Management Asbestos Survey

Weobley High School


Burton Wood
Weobley
Herefordshire
HR4 8ST
E-24679/
On behalf of

Herefordshire Council
05 June 2023

MAI.F5 (R11) January 2023


Management Asbestos Survey
Weobley High School
Burton Wood
Weobley
Herefordshire
HR4 8ST
Herefordshire Council

Date of Survey: 06 October 2021 to 07 October 2021


Surveyor: Jason Phillips

Report Issue and Amendment Record


This report has been issued and amended as follows:

Issue Revision Description Checked Date Signed


(Including amendments)

1 0 Report Jason Phillips 28 October


2021

2 0 Updated report Joanne Page 05 June


following removal 2023
works.

Type C

Inspection Body
Accredited to

ISO/IEC 17020:2012

E-24679 Weobley High School 05 June 2023 Page 2 of 66


MAI.F5 (R11) January 2023
Contents

1 Executive Summary 4

2 Introduction 10
2.1 General 10
2.2 Scope 10
2.3 Legislation 10
2.4 Asbestos Surveyors 11
2.5 Management Asbestos Survey 11
2.6 Limitations of the Report 11

3 Survey Description 13
3.1 Building description 13
3.2 Areas Not accessed 13
3.3 Sampling Strategy 13
3.4 Presumed materials 14

4 Survey Results 15
4.1 Introduction 15
4.2 Material Risk Assessment 15
4.3 Asbestos Register 16
4.4 Negative Samples Register 17
4.5 Areas Not Accessed Register 17

5 Conclusions 54
5.1 General 54
5.2 Conclusions and Recommendations 54

Appendix A Site Plans 55

Appendix B Test Results 65

E-24679 Weobley High School 05 June 2023 Page 3 of 66


MAI.F5 (R11) January 2023
1 Executive Summary

Environmental Management Solutions Ltd (EMS) has undertaken a Management


Asbestos Survey at Weobley High School, Burton Wood, Weobley, Herefordshire,
HR4 8ST. The survey was undertaken by Jason Phillips of EMS on the 06 October
2021 to 07 October 2021.

The report was commissioned by Herefordshire Council to address the potential


risk of asbestos containing materials (ACMs) within the property as part of the
client’s commitment to the Control of Asbestos Regulations 2012 (CAR2012).

The scope of the survey included a management asbestos survey to Weobley High
School, Burton Wood, Weobley, Herefordshire HR4 8ST. The layout of the survey
can be seen on the appended plan.

The survey was carried out utilising standard access equipment as stated in our
terms and conditions, unless otherwise agreed. The scope excludes sub-surface
areas and soil contamination.
Full details of all materials, their locations, full MRA scores and management
recommendations can be found within the asbestos register section of the report.
Areas not accessed are also recorded.
In summary, the following materials were identified:

Asbestos Register & Risk Assessment: Weobley High School

Risk
Material Location Recommendation
Rating

Ground Floor, Classrooms


Debris to Pipe -
High and Staff Areas (Main Remove
Thermal Insulation
Building), 010

Subfloor Ducts - Ground Floor, Boiler


High Manage
Thermal Insulation Room Annex, 012

Debris - Thermal Ground Floor, Floor


High Manage
Insulation Ducts, 013

Pipe Residue - Ground Floor, Floor


High Manage
Thermal Insulation Ducts, 013

Packers and Panels - Ground Floor, Floor


High Manage
Insulating Board Ducts, 013

E-24679 Weobley High School 05 June 2023 Page 4 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment: Weobley High School

Risk
Material Location Recommendation
Rating

Debris - Thermal Ground Floor, Floor


High Manage
Insulation Ducts, 013

Debris - Thermal Ground Floor, Floor


High Manage
Insulation Ducts, 013

Debris - Thermal Ground Floor, Floor


High Manage
Insulation Ducts, 013

Ground Floor, Classrooms


Redundant Pipe -
Medium and Staff Areas (Main Manage
Cement
Building), 010

Wall - Thermal Ground Floor, Boiler


Medium Manage and Label
Insulation Room (Leak Area), 012

Wall - Thermal Ground Floor, Boiler


Medium Manage and Label
Insulation Room, 012

Wall - Thermal Ground Floor, Boiler


Medium Manage and Label
Insulation Room, 012

Wall - Thermal Ground Floor, Boiler


Medium Manage and Label
Insulation Room (Leak Area), 012

Wall - Thermal Ground Floor, Boiler


Medium Manage and Label
Insulation Room Annex, 012

Ground Floor, Classrooms


Window Panels -
Low and Staff Areas (Main Manage
Cement
Building), 010

Ground Floor, Classrooms


Ceiling Panels -
Low and Staff Areas (Main Manage
Insulating Board
Building), 010

Ground Floor, Classrooms


Ceiling Panels -
Low and Staff Areas (Main Manage
Insulating Board
Building), 010

Debris and Packers - Ground Floor, Floor


Low Manage
Cement Ducts, 013

Canopy and Soffit -


Low Main Building, 011 Manage
Insulating Board

E-24679 Weobley High School 05 June 2023 Page 5 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment: Weobley High School

Risk
Material Location Recommendation
Rating

Canopy and Soffit -


Low Main Building, 011 Manage
Insulating Board

Soffits - Insulating
Low Main Building, 011 Manage
Board

Floor Covering - Ground Floor, Classrooms


Very Low Manage
Bitumen (Science), 005

Floor Covering - Vinyl Ground Floor, Classrooms


Very Low Manage
Floor Tile (Science), 005

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Floor Adhesive -
Very Low and Staff Areas (Main Manage
Bitumen
Building), 010

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Floor Covering - Vinyl
Very Low and Staff Areas (Main Manage
Floor Tile
Building), 010

Ground Floor, Classrooms


Adhesive to Ceiling
Very Low and Staff Areas (Main Manage
Void - Bitumen
Building), 010

E-24679 Weobley High School 05 June 2023 Page 6 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment: Weobley High School

Risk
Material Location Recommendation
Rating

Flange Joint -
Ground Floor, Boiler
Very Low Gaskets Manage
Room, 012
(compressed)

Flange Joint -
Ground Floor, Boiler
Very Low Gaskets Manage
Room, 012
(compressed)

