No SEQUENCE OF WORK
A) BUILDING R.C.C WORK
1) DEMARCATION AND PLOT LAYOUT
3) EXCAVATION
4) CENTER LINE
9) R.C.C RAFT
B) INTERNAL FINISHING
1) EXTERNAL TEXTURE WORK
3) GLASS FAÇADE
4) CORE CUTTING
5) CHEMICAL WATERPROOFING
7) MEMBRANE WATERPROOFING
8) INTERNAL PLUMBING
9) TERRACE WATERPROOFING
C) DEVELOPMENT WORK
1) MATERIAL HOIST & CRANE INSTALLATION
4) GENERATOR-Installation
8) STP -Installation
9) CABLING WORK