCHOOL wene. {HSIN CHONG (FOUNDATION) LTD. S03 ow 10885 SALKUNG POLICE STATION DADO INTRUSION PREPAKT (F-E.) LTD. (203856) ASD. Sopot m 610868 FSSTL 122 ON LOK TSUEN, FANLING, NT. AIO ‘HSIN CHONG (FOUNDATION) LID. Beem ‘810990 PILING WORKS FOR NO. 41, FILKEM STREET, KWL, W-PLE HSIN CBONG (POUNDATION)LTD. mon = 2 610957 MA ON SHAN AREA 100 SSTL 352 HISTAREPLE ——_-FRANKI CONTRACTORSLID. Utes ng 099 6873 LLEN WO ROAD, PANLING, XT, MISTARL-LE ‘FRANK CONTRACTORS LID. tex BO 610001 URBAN COUNCIL COMPLEX AT HUKG BOM HME ISIN CHONG (FOUNDATION) LTD. _—_ ARCHITECTURAL SERVICES DEPT. seo 0002 KWAI FONG ESTATE PHASE 4 HPLE [HARRY STANGER (PE)LTD. HONG KONG HOUSING AUTHORITY ros MAI CONTRACT NO.S6192 fe 6001 ISON KULSTREET, FSSTL70, FANLING [NIPPON UME HSIN CHONG (PODNDATIONS) ASIA LTD. 1aDeost 5 610105 -_SL-S4 CASTLE FEAR ROAD, KOWLOON HEDE INTRUSION PREPAXT (FE) LTD. WONG PAK LAN & ASSOCIATES 05.10055 100% TSBUNGRWANO DEVELOPMENT AREA 25-86 SUEET ILE (CHINA FUIAN CORP. PORLT.E.C —--MAUNSBLL CONSULTANT ASIA)LTD—OBlto 5p : 610107 SECONDAXY SCHOOL AT TIN SHUIWAIAREA 11, DAIDO (GUANGLEEPILINGENG,CO.LTD = ASD. wren = & TSH WAT : & 610110 TSBUNG KWAN AREA 34, KOWLOON HISTARHPRE CHEW SHING FOUNDATIONS LDATTED noes Be 610111 351-353 QUEEN'S ROAD WEST, HONG KOKG PEE ‘WR PLING & CIVILENG. CO.LID apen 1011 DDI24 LOT 400, HUNG SHULL, NT. WEE SIMON & SONS ENGINEERING LTD. -MA.LEUNG & ASSOCIATES ose 087 -AT TING YUESQUARE, NGAU TAU KOK, KOWLOON HEE -FRANKI CONTRACTORS LTD. CS. TAM & ASSOCIATES nis = 8 1009 ULC. SHAM SHUI FO MARKET COMPLEX. KOWLOON DAIDO ‘PRECAST PILING & ENGINEERING CO.LT:ASD. My -B 610652 AOI CAROLINE HILL ROAD, ILE. HOLE FRANKI CONTRACTORS LTD, LEE MARK & ASSOCIATES 2a B 610653 DONGGUAN, CHINA PIPE PILE [ARGOS ENGINEERING & HEAVY WLC.A. CONSULTANTS toms INDUSTRIES CO.LTD. $1067 11-12 TAK HING STREET, ROWLOON HPLE GAMMON CONSTRUCTION LTD... CL WONG & ASSOCIATES O1-Ape58 10G$ REDEVELOPMENT OF SAUMAU PING EST. PH2 = PILE LAP KAI ENGINEERING C0. LTD. SANDBERG BARRIS & SUTHERLAND © OD-Feh 9 FILING WORKS ORDER NO.: A/PRRSMP-2SSV/ETCOL 610462 513.551 CANTON ROAD wR MEEPETE.A COMPANY PAUL TONG & ASSOCIATES <5 Sages ‘104s DISTRICT OPEN SPACE AT AREAS 166 & 14H, SHATINNUPPON HUME INTRUSION PREPAKT (FE) LTD. ‘SCOTT WILSON KIRKPATEICK 1SMap3 CONTRACT NO: SHAQ7 10051 SEUNG KWANO AREA 34 PHASE 1 MME TARRY STANGER (RE) 17D. HONGKONG HOUSING AUTHORITY OF Mp 93 [WORKS ORDER : BP/TKIGA9201/H5010 610052 REDEVELOPMENT OF TSZ LOKESTATEPUASE2 —_DAIDO& SANDBERG HARRIS & SUTHERLAND HONG KONG HOUSING AUTHORITY 1S.De08 : ‘WORKS ORDER: A/P/RTZ-O28/OL/FTOO2. NIPPON HOME cod 6-01-1998 ‘MAIN CONTRACTOR / ‘DaTE JOB NO. ‘ADDRESS ‘TYPE CLIENT CONSULTING ENGINEERS: COMPLETED wa Wom THO LATIDND NPL voorsrars Sie etias inert oieeale “WORKS ORDER : CAP/LTBOA3/0U/FTOO! = 610465 © FOUNDATION WORKS LOT 7020 IN D124 DAIDO [BSIN CHONG (FOUNDATION) LTD. ‘S10 YAN WAI & ASSOCIATED May 93, 2 Bon SHIT NT. : feo NE SN Ek UDWTINSMUIWA! NETONNOME -“OTRUGONYREPART OUND. ODDO ASD. vrais 610K ‘KWAI PONG ESTATE PHASE 4, KWAI CHUNG, NT, PILE: GUANG LEE PILING ENGINEERING LTD. HONG KONG HOUSING AUTHORITY 03 dam 93. rs eiDeTS ‘REDEVELOPMENT OF TSZ OI ESTATE PH2, NIPPON HUME ‘RARRY STANGER (FE) LTD. HONG KONG HOUSING AUTHORITY Bess s wan sansa : en ree wan sien ——«-NETONNIDEE_——_- RAND CONTRACTORS, voroxononousme sumo mm Gem Seowon sma, rowLoo8 ea Siabesone tnonmume eo. CNUTARSONARCTECT comin eo ‘PIPELINES BETWEEN MUK WU AND AU TAU (NIPPON HUME ‘TSUEN KEE PILING ENGINGERING CO. WATER SUPPLIES DEPARTMENT 16-Sep-93 2 (610887 [BEACON HILL SCBOOL ALONG WARWICK ROAD H-PILE ‘TOMRICS ENGINEERING CO. ‘HARRIS & SUTHERLAND ‘2-9 SE URE TANING CRAPO HUME CANON CONSTRUCTION LTD, _-DAMIDO PARTIES tren fowt Ere SMa GN SIA SLATE. pene Glam cna Consruncpowco.L1D. €34 WORG & ASSOCIATES a Sows Mma TUNDONG,N SRSTEEL TRGMrON DRCETER FOUNDATION "OVE AROF AND PARTNERS eg iarasune i. eae og ssesstantzy smast. Bx. sms JootcnAE cone RUCMON 3D. WONO& CHG ASSOCIATES ien £ 610809 «|: MA ON SHAN AREA 90 PH.2, MA ON SILAN PLE, RENDEL SCIENCE & ENVIRONMENT HONG KONG HOUSING AUTHORITY 2S May. 2 ‘WORKS ORDER = B/PIMOZASW9/OL/FTOO (ASIA) LID. 2 cos NOROCINE TESTING IN SUANGIALTROMCTNETOR INE FUNENELTD. TOMO DESONARCHTECTSLD. SKA Ca cosee eon ax NaMONUN En PONOMTNSLT. ian am FuASE 1 WODSS CONTRACT RO. 21 A00 2 ee Tee CouTeS DEVELOPER, NEONHUME -SICHONGGOUNOATION 17, PT ARCTE. & ENGL: FL. noon 8 amino nsiy Toco HADSOUR-SURUARINETITELNS TUMULAS PR] —«WOMUSONPRERAKTEHLTD.