You are on page 1of 1

KEY PLAN:

GOLF
310+580.326

DISTRICT
GDW-01
GOLF
COURSE

WEST
213593.8
GCR-01
RESIDEN

06
TIAL

T 1/6 R50

T 1/6 R50
RESIDENTIAL
WFR-03
WATERFRONT
212097.142

T 1/6 R50
T 1/6 R50

WATERFRONT
FR0M 11kV

211+092.967
WFR-02
RESIDENTIAL
SWITCHGEAR,
GSD-03

05
R
1
6/
T
DISTRICT
GOLF
GSD-03
612+030.712

GOLF

T 1/6 R50
DISTRICT
GDS-02
611+233

.550

T 1/6 R50
S/S 40462

FOX
412+321.9
FXH-05
HILLS 87

WATERFRONT
210046.655
WFR-01
RESIDENTIAL
GOLF
GDS-01
610+485.
DISTRIC

738 T

T
1/6
R50

R50
1/6
T
EDUCATION
510+844.130
EDD-03
MEDICAL

DISTRICT
312+728.251

MEC-01
DISTRICT

T 1/6 R50
T 1/6 R50

T 1/6 R50

T 1/6 R50

FOX
411+843.970
FXH-04
HILLS
T 1/6 R50
DISTRICT
EDUCATION
EDD-02
313+342.335

WATERFR
112+416.57
WFC-04
ONT
T 1/6 R50

COMMER
5
T 1/6 R50

CIAL
411+337.899

FOX
FXH-03
HILLS
05R 6/1 T
EDUCATION

R50
1/6
T
314+176.193
EDD-01

05R 6/1 T
DISTRICT

WATERFRONT
111+799.483
WFC-03
CENTRAL

COMMERCIAL
810+000.000

PZC-01
PZC-01
PLAZA
NORTH
BOULEVARD
BLN-01
810+921.731

T 1/6 R50
R50
1/6
T

410+850.520

FOX HILLS
FXH-02
NORTH
BLN-02
BOULEVARD
811+264.678

810+911.858
BLS-01SOUTH
BOULEVARD

T 1/6 R50
811+254.805
T 1/6 R50 BLS-02 SOUTH
BOULEVARD

T 1/6 R50 T 1/6 R50 T 1/6 R50

05R 6/1 T
05R 6/1 T

T 1/6 R50
T 1/6 R50

T 1/6 R50

WATER
T 1/6 R50

05R 6/1 T

05R 6/1 T
T 1/6 R50

FRONT
111+19
WFC-02

COMME
6.254

RCIAL
05R 6/1 T

410+355.752

FOX HILLS
FXH-01
05R 6/1 T

WATERF

RONTWFC-01 .935
ENERGY
512+678.033
EC2-01

110+786

COMME
CITY

RCIAL

QATAR
ENTERTAINMEN
110+231.879

QEC-02
S/S 40462

T CITY
TX-2
Sn= 1600kVA
11/0.433 kV
(OIL TYPE)
z=(6.00%)

7x1c 800mm²
FEEDER PILLAR-2 (LOCATED INSIDE THE SS)
(INDOOR TYPE)
TCL = 3320 kVA
MDL = 2100 kVA
DMDL = 1344
NOTES:
kVA - THE LOCATION OF PRIVATE SUBSTATIONS ARE
INDICATIVE ONLY. THE EXACT LOCATION SHALL BE
FINALIZED DURING RESPECTIVE BP PROCESSING.
- ALL 11KV CABLES ARE 3C-300mm² XLPE+ FO CABLES.
THE 3C-300mm² CABLES ARE LAID AT A SPACING OF
FEEDER PILLAR AS PER 50CM THUS REDUCING THE CURRENT CARRYING
KAHRAMAA SPECIFICATION
CAPACITY TO THAT OF 3C-240mm².
2500A; 40kA, 1 sec; 415V, 3Ph+N+E, - IN ALL SECONDARY SUBSTATION FEEDER BREAKERS
50Hz. Cu BUSBAR SHALL BE PROVIDED WITH DIRECTIONAL
F7 F8 F9 F10 F11 F12 OVER CURRENT AND DIRECTIONAL EARTH FAULT
HRC HRC HRC HRC HRC HRC PROTECTION (TYPE4).
355 355 355 355 355 355
STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY - THE LOCATION OF ALL ELECTRICAL EQUIPMENT SUCH
SIZE 3 SIZE 3 SIZE 3 SIZE 3 SIZE 3 SIZE 3 AS FEEDER PILLAR, KWHR METER, SERVICE CABINET,
MINI PILLAR ETC, ARE INDICATIVE ONLY. THE EXACT
LOCATION WILL BE AS PER THE AS-BUILT DRAWINGS.

