You are on page 1of 3

Design Typical Drawing ID-F-FT-KK1-DTD-WP-00-0019_R0B

Anchor Pattern For Pipeline Installation (Initiation/Start-Up, Normal Lay & Laydown) Sheet 1
Medco E&P Natuna Ltd.

Revision Sheet

REVISION DATE DESCRIPTION OF CHANGE

0A 04 Nov 22 Issued for Comment

0A 18 Nov 22 Page 1

CPY Comment:
Please check DMA Catenary for 10T flipper delta anchor and no uplift
anchor is allowed for flipper delta

MEI Reponses:
General change, 12T Stevshark will be utilized for DMA Anchor. Catenary
profile is checked on Pipeline Installation Databooks

0A 18 Nov 22 Page 1

CPY Comment:
Please add position for stinger and DMA installation and approaching to
Bronang jacket for pipeline initiation

MEI Reponses:
Incorporated, DMA will be installed at Position 1

0A 18 Nov 22 Page 1

CPY Comment:
Position 1 using only 7 anchors please check stinger and vessel
excursion.
what is limiting weather during initiation and normal pipelaying? please
present it in the table

MEI Reponses:
Excursion checked on the mooring analysis, and limiting weather is
presented in graphic to simplify the display.

0A 18 Nov 22 Page 1

CPY Comment:
Please present distance between pipeline route and ANM-4. what is the
mitigation to avoid pipeline clashing witn ANM-4
MEI Reponses:
Result from prelay survey, ANM-4 doesn’t indicate any concern.

0A 11 Nov 22 Page 1

CPY Comment:
Please present minimum and maximum tension to have safe mooring line
without anchor dragging and safe for existing assets or comply with
minimum requirement of vertical clearance (allowable tension) for
reference winch operator on board during monitoring mooring line tension

MEI Reponses:
Incorporated

0B 21 Mar 23 Issued for Approval


Design Typical Drawing ID-F-FT-KK1-DTD-WP-00-0019_R0B
Anchor Pattern For Pipeline Installation (Initiation/Start-Up, Normal Lay & Laydown) Sheet 1
Medco E&P Natuna Ltd.

Additional Approvers (If Applicable)

Name Designation Signature Date


.0m
91
PR
OP
OS
ED

PC 6 91.0m
AA
G TE
LE
CO
MM

PIP
UN
ICA
TIO

EL
N
CA
BL
E

INE
PC 7

.0m
AP
G TE
LE
CO
MM
UN
ICA

91
TIO
N
CA
BL
E

Pro
po
se
dP
ipel
ine

PC 6
PC 7

UN
KN
OW
N SU
BS
EA
CA
BL
E

PC 1

m
91.0
1 . 0 m
9 KP
11.5

WAVE ROSE DIAGRAM (MAY) WIND ROSE DIAGRAM (MAY)

895

m
91.5
1 . 0 m
9
m
91.0

91
89.5m
W
BO

.0m
W
BO

m
91.0
.0m

W
BO
91

W
BO

BOW
m
91.5
.0m

. 5 m
91

9 1
PC 1

MEDCOENERGI
Oil Gas

You might also like