You are on page 1of 24

Validate Print Help Percentage BoQ

Tender Inviting Authority: Superintending Engineer Highways NABARD and Rural Roads Tirunelveli Circle

Upgradation of Four Panchayat Union Roads / Panchayat Roads as Other District Roads in Virudunagar (H) NABARD and Rural Roads Sub Division (Package 1)

Contract No:

Name of
the Bidder/
Bidding
Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
Bidders are allowed to enter the Bidder Name and Values only )
NUMBER # TEXT # NUMBER TEXT # NUMBER TEXT # NUMBER # TEXT #
Sl. Item Description #
Quantity Units Estimated Rate in Quoted TOTAL AMOUNT TOTAL AMOUNT In Words
No. Rs. P Currency in excluding Taxes in
INR / Other Rs. P
Currency
1 2 4 5 6 12 53 55
1 Clearing the Light Jungle without
uprooting including all labour and
machineries charges for cleaning the site
including all other incidental charges etc.,
complete (Sl. No. 9D)

1.1 Upgradation of Mellakallankulam- 2373.330 Square 4.400 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780 Metre
1.2 Upgradation of Seeganenthal- 3240.000 Square 4.400 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430 Metre
1.3 Upgradation of Trichy-Tuticorin Road To 5760.000 Square 4.400 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4

1.4 Upgradation of Thiruppuvanam - Narikudi 3280.000 Square 4.400 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460 Metre
2 Picking the existing BT surface as
directed by the departmental officers and
collecting the picked up salvaged metal
and stacking the same for reuse and
deposting the debris excluding cost of
materials including all labour charges for
picking and all other tools and plants
employed of the work and including all
other incidental charges etc., complete as
per standard specifications as per MORTH
Rev. V

2.1 Upgradation of Mellakallankulam- 2230.430 Square 15.310 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780 Metre
2.2 Upgradation of Seeganenthal- 3042.930 Square 15.310 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430 Metre
2.3 Upgradation of Trichy-Tuticorin Road To 2949.560 Square 15.310 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4

2.4 Upgradation of Thiruppuvanam - Narikudi 3080.430 Square 15.310 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460 Metre
3 Granular Sub-base with Graded Material
(Table:-400-1)-Plant Mix Method
(Construction of granular sub-base by
providing close graded Material, mixing in
a mechanical mix plant at OMC, carriage
of mixed Material to worksite, spreading in
uniform layers with motor grader on
prepared surface and compacting with
vibratory power roller to achieve the
desired density, complete as per clause
401)-for Grading V Material (Specification
Number as per MORTH Rev.V
111,112,401,900).

3.1 Upgradation of Mellakallankulam- 2.700 Cubic Metre 1631.900 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780
3.2 Upgradation of Seeganenthal- 3.600 Cubic Metre 1618.700 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
3.3 Upgradation of Trichy-Tuticorin Road To 37.600 Cubic Metre 1579.100 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

3.4 Upgradation of Thiruppuvanam - Narikudi 5.400 Cubic Metre 1631.900 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
4 Wet Mix Macadam (Table400-13)
(Providing, laying, spreading and
compacting graded stone aggregate to
wet mix macadam specification including
premixing the Material with water at OMC
in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform
layers with paver in sub-base/base course
on well prepared surface and compacting
with vibratory roller to achieve the desired
density, Complete as per clause 406)
(Specification Number as per MORTH
Rev.V 111,112,406,900).

4.1 Upgradation of Mellakallankulam- 1672.830 Cubic Metre 1811.600 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780
4.2 Upgradation of Seeganenthal- 2282.210 Cubic Metre 1811.600 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
4.3 Upgradation of Trichy-Tuticorin Road To 1364.910 Cubic Metre 1811.600 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

4.4 Upgradation of Thiruppuvanam - Narikudi 2310.330 Cubic Metre 1811.600 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
5 Prime coat (Providing and applying primer
coat with bitumen emulsion (SS-I type) on
prepared surface of granular Base
including clearing of road surface and
spraying primer at the rate of 0.70 kg/sqm
using mechanical means as per clause
502) - over WMM/ WBM.(Specification
Number as per MORTH Rev.V
111,112,502,900).

