You are on page 1of 39

Appendix C

SOF Airfield Assessment


Appendix C
Visual Inspection

13.09.2021

This Appendix
contains photographs of the AFL stations,
the airfield lighting system
and other electrical systems
taken during visual inspection
conducted between 17.08.2021 and 20.08.2021

Munich Airport International GmbH

Final Project Report MAI Page 1 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Table of Contents

1 AFL Stations .......................................................................................................................................4


1.1 AFL Station No. II ........................................................................................................................4
1.2 AFL Station No. II ........................................................................................................................4
1.3 AFL Station No. IV ......................................................................................................................6

2 Airfield Lighting System (AFL) .......................................................................................................10


2.1 Approach Lighting 09 ................................................................................................................10
2.2 Approach Lighting 27 ................................................................................................................11
2.3 Runway Lighting System 09-47 ................................................................................................12
2.4 Taxi Lighting System and Signs ................................................................................................14
2.4.1 Section TWY A .......................................................................................................................14
2.4.2 Section TWY B .......................................................................................................................14
2.4.3 Section TWY F .......................................................................................................................15
2.4.4 Section TWY H .......................................................................................................................15
2.4.5 Section TWY J .......................................................................................................................16
2.4.6 Section TWY L .......................................................................................................................19
2.4.7 Section TWY N .......................................................................................................................20
2.4.8 Section TWY N – Not in use ..................................................................................................20
2.4.9 Section TWY P .......................................................................................................................21
2.4.10 Section TWY S .....................................................................................................................22
2.4.11 Section TWY T .....................................................................................................................22
2.4.12 Section TWY V .....................................................................................................................23
2.4.13 Section TWY W ....................................................................................................................23

3 General Airfield Lighting System, Sigs and Marker .....................................................................24


3.1 AFL Lights .................................................................................................................................24
3.2 Signs .........................................................................................................................................24
3.3 Marker .......................................................................................................................................25

4 AFL Cabling ......................................................................................................................................26

5 Apron Lighting..................................................................................................................................28

6 Diverse Technical Devices Apron / Taxiway .................................................................................32

Final Project Report MAI Page 2 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

6.1 Advanced Surface Movement Guidance and Control System (A-SMGCS) .............................32
6.2 Visual Docking Guidance System (VDGS) ...............................................................................33
6.3 Ground Power Units ..................................................................................................................33
6.4 Low Visibility Procedures Indicator ...........................................................................................34
6.5 Microwaves Detectors (MBD) ...................................................................................................34

7 Shaft System .....................................................................................................................................35


7.1 Shaft Structure ..........................................................................................................................35
7.2 Shaft Grounding ........................................................................................................................36
7.3 Shaft Sealing .............................................................................................................................37
7.4 Shaft Miscellaneous ..................................................................................................................38

8 Storage Situation..............................................................................................................................39

Final Project Report MAI Page 3 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

1 AFL Stations

1.1 AFL Station No. II

1.2 AFL Station No. II

Final Project Report MAI Page 4 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 5 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

1.3 AFL Station No. IV

Final Project Report MAI Page 6 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 7 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 8 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 9 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2 Airfield Lighting System (AFL)

2.1 Approach Lighting 09

Final Project Report MAI Page 10 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.2 Approach Lighting 27

Final Project Report MAI Page 11 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.3 Runway Lighting System 09-47

Final Project Report MAI Page 12 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 13 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4 Taxi Lighting System and Signs

2.4.1 Section TWY A

2.4.2 Section TWY B

Final Project Report MAI Page 14 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.3 Section TWY F

2.4.4 Section TWY H

Final Project Report MAI Page 15 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.5 Section TWY J

Final Project Report MAI Page 16 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 17 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 18 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.6 Section TWY L

Final Project Report MAI Page 19 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.7 Section TWY N

2.4.8 Section TWY N – Not in use

Final Project Report MAI Page 20 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.9 Section TWY P

Final Project Report MAI Page 21 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.10 Section TWY S

2.4.11 Section TWY T

Final Project Report MAI Page 22 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

2.4.12 Section TWY V

2.4.13 Section TWY W

Final Project Report MAI Page 23 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

3 General Airfield Lighting System, Sigs and Marker

3.1 AFL Lights

3.2 Signs

Final Project Report MAI Page 24 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

3.3 Marker

Final Project Report MAI Page 25 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

4 AFL Cabling

Final Project Report MAI Page 26 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 27 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

5 Apron Lighting

Final Project Report MAI Page 28 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 29 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 30 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

Final Project Report MAI Page 31 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

6 Diverse Technical Devices Apron / Taxiway

6.1 Advanced Surface Movement Guidance and Control System (A-SMGCS)

Final Project Report MAI Page 32 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

6.2 Visual Docking Guidance System (VDGS)

6.3 Ground Power Units

Final Project Report MAI Page 33 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

6.4 Low Visibility Procedures Indicator

6.5 Microwaves Detectors (MBD)

Final Project Report MAI Page 34 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

7 Shaft System

7.1 Shaft Structure

Final Project Report MAI Page 35 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

7.2 Shaft Grounding

Final Project Report MAI Page 36 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

7.3 Shaft Sealing

Final Project Report MAI Page 37 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

7.4 Shaft Miscellaneous

Final Project Report MAI Page 38 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx
Appendix C

8 Storage Situation

Final Project Report MAI Page 39 of 39


SOF Airfield Assessment Print date: 13.09.2021 - Appendix C
GmbH
 G:\Projekte\F528 FH MUC - intl affairs\F528 BG SOF Sofia\5_WS\51_REP\Airside Due Diligence 08-2021\Appendices\Technical DD Airside 2021 Appendix C_r0.docx

You might also like