Debris - Vinyl Floor Ground Floor, Floor


Very Low Manage
Tile Ducts, 013

Felt Debris - Bitumen Ground Floor, Floor


Very Low Manage
felt Ducts, 013

Pipework - Gaskets Ground Floor, Floor


Very Low Manage
(compressed) Ducts, 013

Window Sills - 1st Floor, Classrooms


Very Low Manage
Cement (English), 002

Floor Covering - Vinyl 1st Floor, Classrooms


Very Low Manage
Floor Tile (English), 002

Floor Adhesive - 1st Floor, Classrooms


Very Low Manage
Bitumen (English), 002

Floor Adhesive - 1st Floor, Classrooms


Very Low Manage
Bitumen (Music), 003

Floor Adhesive - 1st Floor, Classrooms


Very Low Manage
Bitumen (Language), 004

2nd Floor, Classroom


Window Sills -
Very Low (Maths and Food & Manage
Cement
Textiles), 001

2nd Floor, Classroom


Floor Covering -
Very Low (Maths and Food & Manage
Bitumen
Textiles), 001

2nd Floor, Classroom


Floor Covering - Vinyl
Very Low (Maths and Food & Manage
Floor Tile
Textiles), 001

2nd Floor, Classroom


Grey Floor Covering -
Very Low (Maths and Food & Manage
Vinyl Floor Tile
Textiles), 001

E-24679 Weobley High School 05 June 2023 Page 7 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment: Weobley High School

Risk
Material Location Recommendation
Rating

Grey Floor Covering 2nd Floor, Classroom


Very Low in Room 2/002 - Vinyl (Maths and Food & Manage
Floor Tile Textiles), 001

No
Sealed Boxwork 016 Sealed Boxwork
Access

No access due to
No 2nd Floor, Classroom (Maths and Food & Textiles)
risk of excessive
Access 001 Duct/Riser
damage.

Services were live


at the time of
survey; there was
no access in live
equipment
including electrical
switchgear,
heaters, boilers,
extraction
equipment or any
No Throughout, Services 017 Services and Powered
other powered
Access Equipment
units

Further
investigation
maybe required if
the items are to be
disturbed during
any planned
maintenance or
refurbishment.

E-24679 Weobley High School 05 June 2023 Page 8 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment: Weobley High School

Risk
Material Location Recommendation
Rating

High level areas


cannot be
accessed without
specialist
equipment. On this
site, this includes
high level external
roofs, soffits and
fascia boards and
No the high level hall
Main Building 011 High Level Roof Areas
Access ceiling.

Further
investigation
maybe required if
the area is to be
disturbed during
any planned
maintenance or
refurbishment.

E-24679 Weobley High School 05 June 2023 Page 9 of 66


MAI.F5 (R11) January 2023
2 Introduction

2.1 General
Environmental Management Solutions Ltd (EMS), 22A King Street, Hereford, HR4
9DA has carried out a Management Asbestos Survey at Weobley High School,
Burton Wood, Weobley, Herefordshire, HR4 8ST. The survey was undertaken by
Jason Phillips of EMS on the 06 October 2021 to 07 October 2021.

The survey was commissioned by Herefordshire Council, Plough Lane, Hereford,


HR4 0LE. The purpose of this report is to address the potential for asbestos
containing materials (ACMs) within the property as part of the client’s commitment
to the Control of Asbestos Regulations (CAR). Appendix A shows the layout of the
areas surveyed.

2.2 Scope
The scope of the survey included a management asbestos survey to Weobley High
School, Burton Wood, Weobley, Herefordshire HR4 8ST. The layout of the survey
can be seen on the appended plan.
The survey was carried out utilising standard access equipment as stated in our
terms and conditions, unless otherwise agreed. The scope excludes sub-surface
areas and soil contamination.

2.3 Legislation
CAR2012 requires ‘Duty Holders’ to manage asbestos in their buildings by means
of an asbestos management plan. The first step of this is to locate, identify and risk
assess asbestos containing materials within each non-domestic premises. All
information, including this survey report, should be made available to contractors
working in the property and cascaded down to relevant people including those who
may come into contact with the material.
A management survey has been undertaken in accordance with EMS in-house
procedures and the Health and Safety Executive (HSE) Guidance HSG264
Asbestos: The survey guide. This report will describe the work carried out and
document the results to enable the asbestos risk in the building to be managed in
accordance with the appropriate regulations.

The survey will aim to identify suspect material, confirm by testing and presume by
inspection, those areas of asbestos containing material (ACM). These areas can
then be dealt with in the appropriate manner to prevent contamination of the
building or exposure of subcontractors, employees or members of the public to
unnecessary risk.

E-24679 Weobley High School 05 June 2023 Page 10 of 66


MAI.F5 (R11) January 2023
2.4 Asbestos Surveyors
CAR2012 and HSG 264 refer to asbestos surveys being carried out by “competent
persons” with experience, training and suitable qualifications. EMS confirm that
their lead surveyors hold a minimum of the British Occupational Hygiene Society
Module P402: Building Surveys and Bulk Sampling for Asbestos or equivalent and
will hold the relevant experience for the project they are undertaking. EMS maintain
a qualification and authorisation matrix in accordance with the UKAS document
RG8 ‘Accreditation of Bodies Surveying for Asbestos in Premises’.

2.5 Management Asbestos Survey


This report is a description of a management asbestos survey undertaken to
comply with legislation. The purpose of which is to determine the nature and extent
of any ACM within the premises. An assessment of the condition and proposed
risk of fibre release from any ACM identified is made. Remedial actions which may
be applicable are detailed if required.

The purpose of this report is:

• To determine the nature and extent of any identified ACM during


the site investigation

• To provide an assessment of the condition of ACM present and


risk of fibre release from the material

• To provide an assessment of the need for and scope of remedial


works to reduce risk to site operatives due to the actual presence
of ACM

A management asbestos survey is to allow everyday occupation and use of a


building and to allow minor foreseeable maintenance to be undertaken; therefore,
any intrusive maintenance, refurbishment or demolition will require a more intrusive
asbestos survey.

Generally, unless stated, a management asbestos survey will not include access
into sealed box work, beneath floorboards or into structural voids and cavities. The
survey should include areas that can be safely accessed without destructive entry
such as above suspended ceiling tiles, into basements and into floor ducts.