—‘ALTOURS-RASWEL. atop Ga SGUGSPRINCPEDYARD ROAD WEST KOWLOON TEFL ShOM a ONS ENOOEERIN LD, poem ear Merrmasunnge QUARTENS FOR MABDICD PE {Ens FOUNDATION 1D. asp. The Shaan OPCS OAD CHL WAT. KOWOON . soon Fue wom aTSA Wat Coa wes Yom CHACCONSTRUCTINLTD” ASD. aos 10538 ‘LOT YLTL 233 SASS 1 AND SS.2 YUEN LONG ‘NIPPON HUME -LERMOND INVESTMENT ETD. Chan 94 iH oosTRAL STATE aon TYDUAUU ROR STUDYTORRCA DADO {HBX CORTRUCTON ASS0.LTD._MAINSELLGHOT. ones Slot YAM GHEONG SEE. LONLOOR on Teer KEE& COMPANY Den Se DINSONDARY SeRCOLDNTHSNOIW/DNDOTIEE KH FOUNDATIONS TD, asp. sone AREA 24, UT. arn 108s £7. @ sop cove: ao Ce ADDRESS: TvrE “{YLT.L- 460°S0UNG TAU INDUSTRIAL AREA, YUEN LCH-PILE [LESISORE POOL COMPLEX AT HAMMER HILL ROAD DAIDO SFINSHUL WAL AREA 13, PRASB 1,7. {J41248 WILMER STREET FOOTBRIDGE, FE RPL 'SLBSRWICK STREST, SHBK KP ME, LN, BLE 1NO.1SS SAI YBUNG CHOI STREET, KOWLOON. ADO [FSS PANLING SHELING SHULTOWN LOT NO, 225 DAIDO (ABEA 18, NT. ‘CATS DE LA SALLE SECONDARY SCHOOL AT ADDO “ZAM TSIN VILLAGE, KS [SEDIMENTATION TANKS AT STONECUTTERS ISLANE DAIDO GORTRACT NO: DOD Spowasey SCHOOL DUPRASE 3 IN XING LAM ESTATE 1-PILE FOE SONG EWAN ©. CONTRACT NO.:SSBAT3 ‘CENTRAL RECLAMATION PHASE ‘TUBULAR PLE MA ON SBAN AREA 100, 8. PDA MINGNAN COLLEGE-T.M.NEW CAMPUS DEV, AT PILE Bans wre REDEVELOPMENT OF EAC TAK ESTATE AT wre Wore TAISIN, KOWLOON [WANCHAI RECLAMTION PHASE 1 TORE PLE [SWINDING POOL COMPLEX AT MA ON SHAN AREA NIPPON THOME, ‘STTL338, MA ON SHAN Bene “L7G TONG LO WAN ROAD, HONG KONG 0B "TUNG CHUNG AREA 10PBASE 1 AT LANTAU ISLAND CAPBLOCK 74 NATHAN ROAD, KOWLOON aILE PILING FOR TIN SHU! WAI AREA 13 PHASE 2 NIPPON HUME. WORKS ORDER: AMP/TSCALSMIOUFFON TUNG CHUNG AREA 10: - BPE GUN CLUB HILL ‘PROPOSED RENDENTIAL DEVELOPMENT, YLTLAB6, H-FILE YUEN LON ‘TUNG CBUNG STATION & TUNNELS 16) HAL TAR STREET, ROWLOON WE BILE ‘cUENT ‘YUEN CHAK CONSTRUCTION LTD. XH, FOUNDATIONS LTD. ‘SHING YIPENG. CO. LTD. ‘GAMMON CONSTRUCTION LTD. (CHEUK MANS MACHINE & ENG. CO. HEEP KEE & COMPANY (CATE SHNG CONTRACTORS LTD. ‘FRANKI CONTRACTORS LTD. [FRANK CONTRACTORS