Control No.:
Arjay Castro
Contractor Tenant Representative Building Engineer Property Manager
Important Reminders:
1. All activities in the building must have an Approved Work Permit at least one (1) day for minor works and three (3) days for major s
work prior to the actual Work Schedule.
2. Fully accomplish the Work Permit Form in duplicate copies (Admin/Security and Tenant) signed by the Contractor and
Tenant's Authorized Representative.
3. Maximum validity of the Work Permit is seven (7) days.
4. Submission/Approval of Gate Passes is Monday to Friday from 9:00AM to 11:00AM and 2:00PM to 5:00PM at the Reception Area.
5. The Contractor's Supervisor/Authorized Representative must be present at the work area at all times. Absence of the
Contractor's Supervisor/Authorized Representative shall mean revocation of the Work Permit. Workers will be asked to vacate
the area.
6. Workers are prohibited to use the Passenger Elevators.
7. Compliance to Building House Rules and Fit Out Guidelines is a must.
8. Supervisor and workers must log IN upon entry or log OUT prior to exit and present valid ID in exchange of "Worker ID" at
Service Entrance (Back Door Area).
9. Workers must display their "Worker ID" at all times and must be in their proper complete uniform.