Work Activity : Erection of batching plant ,lifting by crane for BP Next Revision Date :
installation
REBBAT MOKHTAR
Conducted By : BAIDJI SOUFYANE
CIVIL Supervisor
HSE supervisor
whistle
Wind speed & lack Stop work activities if wind speed reaches
of visibility
No working with man basket in poor visible
Workers
environment or at night time.
Pinch Point Workers 1. Wear leader hand gloves for the work Supervisor
2. Do not place your hand in between two
Who / What
S/No Job Steps (Task) Hazard Control Measures Action By
might be harmed
heavy object
6 Crane set up Soft ground Workers 1. Use the right lifting gears for lifting
/ works
2. Attach tag line to control load
Supervisor
movement
3. Nothing should be placed on top of
crane operator cabin which may block
view
8 Demobilize Crane boom Workers 1. Retract fully and lower crane boom
striking / during relocation
existing 2. Escort crane movement on site
facility 3. Disassemble fly jib before relocation
4. Secure main block to the crane body to Supervisor
prevent swing
5. Ensure competent crane driver with
valid driving license/operator and valid
competency certificate allowed
General Requirements
HOUSEKEEPING
1. Keep work location in GOOD housekeeping throughout the day.
2. Make sure work materials not block road / access way.
3. No storage of diesel and petrol inside the plant. Except at immediate use quantity.
4. Disposal of waste must comply with Project HSE requirements
5. No dumping of waste at non-designated dumping site.
General Requirements