LTD. ‘DATRUSION-PREPAKT (FE) LTD. OPE KEE ENGINEERDG CO. ‘KH FOUNDATION LTD. GAMD4ON CONSTRUCTION LTD. GAMAON CONSTRUCTION LTD. [LEIGHTON BRUCKNER FOUNDATION ENGL. LH. FOUNDATIONS LTD. ‘YUEN CHAK CONSTRUCTION LTD. (CHEE SHING FOUNDATION LTD. KDR WING ENG. CO. ETD. H&K ENGINEERING 00. TONG KONG OUSING AUTHORITY ONG KONG HOUSING AUTHORITY (CWE FILING & CIVILENG. 00. LTD. GANMON CONSTRUCTION LTD. ‘CHON WO FOUNDATIONS LID. “MANSTONE CONSTRUCTION LTD. [BEEP KEE & COMPANY ASD. BX. BOUSING AUTHORITY X.C. CHAN ASSOCIATION ASD. [MAUNSELL CONSULTANTS ASD. PRTARCHLAENG., BK WONG & OUYANG (HK) LID. ‘MAUNSELL CONSULTANTS, ASD. MAMNSELL CONSULTANTS RONG KONG HOUSING AUTHORITY S.K.J0HN HAU & ASSOCIATES. [SANDHERG HARRIS & SUTHERLAND ‘SANDBERG HARRIS & SUTITERLAND SM 29-95 Ise 9s 20035 OVA 6NO9S 10/80 yong neue zog+ XYd 6StPT CaM 6 P.e4 2838 6275 YUEN CHAK CONSTRUCTION CO RE-JAN-1999 15:12 068s 610606 61087 610099 009 aor eng72 oor 6107 ume” 610766 ‘e197 MACAU PROTECT [NSS CONCOTE PLB “WESTERN HARBOUR CROSSING RAMP H, HONG KONOLPILE (CHEK LAP KOK PLE SRIMDEING POOL COMPLEX AREA 26, PHASE2, HLPILE SHATIN, ASD CONTRACT: FICS22 [REDEVELOPMENT OF TSZ ON EST. PH. t NIPPON HUME PLE “TSEUNG KWAN O AREA 44, ROWLOON ERLE ‘50 CHEUNG SHA WAN ROAD, KOWLOON PILE FUR TSUEN STREET. TAKOR TSUL, KOWLOON H-PILE [SPORTS GROUND, SHING MUN ROAD AREA7. NIPPON UME, ‘TSUEN WAN ‘SECONDARY SCHOOL IN AREA 6, TAS PO. ae PILING WORK FOR LINGKAN COLLEGE -TUEN, = H-ILE TION EW CASPUS DEVELOPMENT AT-TATLI76 IED ‘MAN SHAR ser ‘SECONDARY SCHOOLIN AREA 92, MA ON SHAN I-PILE CONTRACT NO, : SSC#00 744 DISCIPLINED SERVICES MARRIED QUARTERS AT NIPPON HUME TUNG SHING STitaET, NGAU CHE WAN, KUWLOON ‘SECONDARY SCHOOL IN AREA 6B, FANLING ILE ‘PROPOSED COMPOSITE DEVELOPMENT AT TAI PO EPILE: TOWN 138, TALO, 8-7. ‘TIN SHUT WAL AREA 27. 8.7. BPE RED. TSZ EST. PIl.2 TSZ WAN STAN HOLE WORKS ORDER : AIP/RTLOI2IS5/03/E 7016 RED OF TSZ LOK EST., PHD SEPILE (CENTRAL RECLAMATION NEW PIER, HK. STEEL TUBE “WEST KOWLOON SEWAGE NETWORK DAIDO ‘PACRAGE Il, NORTHERN PUMPING STATION CONTRACT NO: VA20/95 ‘TSEUNG KWAN 0, AREA 59, KOWLOON (NIPPON HUME }-3-WONG NAL CHUNG ROAD, HAPPY VALLEY —_-NIFPON HUME HONG KONG TALPO AREA