4C 300
4C 300

4C 300

4C 300

4C 300
133m

144m
45m

68m

82m
- IN CASE DETAILS/ MATERIALS ON THE DRAWINGS
3m 3m 3m
CONTRADICT WITH KM STANDARDS AND
SPECIFICATION, THEN THE LATER SHALL PREVAIL.
150A 4C 70

150A 4C 70

150A 4C 70
- COMPLETE DISTRIBUTION DESIGN RESPONSIBILITY TO
4C 300

4C 300

4C 300
16m

SPARE
16m

16m
THE INFRASTRUCTURE CONSULTANT.
kWh 3m kWh 3m kWh 3m - CLIENT TO APPOINT A KM APPROVED
CONTRACTOR TO EXECUTE WORK AT SITE.
VD=0.64%

VD=1.82%

VD=1.14%

150A 4C 70
150A 4C 70

150A 4C 70
- TARIFF METERING FOR ALL LUSAIL PROJECTS ARE AT
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA


THE LV SIDE, EXCEPT OTHERWISE STATED.
- LV CABLES ARE LAID AT A SPACING OF 40CM.
4C 300

4C 300

4C 300
21m

21m
REF: Cb-01-0011

REF: Ca-01-0222

REF: Cb-01-0013

21m
kWh kWh kWh - ALL PERMANENT SECONDARY SUBSTATIONS ARE
VD=0.83%

VD=2.01%
INDOOR TYPE.

VD=1.33%
- ALL 11KV SWITCHGEARS SHOULD BE KM STANDARD
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA


3m 3m 3m
WITH 31.5 KA/3SEC FAULT RATING.
- THIS SCHEME IS SUBJECT TO ALL CONDITIONS
150A 4C 70

150A 4C 70
150A 4C 70
REF: Ca-01-0226

REF: Ca-01-0221

REF: Ca-01-0205
MENTIONED IN THE APPROVAL LETTER REF.NO.
4C 300

4C 300

4C 300
16m
16m

16m
EP/MO/3378/2023. DATED: 24-09-2023.
kWh 3m kWh 3m kWh 3m - ALL DISTRIBUTION SUBSTATIONS ARE STANDARD
DOUBLE INDOOR TYPE WITH 4x 1600 KVA OIL TYPE Tx,
VD=0.99%

VD=2.17%

VD=1.49%

150A 4C 70
150A 4C 70

150A 4C 70
4C 300

4C 300

4C 300
4x 6W FSFP, WITH NATURAL VENTILATION,
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA

2m
2m

2m
STANDALONE AT GROUND FLOOR.
PE PE PE
REF: Ca-01-0227

REF: Ca-01-0220

REF: Ca-01-0206
kWh kWh kWh
INFRASTRUCTURE PROJECT.
VD=1.06%

VD=2.24%

VD=1.55%
ALL MATERIAL & LABOR BY CLIENT.
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA


ALL COST TO CLIENT. NO COST TO KM.
REF: Ca-01-0228

REF: Ca-01-0219

REF: Ca-01-0207
3m 3m
150A 4C 70

150A 4C 70
Las sa e : Tue, 3 Oc 2023 08:21 am

4C 300

4C 300
16m

13m

kWh 3m kWh 3m
LUS-CP28B-QDSBG-DWG-EL-01304-006
VD=0.95%

VD=1.97%
150A 4C 70

150A 4C 70
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA


4C 300

4C 300
22m

22m
REF: Cb-01-0012

REF: Ca-01-0208

kWh kWh
VD=1.14%

VD=2.13%
TCL= kVA MDL= kVA

TCL=166 kVA MDL=105kVA

3m 3m
105
150A 4C 70

150A 4C 70
REF: Ca-01-0225

REF: Ca-01-0209
4C 300

4C 300
16m

16m
166

kWh 3m kWh 3m
CAD Re : e ec bs01 R a Scheme LUSAIL 4-415-2023 4-415-2023-P36-P131.

VD=1.31%

VD=2.30%
150A 4C 70

150A 4C 70
4C 300

4C 300
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA

2m
2m

PE PE
REF: Ca-01-0224

REF: Ca-01-0210

kWh kWh
VD=1.37%

VD=2.36%
TCL=166 kVA MDL=105kVA

TCL=166 kVA MDL=105kVA


REF: Ca-01-0223

REF: Ca-01-0211

SUPPLY TO HUZOOM DISTRCIT PHASE 1


IN LUSAIL CITY
LV SCHEMATIC OF S/S 40462- TX2
AN/SSS 26-09-2023 N.T.S

DISTRIBUTION SUBSTATION SS.40462, FP-02 YA

AA For/
HW

MM

ZONE: 69
4-415-2023
0 41/158

IN CO-OPERATION WITH ALL GIS AGENCIES