UpsideNorth HMD project

Subcontractor : CSSI JSA Title : Erection of batching


pant
For BP installation
REBBAT MOKHTAR UN-CSSI-HSE-JSA-007
Supervisor In Charge : JSA No :

JSA Date : 23/04/2018 Revision No. : 00

Work Activity : Erection of batching plant ,lifting by crane for BP Next Revision Date :
installation

SAIF ALI MOHAMMED ELKOMY

Project manager HSE manager

REBBAT MOKHTAR
Conducted By : BAIDJI SOUFYANE
CIVIL Supervisor
HSE supervisor

Reviewed By : JAGA DASEEN VEALLU

JGC HSE MANAGER


Approved By : JAGA DASEEN VEALLU
JGC HSE MANAGER
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

 Unsafe  Work permit must be obtained.


workplace  Conduct the work procedures, related
1
Working condition condition. Workers hazards and control measure with the Supervisor
and Work Permit.  Improper involved workers through the PTW.
Planning.  Equipment and tools inspection must be
carried out.
 Before lifting, the tilt mechanism should be
adjusted to ensure the platform is
horizontal, a neutral gear selected and the
handbrake should be applies
 ANY DAMAGE sustained must be notified
to a competent person immediately. YOU
2 MUST STOP USING THE EQUIPMENT
until a thorough examination has been
completed and the equipment verified as
Pre- start using of Equipment failure Workers safe to operate applied.
platform while in operation  Any operation involving the use of the Supervisor
working platform must be properly
planned, properly supervised and carried
out in a safe manner; the control position
of the lift truck must be manned at all times
during the lifting operation.
 The work platform must not be used to lift
more than the indicated number of persons
or maximum permitted load.
 The platform must be fully engaged on the
forks and secured using the locking heel
pins or auto fork lock provided. The fork
length must be a minimum of 75% of the
platform depth.
 Persons should only enter or leave the
platform using the hand and footholds
provided. The platform must also be
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

landed and stationary on a firm level


surface and connected to the fork truck.
 Safety harness to be checked before being
Safety harness used
failure Workers  All personnel using this cage should wear Supervisor
a safety harness with restrain lanyard
which is attached to the anchor points
provided.
 Personnel using this cage are reminded
Operation failure that head and limbs must be kept within
Workers the confines of the cage during all lifting Supervisor
and lowering operations. DO NOT REACH
THROUGH OR AROUND GUARDS.
 Ground stability to be assessed before
activities commencing.

Falling from height  Check man basket certificate for max


during operations number of people to be lifted (2), use
Workers safety harness at any time in the man Supervisor
basket. Single lanyard if operations are
3 done completely inside the man basket.
Clash of man basket  Watch man must be present to guide the
Using man basket against building man basket.
Workers  Competent watchman Supervisor
Standing under man  NEVER work, walk or stand under man
basket basket.
Workers  Barricade the area for unauthorized entry Supervisor

Distraction of mind  Don't use mobile phones while operating.


 For all signals, which are being given by
Workers Supervisor
watchman should be followed by blowing
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

whistle

Wind speed & lack  Stop work activities if wind speed reaches
of visibility
 No working with man basket in poor visible
Workers
environment or at night time.

1. To prevent hand injuries while driving


Workers
4 stakes no employee will be allowed to hold
Setting/Removing  Hand injuries Supervisor
Forms a stake while it is being driving.
handling
2. The stake should need to be steadied then
forms, using
an employee will use a hammer or another
sledge
stake to steady the stake being driven.
hammers to
3. While using power tools all employee in
drive stakes.
the working area use at a minimum safety
 Possible
glasses with side shields.
foreign
4. Employees will also utilize hearing
objects in
protection while there the noise exceed 85
eyes from
db..
power tools..
5. Mandatory PPE “Helmet, safety shoes,
coverall, reflective jacket and gloves while
working” required for all.
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

5 Mobilize /  Road  Workers 1. To escort crane and heavy vehicle


demobilize of crane accident/colli / 2. To provide banks man to guide
and lifting gear sion equipm reverse/cornering/congested road
ent 3. To comply speed limit Supervisor
4. Provide traffic controller
 Vehicle  Workers .To comply strictly with PTW
entry into / requirements. Supervisor
site equipm
ent