2.6 Limitations of the Report


This report is based on the information that has been made available to us from
the client regarding site operations. The conclusions drawn in the report are
considered correct although any subsequent additional information may allow
refinement of the conclusions. It should be noted that:

E-24679 Weobley High School 05 June 2023 Page 11 of 66


MAI.F5 (R11) January 2023
• The report has been prepared under the express instructions and solely for the
use of Herefordshire Council.

• The findings of this report represent the professional opinion of experienced


asbestos surveyors and is produced in accordance with EMS in house
procedures based upon the guidelines within the Health and Safety (HSE)
Guidance Health and Safety (HSE) Guidance HSG264 Asbestos: The survey
guide. EMS does not provide legal advice and the advice of lawyers may also
be required.

• All work carried out in preparing this report has utilised, and is based upon,
EMS’s current professional knowledge and understanding of current relevant
UK standards, codes, technology and legislation. Changes in this legislation
and guidance may occur at any time in the future and cause any conclusions
to become inappropriate or incorrect. EMS does not accept responsibility for
advising Herefordshire Council or other interested parties of the facts or
implications of any such changes.

• It is stressed that while every effort was made to identify the locations and full
extent of all asbestos materials in the specified area, such material may be
located within the structural matrix of the building or in other inaccessible
areas. It should be noted that this survey is not an intrusive level survey and
responsibility cannot be accepted for any materials located beyond the scope
of a management level survey. If asbestos materials have been suspected but
not sampled, this has been highlighted in the report.

• The report is limited to the areas identified by Herefordshire Council on this


site.

• All samples were analysed at our UKAS accredited laboratory in accordance


with our “in house” method of transmitted/polarised light microscopy and centre
stop dispersion staining and the methods outlined in HSG248. The certificates
of analysis are included in appendix B of this report.

E-24679 Weobley High School 05 June 2023 Page 12 of 66


MAI.F5 (R11) January 2023
3 Survey Description

3.1 Building description


The site consists of a mid 20th Century school unit which has been extended on

several occasions to provide further teaching and student facilities. Many areas

have been refurbished throughout the history of the unit. External asbestos

boarding is present along with modern uPVC capping and windows. Cement

windowsills remain in many rooms internally.

The main school structure is a three storey concrete and steel framed unit with

concrete floor slabs throughout. Floors are covered with asbestos vinyl floor tiles

in many areas; asbestos bitumen remains to the concrete slab where these tiles

have been historically removed. Walls are a mixture of solid and

plasterboard/timber partitions. Asbestos boarding was noted in several areas

(see asbestos register below)

Extensive ducts are present on the ground floor; these have insulation board and

thermal insulation debris within, plus cement and composite asbestos products

and associated debris. Heating for the unit is centred from the externally

accessed boiler room; insulation board debris is present in this area.


3.2 Areas Not accessed
In accordance with the HSE Guidance HSG264 Asbestos: The survey guide, areas
which cannot be accessed or inspected at the time of the survey must be presumed
to contain asbestos, unless there is strong evidence to prove otherwise. The areas
highlighted are only those that should be accessed on a management survey but
does not include those areas that would only be accessed by intrusive
investigation.

The areas not accessed during the survey can be found in the ‘No Access’ register
within Section 4.

3.3 Sampling Strategy


Sampling was not carried out where it would have caused unreasonable damage
to the buildings fabric or where it would be unsafe to do so. In some cases,
asbestos materials have been identified without sampling.

E-24679 Weobley High School 05 June 2023 Page 13 of 66


MAI.F5 (R11) January 2023
All sampling was undertaken in accordance with EMS in house procedures based
upon the guidelines within Health and Safety (HSE) Guidance HSG264 Asbestos:
The survey guide. The samples were double bagged, labelled and submitted to the
laboratory as bulk samples.

Samples taken during the survey are detailed on the test certificate in Appendix B.
Each sample, along with a photograph of each sampling point, is included within
the asbestos register in section 4 of this report; positive materials, along with
presumed materials, will be evaluated and risk assessed in accordance with
HSG264.

3.4 Presumed materials


In areas where sampling was not possible or practical, materials are either
presumed or strongly presumed in accordance with EMS in house procedures
based upon the guidelines within the HSE Guidance HSG264 Asbestos: The
survey guide.

As defined by the HSE, materials that are strongly presumed look as if they may
contain asbestos, upon visual inspection by an experienced, trained surveyor.
Materials that are presumed to contain asbestos where there is insufficient
evidence to confirm that it is asbestos free, or where a duty holder/surveyor
decides that it is easier under planned management arrangements to presume
certain materials to contain asbestos.

Presumed materials should be treated as asbestos containing materials until


proven otherwise and therefore are included in the asbestos register within this
report.

E-24679 Weobley High School 05 June 2023 Page 14 of 66


MAI.F5 (R11) January 2023
4 Survey Results

4.1 Introduction
All samples were analysed at our UKAS accredited laboratory in accordance with
our “in house” method of transmitted/polarised light microscopy and centre stop
dispersion staining and the methods outlined in HSG248. The certificates of
analysis are included in appendix B of this report.

4.2 Material Risk Assessment


Each ACM has been risk assessed in accordance with the algorithm within
HSG264 Asbestos: The survey guide; this is shown below. The Material Risk
Assessment (MRA) score identifies the risk level of the materials, that is, the risk
that the material will release airborne fibres if disturbed. Presumed materials are
scored as asbestos, as if they were asbestos containing.

Materials with assessment scores of 10 or more are regarded as having a high


potential to release fibres, if disturbed. Scores of between 7 and 9 are regarded as
having a medium potential, and between 5 and 6 a low potential. Scores of 4 or
less have a very low potential to release fibres. Non-asbestos materials are not
scored.

For presumed materials the asbestos type must be calculated as Crocidolite until
proved otherwise. In most cases it is unlikely that Crocidolite has been used; but
unless the material risk assessment highlights a medium or high potential for fibre
release it is acceptable to manage the presumed materials on the presumption of
Crocidolite. Further investigation may be required before major maintenance or
demolition.