5.1 Upgradation of Mellakallankulam- 6691.300 Square 51.100 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780 Metre
5.2 Upgradation of Seeganenthal- 9128.800 Square 51.090 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430 Metre
5.3 Upgradation of Trichy-Tuticorin Road To 8999.070 Square 51.090 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4

5.4 Upgradation of Thiruppuvanam - Narikudi 9241.300 Square 51.110 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460 Metre
6 Tack coat - Providing and applying tack
coat with bitumen emulsion (RS-I type)
using emulsion pressure distributor at the
rate of 0.25 kg per sqm on the prepared
bituminous/granular surface cleaned with
mechanical broom as per clause 503 -
over granular surfaces treated with
primer.(Specification Number as per
MORTH Rev.V 111,112,503,900).

6.1 Upgradation of Mellakallankulam- 6691.300 Square 10.890 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780 Metre
6.2 Upgradation of Seeganenthal- 9128.800 Square 10.890 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430 Metre
6.3 Upgradation of Trichy-Tuticorin Road To 8999.070 Square 10.890 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4

6.4 Upgradation of Thiruppuvanam - Narikudi 9241.300 Square 10.890 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460 Metre
7 Bituminous Macadam - Providing and
laying bituminous macadam 50mm
compacted thick with Central Hot mix
plant using crushed aggregates of
specified grading premixed with
bituminous binder (Viscosity Grade 30),
transported to site, laid over a previously
prepared surface with paver finisher to the
required grade, level and alignment and
rolled as per clauses 501.6 and 501.7 to
achieve the desired compaction, complete
as per clause 504 of MORTH Specification
- Grading II

7.1 Upgradation of Mellakallankulam- 334.570 Cubic Metre 5678.460 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780
7.2 Upgradation of Seeganenthal- 456.450 Cubic Metre 5678.460 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
7.3 Upgradation of Trichy-Tuticorin Road To 449.960 Cubic Metre 5678.460 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

7.4 Upgradation of Thiruppuvanam - Narikudi 462.070 Cubic Metre 5678.460 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
8 Bituminous Concrete 30mm thick (Table
500-17) (Providing and laying bituminous
concrete with hot mix plant using crushed
aggregates of specified grading,premixed
with bituminous binder (Viscosity Grade -
30) at percentage specified by JMF of mix
and filer, transporting the hot mix to work
site, laying wih a hydrostatic paver
finisher to the required grade, level and
alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve
the desired compaction as per MORTH
specification clause No.507 complete in all
respects) - Grading II.(Specification
Number as per MORTH Rev.V
111,112,507,900).

8.1 Upgradation of Mellakallankulam- 200.740 Cubic Metre 7037.430 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780
8.2 Upgradation of Seeganenthal- 273.870 Cubic Metre 7037.430 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
8.3 Upgradation of Trichy-Tuticorin Road To 269.970 Cubic Metre 7037.430 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

8.4 Upgradation of Thiruppuvanam - Narikudi 277.240 Cubic Metre 7037.430 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
9 Earthwork for subgrade, shoulders and
back fills in accordance with the
specifications, lines, grades and cross
sections as shown in the drawings or as
indicated by the Engineer as per SS20B
for 97% Compaction for making up Berms
using Carted Earth with an average lead of
1Km MORTH Rev. V

9.1 Upgradation of Mellakallankulam- 2202.750 Cubic Metre 155.740 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780
9.2 Upgradation of Seeganenthal- 3007.130 Cubic Metre 155.740 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
9.3 Upgradation of Trichy-Tuticorin Road To 2031.450 Cubic Metre 155.740 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
9.4 Upgradation of Thiruppuvanam - Narikudi 3044.250 Cubic Metre 155.740 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
10 Providing RCC M 15 grade precast KM
stone of standard design as per IRC 8 - 1980
and fixing in position including painting and
printing etc., complete