 Falling object  Workers 1. Secure material properly using


/ approved web sling
equipm 2. Ensure all appliances o be properly
ent secured
3. Remove unused materials on
scaffolding platform / working area
4. Keep material in
5. Protect lifting gears from any possible
cut or damage during lifting
6. Barricade crane lifting radius during Supervisor
lifting
7. No unauthorized entry during lifting
8. Stay clear of suspended load swing
radius
9. Strictly no lifting during bad weather

 Pinch Point  Workers 1. Wear leader hand gloves for the work Supervisor
2. Do not place your hand in between two
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

heavy object

6 Crane set up  Soft ground  Workers 1. Use the right lifting gears for lifting
/ works
2. Attach tag line to control load
Supervisor
movement
3. Nothing should be placed on top of
crane operator cabin which may block
view

Underground cable  Existing 5. Avoid place outrigger on cable trenches


facilities 6. Observed uneven ground Supervisor
trench and drains
7 Lifting activity using  Tilted and  Workers 1. Avoid position crane outrigger on
mobile crane boom / trench or drain
collapse 2. Crane shall be inspected by JGC
before entering site and prior to work
3. Outrigger with proper pad and place on Supervisor
firm ground
4. Ensure correct crane counter weight
installed
Operator visibility Project 1. Assessed crane lifting position for any
facilities potential obstruction to the crane
obstructed
operator visibility Supervisor
2. Additional banks man to guide hoisted
load

Swing and hit  Workers 1. Secure material properly using Supervisor


/
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

Existing facilities approved web sling


2. Ensure all load properly secured
3. Protect lifting gears from any possible
cut or damage during lifting
4. Barricade crane lifting radius during
lifting
5. No unauthorized entry inside safety
barrier during lifting
6. Stay clear of suspended load swing
radius
7. Strictly no lifting during bad weather

Miscommunication  Workers 1. Maintain standard signalling Supervisor


/ 2. Walkie-talkie / Phone to be used where not
visible
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

Falling object  Workers 3. Secure material properly using approved


/ web sling
4. All load to be properly secured and tag line
with enough length
5. Protect lifting gears from any possible cut
or damage during lifting by using padding Supervisor
6. Barricade crane lifting radius during lifting
7. No unauthorized entry during lifting
8. Stay clear of suspended load swing radius
9. Strictly no lifting during bad weather

8 Demobilize  Crane boom  Workers 1. Retract fully and lower crane boom
striking / during relocation
existing 2. Escort crane movement on site
facility 3. Disassemble fly jib before relocation
4. Secure main block to the crane body to Supervisor
prevent swing
5. Ensure competent crane driver with
valid driving license/operator and valid
competency certificate allowed

Road obstruction  Workers 6. Rigger / banks man to guide vehicle


/ 7. Provide safety traffic control plan
8. Follow safety regulation
Supervisor
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed

9. Post warning signs at appropriate


distances

Slips/ trips/ and 1. All construction waste and surplus material


materials shall be removed from site.
9 Housekeeping. obstruction. Workers 2. Construction material must not obstruct all
Supervisor
access way.

General Requirements

1. All activities must be supervised by full time Field Supervisor


2. Safety personnel full time on site. Assist field supervisor in identifying hazards and implementation of mitigation/control measures.
3. ALL work locations shall be barricaded & provided with proper safety/warning signs.
4. Work with valid PTW. Conduct STARRTfor every task, every day prior to work start.

HOUSEKEEPING
1. Keep work location in GOOD housekeeping throughout the day.
2. Make sure work materials not block road / access way.
3. No storage of diesel and petrol inside the plant. Except at immediate use quantity.
4. Disposal of waste must comply with Project HSE requirements
5. No dumping of waste at non-designated dumping site.
General Requirements

EQUIPMENT AND TOOLS REQUIREMENTS


1. User must do the pre-use inspection of equipment and tools before use.
2. Defective equipment / tools must be removed from service, apply defective tagging (DEFECTIVE-DO NOT USE) and removed from site.