E-24679 Weobley High School 05 June 2023 Page 15 of 66


MAI.F5 (R11) January 2023
Variable Score Examples of scores
Asbestos – reinforced composites (plastics, resins, mastics,
1 roofing felts, vinyl floor tiles, semi rigid paints, or decorative
Product
finishes, asbestos cement etc.)
type or
Asbestos insulating board, asbestos millboard, other low-density
debris
2 insulation boards, asbestos textiles, gaskets ropes and woven
from
textiles, asbestos paper and felt.
product
Thermal insulation (e.g. Pipe and boiler lagging) loose and
3
sprayed asbestos, asbestos mattresses and packing.
0 Good condition – no visible damage
Low damage – a few scratches or surface marks; broken edges
Extent of 1
on boards, tiles etc.
damage
Medium damage; significant breakage of materials or several
or
2 small areas where material has been damaged revealing loose
deteriorat
asbestos fibres.
ion
High damage or delamination of materials, sprays and thermal
3
insulation. Visible asbestos debris
Composite materials containing asbestos.: reinforced plastics,
0
resins and vinyl tiles
Surface Enclosed sprays and lagging, AIB (with exposed face painted or
1
treatment encapsulated) asbestos cement sheets etc
2 Unsealed AIB, or encapsulated lagging and sprays
3 Unsealed lagging and sprays
1 Chrysotile
Asbestos
2 Amphibole asbestos excluding Crocidolite
type
3 Crocidolite
Very Scores of 4 or less have a very low potential for fibre release if
Low disturbed.
Risk
Scores of between 5 and 6 have a low potential to release fibres if
Rating Low
disturbed.
Scores of between 7 and 9 have a medium potential to release
Med.
fibres if disturbed
Materials with assessment scores of 10 and more are regarded as
High
having a high potential to release fibres if disturbed

4.3 Asbestos Register


The asbestos register for the site, including the MRA scores, can be found overleaf.
The asbestos register contains materials both proven and presumed to contain
asbestos; the register also offers guidance as to whether work with each product
is likely to be classified as licensed, therefore requiring a licensed contractor and
a 14 day notification period. The basis for determining tasks that require a license
is dependent upon a risk assessment of the potential fibre release during work with
the product. Therefore, further assessment or consultation with the HSE may be
required.

Some work with Non-Licensed products may require notification to the HSE under
the category Notifiable Non-Licensed Work, again this is task dependant and each
task will require a specific risk assessment.

Along with the MRA scores recommendations have been made for future
management of the materials

E-24679 Weobley High School 05 June 2023 Page 16 of 66


MAI.F5 (R11) January 2023
4.4 Negative Samples Register
Samples that have tested negative for the presence for asbestos are presented
within the following register, along with photographs of each sampling point.

4.5 Areas Not Accessed Register


Areas that have not been accessed during the survey are presented within the
following register with a photograph of each location.

These areas have not been risk assessed but a worst case scenario of ‘High Risk’
of fibre release should be applied if these areas are disturbed.

E-24679 Weobley High School 05 June 2023 Page 17 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment

Weobley High School

Licensed?

Condition
Quantity

Access.

Product

Surface
Location / Sample ref MRA Comments /
Photograph Asbestos Type
Description /Presumed Score Recommendations

Ground Floor,

Approx. 30 m²
Classrooms

Medium
(Science), 005
2 Very
E-24679/S002 N 1 0 0 Chrysotile 1 Manage
Floor Covering - Low
Bitumen

Ground Floor,

Approx. 40 m²
Classrooms
(Science), 005 E-

Easy
2 Very
24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Floor Covering - Low
5181/VS022
Vinyl Floor Tile
Grey tiles

Ground Floor,
Classrooms and
Staff Areas (Main
Building), 010
Medium
1 m²

Strongly Presumed
Ceiling Panels - E-24679/SP Y 2 0 1 6 Low Manage
Asbestos 3
Insulating Board
Within electric
cupboard in room
0/027

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 18 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Classrooms and
Staff Areas (Main

Approx. 4 m²
Building), 010

Medium
Presumed Asbestos
Window Panels - E-24679/P N 1 0 1 5 Low Manage
3
Cement
Above door
entrances 0/021
and 0/015.
Ground Floor,
Classrooms and
Staff Areas (Main
Building), 010 N/ N/ N/ Removed

N/A
E-24679/R N N/A 00
A A A
Toilet Cistern -
Composite

Ground Floor,
Classrooms and
Staff Areas (Main

Approx. 400 m²
Building), 010

Medium
E-
Floor Adhesive - 2 Very
24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Bitumen Low
5181/008
Throughout all
ground floor
areas below
modern coverings

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 19 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Classrooms and
Staff Areas (Main

Approx. 180 m²
Building), 010

Medium
E-
Floor Covering - 2 Very
24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Vinyl Floor Tile Low
5181/017
Blue floor tiles
within 021
(Corridor) and
046 (Drama)
Ground Floor,
Classrooms and
Staff Areas (Main
Building), 010

Approx. 50 m²

Medium
Floor Covering - E-
2 Very
Vinyl Floor Tile 24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Low
5181/018
Black floor tiles
within 021
(Corridor), 046
(Drama) and 019
(Classroom)
No access was made
within the library at the
Ground Floor,
time of survey due to area
Classrooms and
being locked with no one
Staff Areas (Main
Building), 010 Small Amount with a key available during

Difficult
E- evening/night survey.
Debris to Pipe - 24679/PSEMS/ Y 3 3 3 Chrysotile 1 10 High
Further investigation is
Thermal 5181/021
recommended to inspect
Insulation
the extent of
Within ceiling old contamination within the
of 0/032 (Library) ceiling void.
Remove

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 20 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Classrooms and
Staff Areas (Main
Building), 010

Medium
E-

20 m²
2 Very
Floor Covering - 24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Low
Vinyl Floor Tile 5181/022
Grey floor tiles
within 0/029 and
0/041
Ground Floor,
Classrooms and
Staff Areas (Main

Medium
Building), 010 E-

4 m²
24679/PSEMS/ Y 2 0 1 Amosite, Chrysotile 2 5 Low Manage
Ceiling Panels -
5181/025
Insulating Board
Within 0/021
(Corridor)
Ground Floor,
Classrooms and Small amounts of cement
Staff Areas (Main debris are present to the

Medium
Building), 010 E-

1 lin m
Chrysotile, 7 ceiling below the flue.
24679/PSEMS/ N 1 2 1 Removal of the flue and
Redundant Pipe - Crocidolite 3 Medium
5181/029 debris is reccomended.
Cement
Within 0/007 Manage
(Staff room)
Ground Floor,
Classrooms and
Approx. 6 m²