10.1 Upgradation of Mellakallankulam- 1.000 Nos 906.000 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780
10.2 Upgradation of Seeganenthal- 2.000 Nos 906.000 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
10.3 Upgradation of Trichy-Tuticorin Road To 2.000 Nos 906.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

10.4 Upgradation of Thiruppuvanam - Narikudi 2.000 Nos 906.000 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
11 Providing RCC M 15 grade precast HM
stone of standard design as per IRC 8 - 1980
and fixing in position including painting,
printing etc., complete

11.1 Upgradation of Mellakallankulam- 8.000 Nos 256.000 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780
11.2 Upgradation of Seeganenthal- 10.000 Nos 256.000 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430
11.3 Upgradation of Trichy-Tuticorin Road To 10.000 Nos 256.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

11.4 Upgradation of Thiruppuvanam - Narikudi 10.000 Nos 256.000 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460
12 Sub estimate for Pipe Culvert

13 Earthwork excavationin all classes of


soils depositing on bank, with all leads
and lifts as per SS 20B, including cost of
all labour, equipments and all other
incidental charges such as shoring,
bracing, and their subsequent removal,
removal of all logs, stumps and other
deleterious matter and obstructions,
trimming bottom of excavation backfilling,
and clearing the site and disposal of all
surplus materials etc., complete as per
relevant standard specifation for
Foundation for Pipe culvert
13.1 Upgradation of Mellakallankulam- 82.370 Cubic Metre 168.000 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780

13.2 Upgradation of Seeganenthal- 109.820 Cubic Metre 168.000 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430

13.4 Upgradation of Thiruppuvanam - Narikudi 164.730 Cubic Metre 168.000 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460

14 Plain Cement concrete 1:2:4 (Nominal Mix)


using 40mm ISS HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement
at site and including soft water, labour
charges for mixing, transporting, laying,
curing and compacting concrete, hire
charges for tools and plants and all other
incidental charges etc., complete as per
standard specification for FOUNDATION
for Pipe culvert.

14.1 Upgradation of Mellakallankulam- 9.500 Cubic Metre 5173.420 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780

14.2 Upgradation of Seeganenthal- 12.670 Cubic Metre 5113.350 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430

14.4 Upgradation of Thiruppuvanam - Narikudi 19.010 Cubic Metre 5307.770 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460

15 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for BODY WALL for Pipe
culvert (below sill)
15.1 Upgradation of Mellakallankulam- 53.840 Cubic Metre 6559.370 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780

15.2 Upgradation of Seeganenthal- 71.790 Cubic Metre 6499.300 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430

15.4 Upgradation of Thiruppuvanam - Narikudi 107.680 Cubic Metre 6693.720 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460

16 Vibrated Cement Concrete of 1:2:4


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charge for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for BODY WALL for Pipe
culvert (above sill)

16.1 Upgradation of Mellakallankulam- 47.870 Cubic Metre 7504.770 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780

16.2 Upgradation of Seeganenthal- 63.820 Cubic Metre 7444.700 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430

16.4 Upgradation of Thiruppuvanam - Narikudi 95.730 Cubic Metre 7639.120 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460

17 Supply of NP3 class RCC (1000mm dia)


Pipes supplied by the Contractor at his
own cost and risk specified below
confirming to IS 458 / 2003 including all
other incidental charges, testing charges
including loading and unloading transport
and delivery in good condition at work site
as directed by the departmental officers
etc., complete, as per MORTH
Specification.

17.1 Upgradation of Mellakallankulam- 22.500 Running 3700.000 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780 Meter
17.2 Upgradation of Seeganenthal- 30.000 Running 3700.000 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430 Meter

17.4 Upgradation of Thiruppuvanam - Narikudi 45.000 Running 3700.000 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460 Meter

18 Hoisting of NP3 class RCC (1000mm dia)


Pipes supplied by the Contractor at his
own cost and risk specified below
confirming to IS 458 / 2003 cost of pipe as
a finished work including all other
incidental charges, as directed by the
departmental officers etc., complete, as
per MORTH Specification.

