Anchor Pattern For Pipeline Installation (Initiation/Start-Up, Normal Lay & Laydown) Sheet 1
Medco E&P Natuna Ltd.
Revision Sheet
0A 18 Nov 22 Page 1
CPY Comment:
Please check DMA Catenary for 10T flipper delta anchor and no uplift
anchor is allowed for flipper delta
MEI Reponses:
General change, 12T Stevshark will be utilized for DMA Anchor. Catenary
profile is checked on Pipeline Installation Databooks
0A 18 Nov 22 Page 1
CPY Comment:
Please add position for stinger and DMA installation and approaching to
Bronang jacket for pipeline initiation
MEI Reponses:
Incorporated, DMA will be installed at Position 1
0A 18 Nov 22 Page 1
CPY Comment:
Position 1 using only 7 anchors please check stinger and vessel
excursion.
what is limiting weather during initiation and normal pipelaying? please
present it in the table
MEI Reponses:
Excursion checked on the mooring analysis, and limiting weather is
presented in graphic to simplify the display.
0A 18 Nov 22 Page 1
CPY Comment:
Please present distance between pipeline route and ANM-4. what is the
mitigation to avoid pipeline clashing witn ANM-4
MEI Reponses:
Result from prelay survey, ANM-4 doesn’t indicate any concern.
0A 11 Nov 22 Page 1
CPY Comment:
Please present minimum and maximum tension to have safe mooring line
without anchor dragging and safe for existing assets or comply with
minimum requirement of vertical clearance (allowable tension) for
reference winch operator on board during monitoring mooring line tension
MEI Reponses:
Incorporated
PC 6 91.0m
AA
G TE
LE
CO
MM
PIP
UN
ICA
TIO
EL
N
CA
BL
E
INE
PC 7
.0m
AP
G TE
LE
CO
MM
UN
ICA
91
TIO
N
CA
BL
E
Pro
po
se
dP
ipel
ine
PC 6
PC 7
UN
KN
OW
N SU
BS
EA
CA
BL
E
PC 1
m
91.0
1 . 0 m
9 KP
11.5
895
m
91.5
1 . 0 m
9
m
91.0
91
89.5m
W
BO
.0m
W
BO
m
91.0
.0m
W
BO
91
W
BO
BOW
m
91.5
.0m
. 5 m
91
9 1
PC 1
MEDCOENERGI
Oil Gas