Staff Areas (Main


Medium

Building), 010 E-
3 Very
24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Floor Covering - Low
5181/147
Vinyl Floor Tile
Blue tiles in 0/057
store cupboard

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 21 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Classrooms and
Staff Areas (Main

Approx. 6 m²
Building), 010

Medium
E-
3 Very
Floor Covering - 24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Low
Vinyl Floor Tile 5181/148
Black tiles in
0/057 store
cupboard
Ground Floor,
Classrooms and
Staff Areas (Main

Approx. 55 m²
Building), 010
E-

Easy
3 Very
Floor Covering - 24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Low
Vinyl Floor Tile 5181/149
Blue tiles in
rooms 0/065 and
0/075
Ground Floor,
Classrooms and
Staff Areas (Main
Building), 010

Approx.16 m²

Medium
Adhesive to E-
3 Very
Ceiling Void - 24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Low
Bitumen 5181/150
Adhesive to
ceiling void of
rooms 0/065 and
0/058

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 22 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Classrooms and
Staff Areas (Main
Building), 010
E-

Easy
8 m²
2 Very
Floor Covering - 24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Low
Vinyl Floor Tile 5181/206
Grey tiles in store
cupboard next to
staff room 0/006

Ground Floor, Subsurface ducts in this


Boiler Room school are known to

Throughout
Annex, 012 contain asbestos and must

Difficult
Presumed Asbestos be presumed throughout.
Subfloor Ducts - E-24679/P Y 3 3 1 10 High
3 Ducts remain sealed in
Thermal
Insulation 2023.
Manage

Walls have been scraped,


all loose debris has been

Throughout 7.5 m² Area


removed as far as
Ground Floor, possible in April 2023.
Boiler Room, 012 Walls have been repainted
Wall - Thermal with encapsulation paint.

Easy
E-24679/PSE- 7 However it must be noted
Insulation Y 3 0 2 Amosite, Chrysotile 2
15160/003 Medium that traces of fibres may
Thermal remain and encapsulated
insulation walls should continue to
residues to wall be managed in line with
the CAR2012.
Manage and Label

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 23 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Boiler Room
Annex, 012

Small Quantity
Removed
Bolt - Thermal Material has been
E-24679/PSE- N/ N/ N/

N/A
Insulation Y N/A 00 successfully removed in
15160/005 A A A
Thermal 2023. Paperwork should
insulation be filed accordingly.
residues to bolt of
beam
Ground Floor,

Very small quantities


Boiler Room
Annex, 012 Removed

Beam - Insulating E-24679/PSE- N/ N/ N/ Material has been

N/A
Y N/A 00 removed in April 2023.
Board 15160/006 A A A
Paperwork should be filed
Debris to nail accordingly.
holes of timber
batons
Walls have been scraped,
all loose debris has been

Throughout 7.5 m² Area


Ground Floor, removed as far as
Boiler Room possible in April 2023.
Annex, 012 Walls have been repainted
with encapsulation paint.

Easy
Wall - Thermal E-24679/PSE- 7 However it must be noted
Y 3 0 2 Amosite, Chrysotile 2
Insulation 15160/007 Medium that traces of fibres may
Thermal remain and encapsulated
insulation walls should continue to
residues to wall be managed in line with
the CAR2012.
Manage and Label

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 24 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Ground Floor,
Boiler Room
Annex, 012

Small Quantity
Removed
Pipe - Thermal
Insulation E-24679/PSE- N/ N/ N/ Joint has been cleaned in

N/A
Y N/A 00 April 2023. Paperwork
15160/008 A A A
Debris to joint should be filed
where lagging accordingly.
changes from
hardset to glass
fibre
Walls have been scraped,
Ground Floor, all loose debris has been

Throughout wall area behind


Boiler Room removed as far as
(Leak Area), 012 possible in April 2023.
Walls have been repainted

leaking pipe
Wall - Thermal
Insulation with encapsulation paint.

Easy
E-24679/PSE- 7 However it must be noted
Y 3 0 2 Amosite, Chrysotile 2
Thermal 15160/011 Medium that traces of fibres may
insulation remain and encapsulated
residues to wall. walls should continue to
Some be managed in line with
unencapsulated the CAR2012.
residues present.
Manage and Label

Ground Floor,

Throughout Area
Boiler Room
(Leak Area), 012 Removed
N/ N/ N/

N/A
E-24679/R Y N/A 00
Floor - Thermal A A A
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 25 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
All flange joint gaskets
should be treated as
Ground Floor, asbestos containing. Only

Small Amount
Boiler Room, 012 qualified operatives
holding task specific and

Easy
Flange Joint - E-24679/PSE- 4 Very
N 2 0 1 Chrysotile 1 appropriate asbestos
Gaskets 15610/002 Low
(compressed) awareness training should
undertake work on flange
joints on this site.
Manage
Walls have been scraped,
all loose debris has been

Throughout 7.5 m² Area


Ground Floor, removed as far as
Boiler Room, 012 possible in April 2023.
Walls have been repainted
Wall - Thermal with encapsulation paint.

Easy
Insulation E-24679/PSE- 7 However it must be noted
Y 3 0 2 Amosite, Chrysotile 2
15610/004 Medium that traces of fibres may
Thermal
insulation remain and encapsulated
residues to wall walls should continue to
behind pipes be managed in line with
the CAR2012.
Manage and Label
Walls have been scraped,
Ground Floor, all loose debris has been

Throughout wall area behind


Boiler Room removed as far as
(Leak Area), 012 possible in April 2023.
Wall - Thermal leaking pipe Walls have been repainted
Insulation Medium with encapsulation paint.
E-24679/PSE- 7 However it must be noted
Y 3 0 2 Amosite, Chrysotile 2
Thermal 15610/009 Medium that traces of fibres may
insulation remain and encapsulated
residues to wall. walls should continue to
Some be managed in line with
unencapsulated the CAR2012.
residues present.
Manage and Label

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 26 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment

Ground Floor,

Small Amount
Boiler Room, 012 All gaskets on site should

Medium
E- be treated as asbestos
Flange Joint - 4 Very
24679/PSEMS/ N 2 0 1 Chrysotile 1 containing.
Gaskets Low
5181/131
(compressed) Manage

Ground Floor,
Boiler Room, 012 Removed
N/ N/ N/

N/A
E-24679/R N N/A 00
Debris - Cement A A A

Ground Floor,
Boiler Room, 012
E- Removed
N/ N/ N/

N/A
Debris - 24679/PSEMS/ Y N/A 00
A A A
Insulating Board 5181/136

Material previously
Ground Floor, Small Amount identifed and presumed to
Floor Ducts, 013 remain in situ.
E- Difficult 3 Very
Debris - Vinyl 24679/PSEMS/ N 1 1 0 Chrysotile 1 An environmental clean
Low
Floor Tile 5181/102 throughout the ducts is
recommended.
Manage

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 27 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment

Material previously
Ground Floor, identifed and presumed to

Throughout
Floor Ducts, 013 remain in situ.