18.1 Upgradation of Mellakallankulam- 22.500 Running 238.000 INR #VALUE! #VALUE!


Nazerpuliyankulam Km 0/0-1/780 Meter

18.2 Upgradation of Seeganenthal- 30.000 Running 238.000 INR #VALUE! #VALUE!


Kanjamanayaganpatti Road Km 0/0-2/430 Meter

18.4 Upgradation of Thiruppuvanam - Narikudi 45.000 Running 238.000 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460 Meter

19 Gravel Filling in between body wall with


clean good gritty gravel including cost
and conveyance to the site including
labour charges for filling in layers,
watering, tamping under optimum
moisture content to get the maximum
density and all other incidental charges
etc. complete. for Pipe culvert

19.1 Upgradation of Mellakallankulam- 33.560 Cubic Metre 332.900 INR #VALUE! #VALUE!
Nazerpuliyankulam Km 0/0-1/780

19.2 Upgradation of Seeganenthal- 44.740 Cubic Metre 301.700 INR #VALUE! #VALUE!
Kanjamanayaganpatti Road Km 0/0-2/430

19.4 Upgradation of Thiruppuvanam - Narikudi 67.110 Cubic Metre 256.630 INR #VALUE! #VALUE!
Road To Kalvimadai Km 0/0 -2/460

20 Sub Estimate for Minor Bridge


21 Earthwork excavation in all classes of soil
and depositing on bank with all leads and lifts
as per SS20B, including cost of all labour,
equipments and all incidental charges and
clearing the site and disposal of all surplus
materials etc., complete as per relevant
standard specification for DRESSING THE
BED UPTO SILL LEVEL

21.3 Upgradation of Trichy-Tuticorin Road To 191.330 Cubic Metre 84.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
22
Earthwork excavation in all classes of soil
depositing on bank with all leads and lifts as
per SS20B and all over incidental charges
such as baling out water, providing and
maintaining necessary cofferdams, sheeting,
shoring bracing and their subsequent
removal, removal of all logs, stumps, grubs
and other deleterious matter and
obstructions,trimming bottom of excavation,
backfilling and clearing the site and disposal
of all surplus materials etc. complete as per
relevant standards specification for
FOUNDATION OF ABUTMENTS, WINGS
AND PIERS

22.3 Upgradation of Trichy-Tuticorin Road To 605.210 Cubic Metre 326.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
23 Vibrated Cement Concrete of grade M10
(Nominal Mix ) using 40 mm ISS size HBG
graded Metal including cost and
conveyance of all materials to site and
including cost of cement at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, working on height,
hire charge for all tools and plants and all
other incidental charges etc., complete as
per relevant standard specifications for
LEVELLING COURSE FOR ABUTMENT
AND RETURN

23.3 Upgradation of Trichy-Tuticorin Road To 27.510 Cubic Metre 4528.900 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
24

Vibrated Cement Concrete of M20


(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and conveyance
of all materials to site and cost of cement at
site including cost of formwork, softwater,
labour charges for mixing, transporting, laying
and curing concrete, working at depths, hire
charge for all tools and plants and all other
incidental charges etc., complete as per
relevant standard specifications for
FOOTINGS OF ABUTMENT, WINGS AND
PIERS BELOW SILL LEVEL

24.3 Upgradation of Trichy-Tuticorin Road To 315.520 Cubic Metre 6157.330 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
25 Vibrated Cement Concrete of grade M20
(Nominal Mix) using 40 mm ISS size HBG
graded Metal including cost and conveyance
of all materials to site and including cost of
cement at site including cost of formwork,
softwater, labour charges for mixing,
transporting, laying and curing concrete,
working on height, hire charge for all tools
and plants and all other incidental charges
etc., complete as per relevant standard
specifications for SUBSTRUCTURE OF
ABUTMENTS, WINGS and PIERS ABOVE
SILL LEVEL

25.3 Upgradation of Trichy-Tuticorin Road To 83.270 Cubic Metre 7517.170 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
26 Vibrated Reinforced Cement Concrete of
M30 (Design Mix) using 20mm HBG
graded Metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, working on heights,
hire charges for all tools and plants and
all other incidental charges etc., complete
as per relevant standard specifications for
BED BLOCK CUM DIRT WALL OVER
ABUTMENTS AND BED BLOCK OVER
PIERS.