S9, N.J. CONTRACT NO: SSDM3— NIPPON HUME (CIUNA STATE CONST. ENG. CORP. FRANKI CONTRACTORS LTD. ‘WEEP KEL & COMPANY ‘TSAN CONTRACTORS LID. K.. FOUNDATIONS LTD. XH. POUNDATIONS LTD. FRANKI CONTRACTORS LTD. SUNLINK LTD. (CHEUKMAN ENGINEERING CO.,LTD. (CHINA STATE CONSTRUCTION ENG, CORP (GUANG LEE PILING ENG, CO.,LTD. (CWF PILING & CILIL ENG. CO.,LID. KIL FOUNDATIONS LTD. MONG KONG HOUSING AUTHORITY SANDBERG HARRIS & SUTHERLAND ‘MUNG WAN CONST. CO. LTD. HOPE XE ENG, CO. FRANKI CONTRACTORS LTD, (CHINA STATE CONST. ENGG. CORP, ‘MEEP KEE & CO. KH, FOUNDATIONS LTD 16Sep35 UIT stamp 9s YUEN CHAK CONSTRUCTION Co sseat 6-JAN-1959 aor eons so78 aor aos 07% stom suw7s7 1080 10812 ions 10817 082s ‘610830 1082 10837 ‘ADDRESS rere cum “EAS PO OLD MARKET PUBLIC SCHOOL Hane "THE PRECAST PILING & ENGG. ©0..11D. (ON CHEUNG ROAD. AREA 4, TAIPO PENTECOSTAL.GIN MA SHEUNG PRIMARY SCHOOL B-PILE 4 PIE FUNG ROAD, FANUING ‘TIE PRECAST PILING & ENGG. CO.,LTD. ‘CARMEL ALISON LAM PRIMARY SCHOOL, STEEL WILE ‘TE PRECAST PILING & ENGG. CO.,LTD. IN KENG ESTATE, SHATIN. CHOI WAN ST. SOSUPIC'S PRIMARY SCHOOL HPnE ‘THe PRECAST PILING & ENGG. CO.,LTD. (HOI WAK ESTATE, KOWLOON FANCR CHUN LEL PRIMARY SCHOOL, SUN CHUT ESTA H-PILE pio SHATIN ‘PLE: LOK HING TOO PRIMARY SCHOOL MILE pro PO LAM ESTATE, TSEUNG KWAN 0 PLL. FOUNG WONG KAM CHUEN PRIMARY SCHOOL H-PILE pirro [LEUNG KING ESTATE, TUEN MUK ‘PRINCE MEMORIAL CATHOLIC PRIMARY SCHOOL #-PILE ‘TON MA COURT 53, CHTOK YUEN ‘SF. WING CHUN PRIMARY SCHOOL, AREA29 STEEL H-PILE, ‘SHER WU BIC, SHEUNG SHUT ‘T179 'WAICHING STREET, KOWLOON HPILE ‘VSL_HO CHI DING CITY, VIETNAM ‘TUBE PILE [REDEVLOPMENT OF UN CHAU STREET ESTATE, PH, FDA ‘TUEN MUN TOWN LOT TMTL379 HeLs Mh ON SHAN STTL 338, N.T. woe "TSEUNG EWAN O AREA 59, PHASE 5&6 HPILE HO MAX TIN HOUSING ESTATE PHASE}, KOWLOON. HATE MILITARY STORAGE FACILITIES AT ‘SHEK KONG CAMP HONG KONG MUSEUM OF HISTORY, ‘TSIMSIATSUI EAST. ‘TSEUNG KWAN O AREA 59, PHASE 6, KOWLOON. ‘CONCENTE PILE [PILING FOUNDATION FOR WAH KWATESTATE, TRIAL PILB WPILE HPLE HPLE “FSEUNG KWAN © AREA 59, PHASE 1. KOWLOON. H-PILE nme dug % o1-Sep 95 16 Aug 35 Dawes D-Aep SS 3o-Ang SS ee 14 Dee 95 roden 9% Feb oT CaN E

You might also like