Difficult
E-
Debris - Thermal 24679/PSEMS/ Y 3 3 3 Chrysotile 1 10 High An environmental clean
Insulation 5181/103 throughout the ducts is
recommended.
Manage

Material previously
Ground Floor,
identifed and presumed to
Floor Ducts, 013

Throughout
remain in situ.

Difficult
E-
Pipe Residue -
24679/PSEMS/ Y 3 3 3 Chrysotile 1 10 High An environmental clean
Thermal
5181/104 throughout the ducts is
Insulation
recommended.
Manage

Material previously
Ground Floor,
identifed and presumed to

Small Amount
Floor Ducts, 013
remain in situ.

Difficult
E-
Debris and
24679/PSEMS/ N 1 3 1 Chrysotile 1 6 Low An environmental clean
Packers -
5181/105 throughout the ducts is
Cement
recommended.
Manage

Ground Floor, Material previously


Floor Ducts, 013 identifed and presumed to
Throughout
remain in situ.
Packers and E- Difficult
Panels - 24679/PSEMS/ Y 2 3 3 Amosite, Chrysotile 2 10 High An environmental clean
Insulating Board 5181/112 throughout the ducts is
recommended.
Around pipe
entries Manage

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 28 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment

Material previously
Ground Floor, identifed and presumed to

Small Amount
Floor Ducts, 013 remain in situ.

Difficult
E-
4 Very
Felt Debris - 24679/PSEMS/ N 1 2 0 Chrysotile 1 An environmental clean
Low
Bitumen felt 5181/116 throughout the ducts is
recommended.
Manage

Material previously
Ground Floor, identifed and presumed to

Throughout
Floor Ducts, 013 remain in situ.

Difficult
E-
Debris - Thermal 24679/PSEMS/ Y 3 3 3 Chrysotile 1 10 High An environmental clean
Insulation 5181/119 throughout the ducts is
recommended.
Manage

Material previously
Ground Floor, identifed and presumed to

Throughout
Floor Ducts, 013 remain in situ.

Difficult
E-
Debris - Thermal 24679/PSEMS/ Y 3 3 3 Amosite 2 11 High An environmental clean
Insulation 5181/121 throughout the ducts is
recommended.
Manage

Material previously
Ground Floor, identifed and presumed to
Throughout
Floor Ducts, 013 remain in situ.
E- Difficult
Debris - Thermal 24679/PSEMS/ Y 3 3 3 Amosite, Chrysotile 2 11 High An environmental clean
Insulation 5181/123 throughout the ducts is
recommended.
Manage

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 29 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Material previously
Ground Floor,
identifed and presumed to

Small Amount
Floor Ducts, 013
remain in situ.

Difficult
E-
Pipework - 4 Very
24679/PSEMS/ N 2 0 1 Chrysotile 1 An environmental clean
Gaskets Low
5181/127 throughout the ducts is
(compressed)
recommended.
Manage

1st Floor,

Approx. 200 m²
Classrooms
(English), 002

Medium
E-
2 Very
Floor Adhesive - 24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Low
Bitumen 5181/008
Presumed
throughout
1st Floor,
Classrooms

Approx. 180 m²
(English), 002
Below modern floor

Medium
E-
Floor Covering - 3 Very coverings
24679/PSEMS/ N 1 1 0 Chrysotile 1
Vinyl Floor Tile Low
5181/012 Manage
Within 1A/002,
1A/006 and
1A/007
1st Floor,
Classrooms
(English), 002
Wall Panels - N/A N/ N/ N/ Removed
E-24679/R N N/A 00
Insulating Board A A A
Behind
blackboards in
1A/003

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 30 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
1st Floor,
Classrooms

Approx. 40 lin m
(English), 002
Presumed to remain in situ

Medium
Window Sills - E-
4 Very below modern sills
Cement 24679/PSVSE N 1 1 1 Chrysotile 1
Low
MS/5181/005 Manage
Within 1A/003,
1A/002, 1A/006,
1A/007, 1A/010
and 1A/012
1st Floor,
Classrooms

Approx. 45 m²
(Music), 003

Medium
E-
2 Very
Floor Adhesive - 24679/PSEMS/ N 1 0 0 Chrysotile 1 Manage
Low
Bitumen 5181/008
Presumed
throughout
1st Floor,
Classrooms

Approx. 90 m²
(Language), 004

Medium
E- Below carpet
2 Very
Floor Adhesive - 24679/PSEMS/ N 1 0 0 Chrysotile 1
Low Manage
Bitumen 5181/008
Presumed
throughout

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 31 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
2nd Floor,
Classroom
(Maths and Food

Approx. 40 lin m
& Textiles), 001
Window Sills - E-

Easy
4 Very
Cement 24679/PSEMS/ N 1 1 1 Chrysotile 1 Manage
Low
5181/005
Within rooms
2/004, 2/003,
2/008, 2/010 and
cleaning
cupboard
2nd Floor,
Classroom

Approx. 200 m²
(Maths and Food

Medium
& Textiles), 001 E-
3 Very
24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Floor Covering - Low
5181/008
Bitumen
Adhesive to floor
throughout
2nd Floor,
Classroom
(Maths and Food

Approx. 80 m²
& Textiles), 001
E-

Easy
3 Very
Grey Floor 24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Low
Covering in 5181/011
Room 2/002 -
Vinyl Floor Tile

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 32 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
2nd Floor,
Classroom
(Maths and Food
& Textiles), 001 E-

Easy
3 m²
3 Very
24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Floor Covering - Low
5181/203
Vinyl Floor Tile
Within cleaners
cupboard 2/007
2nd Floor,
Classroom
(Maths and Food
& Textiles), 001
E-