26.3 Upgradation of Trichy-Tuticorin Road To 12.150 Cubic Metre 10190.580 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
27 Providing and Fixing 110mm dia Class I
PVC Seepage Pipes of required length for
abutment and wings, including cost and
conveyance of all materials to work site,
cost and labour for 900mm dia semi-
spherical backfill arrangements with
110mm size broken granite chips at the
periphery and labour charges for fixing
etc., to drain of the backfill IN THE
ABUTMENTS AND WINGS

27.3 Upgradation of Trichy-Tuticorin Road To 30.000 Nos 172.800 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
28 Providing and Fixing KRAFT PAPER in full
width of seating of Deck Slab and
including cost and conveyance to work
site, labour charges for fixing the same in
the correct position and all other
incidental charges etc. complete

28.3 Upgradation of Trichy-Tuticorin Road To 34.830 Square 100.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
29 Vibrated Reinforced Cement Concrete of
M30 (Design Mix) using 20mm HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site but excluding cost
and fabrications of steel at site including
cost of formwork, softwater, labour
charges for mixing, transporting, laying
and curing concrete, working on
heights,hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for DECK SLAB.

29.3 Upgradation of Trichy-Tuticorin Road To 267.560 Cubic Metre 10132.030 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4

30 Providing FILTER MEDIA behind the


Abutments and Wings with clean graded
III material to 600mm thick and well
compacted in layers with smaller sized
towards the soil and bigger size towards
the wall including cost and conveyance to
work site including all labours and other
incidental charges including hire charges
for tools and plants employed etc. for filter
media as per MORTH Revision vth Cl.309-
3-2-2 and 305-4-4 etc., complete.∙

30.3 Upgradation of Trichy-Tuticorin Road To 34.580 Cubic Metre 1050.600 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
31 Filling behind Abutment and Returns as
per Appendix 6 of IRC: 78-2014 with clean
gritty gravel including cost and
conveyance of gravel to worksite, laying,
handling charges and filling in layers,
tamping under OMC to get the maximum
density, including watering with all leads
and lifts for water and all other incidental
charges etc., complete.
31.3 Upgradation of Trichy-Tuticorin Road To 74.310 Cubic Metre 249.700 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
32 Providing and Fixing PVC Expansion Joint
in between Deck Slabs over Abutment and
Pier as shown in the drawing including
cost and conveyance of expanions joints,
including shalimar pad and joint sealent
etc. complete.

32.3 Upgradation of Trichy-Tuticorin Road To 49.750 running 566.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
33 Supply and Fabrication of steel at site
Grade Fe-500 at site required for all RCC
items of works involved in the schedule
including cost of steel at site, cost of
fabrication, labour charges for cleaning
the bars, straightening, cutting, bending,
tying grills, hoisting and placing the
reinforcement in position as specified in
the drawings including cost of binding
wire, provision of space bars, cover
blocks and all other incidental charges
etc., complete,

33.3 Upgradation of Trichy-Tuticorin Road To 22.710 Metric tone 73382.790 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
34 Supply and Fabrication of steel at site
Grade Fe-240 at site required for all RCC
items of works involved in the schedule
including cost of steel at site, cost of
fabrication, labour charges for cleaning
the bars, straightening, cutting, bending,
tying grills, hoisting and placing the
reinforcement in position as specified in
the drawings including cost of binding
wire, provision of space bars, cover
blocks and all other incidental charges
etc., complete,
34.3 Upgradation of Trichy-Tuticorin Road To 2.200 Metric tone 73382.790 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
35 Vibrated Cement Concrete of M15
(Nominal Mix ) using 40mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Base course below
approach slab

