You are on page 1of 3

LABOUR CONSTRUCTION AGREEMENT

This agreement is effective from 14th Day of MARCH 2022 by and between made in
Bangalore

1. Mr. N. VENKATESH KUMAR


S/o Late N. Venkatarayappa Gowda,
No. 131/6/3rd ‘C’ Cross, Papaya Layout,
Kasturinagar, Banaswadi, Bangalore – 560043.
--2--

2. Smt. M. SRIMATHI
W/o N. Venkatesh Kumar
No. 131/6/3rd ‘C’ Cross, Papaya Layout,
Kasturinagar, Banaswadi, Bangalore – 560043.
No:8951142003.

(Hereinafter the Owner called first party) on one part and

AND

Mr. GOVINDASAMY J
S/o C. Jayavelu
No. 26, 06th B Cross, NRI Layout ,
Second Phase,Horamavu, Bangalore – 560043.
No: 9902235153.

(hereinafter the Contractor called second party) on the other part.

AND WITNESSESTH AS FOLLOWS: -

Work details:

 Sump Work Rs = 50,000/-


 Compound Work Rs = 50,000/-

1. Advance Rs = 1,00,000
2. Putting Concreate work Rs. = 50,000/-
3. Plinth Concreate work Rs = 1,00,000/-
4. Ground Floor 07 feet lintel height and 10feet roof height work Rs = 50,000/-
5. Ground Floor RCC Concreate work Rs =1,50,000/-
6. First Floor 07 feet Lintel height and 10 feet roof height work Rs = 1,00,000/-
7. First Floor RCC Concreate work Rs = 1,50,000/-
8. Second Floor 07 Feet lintel height and 10 feet roof height work Rs = 1,00,000/-
9. Second Floor RCC Concreate work Rs =1,50,000/-
10. Floor outside Plastering work ( 04 side) for each side of work Rs = 50,000/-
( 04 side * 50000) Rs = 2,00,000/-
11. Ground Floor inside plastering work Rs = 50,000/-
12. Frist Floor inside Plastering work Rs = 50,000/-
--3--

13. Second Floor inside plastering work Rs = 70,000/-

TOTAL ESTIMATION AMOUNT RS = 13,20,000/-

Note :

After Final Finishing if any extra work payment pending should do settlement as
per the above quotation.

SCHEDULE

All the piece and parcel of the property No. 53 Soujanya Shree Golden Enclave, Horamavu,
Bangalore - 560042 Total measuring 1,680 Sft, any extra measurement added extra payment
shall be paid.

WITNESSES : -

1. 1. FIRST PARTY

2.SECOND PARTY

2. SECOND PARTY

You might also like