Easy
6 m²
3 Very
Grey Floor 24679/PSEMS/ N 1 1 0 Chrysotile 1 Manage
Low
Covering - Vinyl 5181/204
Floor Tile
Within store
2/009

Main Building,
011

Medium
E-

3 m²
Canopy and Soffit 24679/PSEMS/ Y 2 0 1 Amosite, Chrysotile 2 5 Low Manage
- Insulating Board 5181/141
To 0/059

Approx. 10 Lin m
Main Building,
011 Medium
E-
Canopy and Soffit 24679/PSEMS/ Y 2 1 1 Amosite, Chrysotile 2 6 Low Manage
- Insulating Board 5181/143
To 0/005

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 33 of 66


MAI.F5 (R11) January 2023
Asbestos Register & Risk Assessment
Main Building,
011

Approx. 30 lin m
Soffits - Insulating
Board

Medium
E-
Outside rooms 24679/PSVSE Y 2 1 1 Amosite, Chrysotile 2 6 Low Manage
0/017, 0/020, MS/5181/143
0/046 and all high
level first and
second floor soffit
boards.

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 34 of 66


MAI.F5 (R11) January 2023
Negative Samples

Weobley High School

Location / Description Photograph Sample Ref Asbestos Type Comments

Ground Floor,
Classrooms (Science)
005 E-24679/S003 No Asbestos Detected in Sample

Ceiling Void - Bitumen

Ground Floor,
Classrooms (Science)
005 E-24679/S004 No Asbestos Detected in Sample
Ceiling Void - Insulating
Board

Ground Floor,
Classrooms (Science) E-
005 24679/PSEMS/51 No Asbestos Detected in Sample
Beam Cladding - 81/023
Insulating Board

Ground Floor,
Classrooms (Science E-
Area) 005 24679/PSEMS/51 No Asbestos Detected in Sample
Floor Covering - Linoleum 81/024
Floor Covering

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 35 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor,
Classrooms (Science E-
Area) 005 24679/PSEMS/51 No Asbestos Detected in Sample
81/LIB001
Adhesive - Bitumen

Ground Floor,
Classrooms (Science E-
Area) 005 24679/PSEMS/51 No Asbestos Detected in Sample
81/LIB002
Adhesive - Bitumen

Ground Floor,
Classrooms (Science E-
Area) 005 24679/PSEMS/51 No Asbestos Detected in Sample
Pipework Debris - 81/LIB003
Thermal Insulation

Ground Floor,
Classrooms and Staff
Areas (Main Building) 010 E-24679/S005 No Asbestos Detected in Sample

Ceiling Void - Bitumen felt

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 36 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor,
Classrooms and Staff
Areas (Main Building) 010 E-24679/S006 No Asbestos Detected in Sample
Floor Covering - Linoleum
Floor Covering

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSEMS/51 No Asbestos Detected in Sample
Ceiling Panel - Insulating 81/026
Board

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSEMS/51 No Asbestos Detected in Sample
Engineering Flooring - 81/027
Vinyl Floor Tile

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSEMS/51 No Asbestos Detected in Sample
81/028
Sink Pad - Composite

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 37 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSEMS/51 No Asbestos Detected in Sample
81/030
Sink Pad - Composite

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSEMS/51 No Asbestos Detected in Sample
Floor Covering - Linoleum 81/145
Floor Covering

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSEMS/51 No Asbestos Detected in Sample
81/146
Stair Nosing - Composite

Ground Floor,
Classrooms and Staff E-
Areas (Main Building) 010 24679/PSVSEMS/ No Asbestos Detected in Sample
Stanchion Cladding - 5181/023
Insulating Board

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 38 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Boiler


Room Annex 012 E-24679/PSE-
No Asbestos Detected in Sample
15160/001
Pipe - Thermal Insulation

Walls have been encapsulated however


it must be noted that thermal insulation
Ground Floor, Boiler debris remains beneath the thin paint
Room (Leak Area) 012 E-24679/PSE- coat and is vulnerable Some
No Asbestos Detected in Sample
15160/010 unencapsulated debris also noted in this
Wall - Thermal Insulation area. Labelling strongly recommended.
Rencapsulation should be considered
before works. Manage in line with the
CAR2012. Sample points were re-
encapsulated following sampling. A mix
of asbstos and non asbestos residues
Ground Floor, Boiler
E-24679/PSE- aregreen
Smaller present in this
pipes arelocality.
lagged with
Room Annex 012 No Asbestos Detected in Sample
15160/VS001 glass fibre
Pipe - Thermal Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipework - Thermal 81/128
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 39 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipework - Thermal 81/129
Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipework Debris - 81/130
Thermal Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipework - Thermal 81/132
Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipework Debris - 81/133
Thermal Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 40 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Debris - Thermal 81/135
Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Debris - Thermal 81/137
Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Debris - Thermal 81/138
Insulation

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Debris - Thermal 81/139
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 41 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Boiler


Room 012 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Debris - Thermal 81/140
Insulation

Ground Floor, Floor E-


Ducts 013 24679/PSEMS/51 No Asbestos Detected in Sample
Felt Debris - Bitumen felt 81/101

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/107
Insulation

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/108
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 42 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/109
Insulation

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/110
Insulation

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/111
Insulation

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/113
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 43 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/114
Insulation

Ground Floor, Floor E-


Ducts 013 24679/PSEMS/51 No Asbestos Detected in Sample
Felt Debris - Bitumen felt 81/115

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Cable Wrap - Woven 81/117
Product

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Gaskets - Gaskets 81/118
(compressed)

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 44 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Floor E-


Ducts 013 24679/PSEMS/51 No Asbestos Detected in Sample
Felt Debris - Bitumen felt 81/120

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/122
Insulation

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/124
Insulation

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/125
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 45 of 66


MAI.F5 (R11) January 2023
Negative Samples

Ground Floor, Floor


Ducts 013 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/126
Insulation

1st Floor, Classrooms E-


(English) 002 24679/PSEMS/51 No Asbestos Detected in Sample
Door Kicker - Composite 81/014

1st Floor, Classrooms


(English) 002 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/201
Insulation

1st Floor, Classrooms


(English) 002 E-
24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/202
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 46 of 66