35.3 Upgradation of Trichy-Tuticorin Road To 13.000 Cubic Metre 5707.020 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
36 Vibrated Reinforced Cement Concrete of
M30 (Design Mix ) using 20mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Approach slab

36.3 Upgradation of Trichy-Tuticorin Road To 18.270 Cubic Metre 7739.450 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
37 Vibrated Reinforced Cement Concrete of
M30 (Design Mix ) using 20mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for Wearing coat over deck
slab and Approach slab

37.3 Upgradation of Trichy-Tuticorin Road To 334.500 Square 609.640 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
38 Vibrated Reinforced Cement Concrete of
M40 (Design Mix ) using 20mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for outer crash barrier

38.3 Upgradation of Trichy-Tuticorin Road To 21.360 Cubic Metre 12957.890 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
39 Vibrated Cement Concrete of M15
(Nominal Mix ) using 40mm ISS HBG
graded metal including cost and
conveyance of all materials to site and
cost of cement at site including cost of
formwork, softwater, labour charges for
mixing, transporting, laying and curing
concrete, hire charges for all tools and
plants and all other incidental charges
etc., complete as per relevant standard
specifications for PARAPET OVER
RETURNS
39.3 Upgradation of Trichy-Tuticorin Road To 6.070 Cubic Metre 9090.270 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
40 Providing and Fixing of G.I. Drainage
Spouts of 100mm dia as per GOI drawing
No. SD/205 with grating arrangements at
top as shown in the drawing and 100mm
dia drainage spouts projecting atleast
300mm beyond the bottom of deck slab as
shown in the drawing including cost and
conveyance of GI pipe and flats and fixing
them in position etc. complete as per
standard specification.

40.3 Upgradation of Trichy-Tuticorin Road To 8.000 Nos 2163.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
41 Supply and Fixing of High Quality PVC
pipes of 150mm dia of required length
including cost and conveyance of pipes to
site and fixing in position to proper
gradient and level including all labour
charges for fixing and including all other
incidental charges etc. complete for
providing utilities service in Safety kerb

41.3 Upgradation of Trichy-Tuticorin Road To 178.800 Running 357.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
42 Sub estimate for Diversion road
43 Earthwork for subgrade, shoulders and
back fills in accordance with the
specifications, lines, grades and cross
sections as shown in the drawings or as
indicated by the Engineer as per SS20B for
95% Compaction for making up Diversion
road using Carted Earth with an average lead
of 5Km MORTH Rev. V

43.3 Upgradation of Trichy-Tuticorin Road To 2000.100 Cubic Metre 154.940 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
44 Earthwork for subgrade, shoulders and
back fills in accordance with the
specifications, lines, grades and cross
sections as shown in the drawings or as
indicated by the Engineer as per SS20B for
97% Compaction for making up Diversion
road using Carted Earth with an average
lead of 5Km MORTH Rev. V

44.3 Upgradation of Trichy-Tuticorin Road To 2090.590 Cubic Metre 155.740 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
45 Granular Sub-base with Graded Material
(Table:-400-1)-Plant Mix Method
(Construction of granular sub-base by
providing close graded Material, mixing in a
mechanical mix plant at OMC, carriage of
mixed Material to worksite, spreading in
uniform layers with motor grader on prepared
surface and compacting with vibratory power
roller to achieve the desired density,
complete as per clause 401)-for Grading V
Material (Specification Number as per
MORTH Rev.V 111,112,401,900).
45.3 Upgradation of Trichy-Tuticorin Road To 101.250 Cubic Metre 1579.100 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
46 Wet Mix Macadam (Table400-13)
(Providing, laying, spreading and
compacting graded stone aggregate to wet
mix macadam specification including
premixing the Material with water at OMC in
mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform
layers with paver in sub-base/base course on
well prepared surface and compacting with
vibratory roller to achieve the desired density,
Complete as per clause 406) (Specification
Number as per MORTH Rev.V
46.3 Upgradation of Trichy-Tuticorin Road To 135.000 Cubic Metre 1811.600 INR #VALUE! #VALUE!
111,112,406,900).
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
47 Prime coat (Providing and applying primer
coat with bitumen emulsion (SS-I type) on
prepared surface of granular Base including
clearing of road surface and spraying primer
at the rate of 0.70 kg/sqm using mechanical
means as per clause 502) - over WMM/
WBM.(Specification Number as per MORTH
Rev.V 111,112,502,900).

