Sequence-of-Operation Event Summary Report

Symmetrical 3-Phase Fault at ER-18-SW-550-098-502.

Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition


1.0 R-MTR4 11.191 1.0 Phase - OC1 - 50

84.3 BRK-15A5 83.3 Tripped by R-MTR4 Phase - OC1 - 50

100 REL-T2-SEC-F2 10.967 100 Phase - OC1 - 50

150 REL-T2-SEC-T2 10.967 150 Phase - OC1 - 50

183 BKR-3 83.3 Tripped by REL-T2-SEC-F2 Phase - OC1 - 50

183 BKR-4 83.3 Tripped by REL-T2-SEC-F2 Phase - OC1 - 50

200 REL-T2-PRI-F2 0.679 200 Phase - OC1 - 50

233 BKR-3 83.3 Tripped by REL-T2-SEC-T2 Phase - OC1 - 50

233 BKR-4 83.3 Tripped by REL-T2-SEC-T2 Phase - OC1 - 50

250 REL-T2-PRI-T2 0.679 250 Phase - OC1 - 50

250 CB-550-098-2 50.0 Tripped by REL-T2-PRI-F2 Phase - OC1 - 50

300 CB-550-098-2 50.0 Tripped by REL-T2-PRI-T2 Phase - OC1 - 50