MAI.F5 (R11) January 2023
Negative Samples

1st Floor, Classrooms E-


(Language) 004 24679/PSEMS/51 No Asbestos Detected in Sample
Ceiling Void - Bitumen 81/015

1st Floor, Classrooms


(Language) 004 E-
24679/PSEMS/51 No Asbestos Detected in Sample Below carpet
Floor Covering - Linoleum 81/016
Floor Covering

2nd Floor, Classroom


(Maths and Food &
Textiles) 001 E-24679/S001 No Asbestos Detected in Sample
Ironing Board Panel -
Insulating Board

2nd Floor, Classroom


(Maths and Food & E-
Textiles) 001 24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/004
Insulation

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 47 of 66


MAI.F5 (R11) January 2023
Negative Samples

2nd Floor, Classroom


(Maths and Food & E-
Textiles) 001 24679/PSEMS/51 No Asbestos Detected in Sample
81/006
Sink Pads - Composite

2nd Floor, Classroom


(Maths and Food & E-
Textiles) 001 24679/PSEMS/51 No Asbestos Detected in Sample
81/007
Sink Pad - Composite

2nd Floor, Classroom


(Maths and Food & E-
Textiles) 001 24679/PSEMS/51 No Asbestos Detected in Sample
Aluminium Windows - 81/009
Mastic

2nd Floor, Classroom


(Maths and Food & E-
Textiles) 001 24679/PSEMS/51 No Asbestos Detected in Sample
81/010
Stair Nosing - Composite

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 48 of 66


MAI.F5 (R11) January 2023
Negative Samples

2nd Floor, Tank Room


above Classroom (Maths E-
and Food & Textiles) 014 24679/PSEMS/51 No Asbestos Detected in Sample
81/001
Roof Felt - Bitumen felt

2nd Floor, Tank Room


above Classroom (Maths E-
and Food & Textiles) 014 24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/002
Insulation

2nd Floor, Tank Room


above Classroom (Maths E-
and Food & Textiles) 014 24679/PSEMS/51 No Asbestos Detected in Sample
Pipe Debris - Thermal 81/003
Insulation

Portacabin 1 (RE) 006


External Render - E-24679/S007 No Asbestos Detected in Sample
Textured Coating

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 49 of 66


MAI.F5 (R11) January 2023
Negative Samples

Portacabin 1 (RE) 006


External Render - E-24679/VS007 No Asbestos Detected in Sample
Textured Coating

Portacabin 2 (Geography
and History) 007
E-24679/VS007 No Asbestos Detected in Sample
External Render -
Textured Coating

Portacabin 3 (The Arc)


008
E-24679/VS007 No Asbestos Detected in Sample
External Render -
Textured Coating

Main Building 011


Damp Proof Course - E-24679/S008 No Asbestos Detected in Sample
Composite

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 50 of 66


MAI.F5 (R11) January 2023
Negative Samples

Main Building 011 E-


Damp Proof Course - 24679/PSEMS/51 No Asbestos Detected in Sample
Composite 81/142

Portacabin 4 (Storage)
015
E-24679/VS007 No Asbestos Detected in Sample
External Render -
Textured Coating

Key: S=Sampled, P=Presumed, SP=Strongly Presumed, VS=Visually Similar

E-24679 Weobley High School 05 June 2023 Page 51 of 66


MAI.F5 (R11) January 2023
No Accessed Areas
Weobley High School
Location / Description Photograph Recommended Action

Sealed Boxwork 016


Sealed Boxwork - No Access Gained

2nd Floor, Classroom (Maths and Food & Textiles) 001 No access due to risk of excessive damage.
Duct/Riser - No Access Gained

Services were live at the time of survey; there was no access in live
equipment including electrical switchgear, heaters, boilers, extraction
Throughout, Services 017 equipment or any other powered units

Services and Powered Equipment - No Access Gained Further investigation maybe required if the items are to be disturbed
during any planned maintenance or refurbishment.

E-24679 Weobley High School 05 June 2023 Page 52 of 66


MAI.F5 (R11) January 2023
No Accessed Areas

High level areas cannot be accessed without specialist equipment.


On this site, this includes high level external roofs, soffits and fascia
Main Building 011 boards and the high level hall ceiling.

High Level Roof Areas - No Access Gained Further investigation maybe required if the area is to be disturbed
during any planned maintenance or refurbishment.

E-24679 Weobley High School 05 June 2023 Page 53 of 66


MAI.F5 (R11) January 2023
5 Conclusions

5.1 General
During the survey asbestos materials have been identified on the site. Any
identified materials and associated material risk assessment are detailed in the
tables in Section 4 of this report. In addition, any no accessed areas are recorded
in the relevant table.

5.2 Conclusions and Recommendations


Each positively identified material has been risk assessed and individual
recommendations made, these can be found in Section 4 of this report, however
these following recommendations may also be noted.

Under CAR 2012, there is a legal duty to manage asbestos within any non-
domestic premises. The survey is the first stage of that process but is not enough
to comply with the regulations.

Any materials identified within the survey will require regular monitoring as a
minimum level of management. All site procedures, re-inspections and priority
ratings should be included in the Asbestos Management Plan (AMP) for the site.
The AMP must include a procedure for controlling maintenance and/or
refurbishment works. Areas not accessed as part of this survey must be considered
as part of the AMP.

If any intrusive maintenance or refurbishment works are planned a more intrusive


survey will be required.

Any work on or adjacent to asbestos containing materials will require a specific risk
assessment and this will determine if notification to the HSE or a licensed
contractor is required.

E-24679 Weobley High School 05 June 2023 Page 54 of 66


MAI.F5 (R11) January 2023
Appendix A
Site Plans

E-24679 Weobley High School 05 June 2023 Page 55 of 66


MAI.F5 (R11) January 2023
Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 56 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 57 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 58 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 59 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 60 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 61 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 62 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 63 of 66

MAI.F5 (R11) January 2023


Project:
Weobley High School

Project No.: E-24679


Date of Survey: 06 October 2021
Building Ref: 1

Page 64 of 66

MAI.F5 (R11) January 2023


Appendix B
Test Results

E-24679 Weobley High School 05 June 2023 Page 65 of 66


MAI.F5 (R11) January 2023
E-24679 Weobley High School 05 June 2023 Page 66 of 66
MAI.F5 (R11) January 2023