47.3 Upgradation of Trichy-Tuticorin Road To 675.000 Square 51.090 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
48 Tack coat - Providing and applying tack coat
with bitumen emulsion (RS-I type) using
emulsion pressure distributor at the rate of
0.25 kg per sqm on the prepared
bituminous/granular surface cleaned with
mechanical broom as per clause 503 - over
granular surfaces treated with primer.
(Specification Number as per MORTH Rev.V
111,112,503,900).

48.3 Upgradation of Trichy-Tuticorin Road To 675.000 Square 10.890 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
49 Providing and Laying compacting open
graded Premix Carpet 20mm thick with a
liquid seal coat which shall consist of open
graded carpet of 20mm thickness in a single
course composed of suitable small sized
aggregates premixed with bituminous binder
(VG 30) with application of liquid seal coat for
sealing the voids in a bituminous surface
conforming to the specification including cost
of material, labour charges, rental for
machinery, fuel and all other incidental
charges etc., complete as per clause 510 of
49.3 Upgradation of Trichy-Tuticorin Road To 675.000 Square 189.850 INR #VALUE! #VALUE!
MORTH specification Rev. V
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
50 Supply and Fixing of RCC NP3 class pipes
of 1000mm dia standard length supplied by
the Contractor at his own cost specified
below confirming to IS 458 / 2003 cost of pipe
as a finished work including all other
incidental charges, testing charges, including
loading and unloading, transport and delivery
in good condition at work site as directed by
the departmental officers etc., complete as
per MORTH specication Rev. V for forming
for Diversion Road
50.3 Upgradation of Trichy-Tuticorin Road To 30.000 Running 3938.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi Metre
Joining Road 0/0 - 2/4
51 Sub estimate for Construction of
Retaining wall

52 Earthwork excavationin all classes of soils


depositing on bank, with all leads and lifts as
per SS 20B, including cost of all labour,
equipments and all other incidental charges
such as shoring, bracing, and their
subsequent removal, removal of all logs,
stumps and other deleterious matter and
obstructions, trimming bottom of excavation
backfilling, and clearing the site and disposal
of all surplus materials etc., complete as per
relevant standard specifation for Foundation
for Retaining wall

52.3 Upgradation of Trichy-Tuticorin Road To 470.400 Cubic Metre 168.000 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
53 Vibrated Cement Concrete M15 (Nominal
Mix) using 40mm ISS size HBG graded
metal including cost and conveyance of
all materials to site, including cost of
cement at site, including cost of form
work, soft water labour charges for
mixing, transporting, laying and curing,
concrete hire charges for all tools and
plants and complete as per standard
specification for FOOTING OF PCC
Retaining WALL

53.3 Upgradation of Trichy-Tuticorin Road To 117.600 Cubic Metre 5177.760 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
54 Vibrated Cement Concrete M15 (Nominal
Mix) using 40mm ISS size HBG graded
metal including cost and conveyance of
all materials to site, including cost of
cement at site, including cost of form
work, soft water labour charges for
mixing, transporting, laying and curing,
concrete hire charges for all tools and
plants and complete as per standard
specification for PCC Retaining WALL
(Below sill)

54.3 Upgradation of Trichy-Tuticorin Road To 244.800 Cubic Metre 6069.100 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
55 Vibrated Cement Concrete M15 (Nominal
Mix) using 40mm ISS size HBG graded
metal including cost and conveyance of
all materials to site, including cost of
cement at site, including cost of form
work, soft water labour charges for
mixing, transporting, laying and curing,
concrete hire charges for all tools and
plants and complete as per standard
specification for PCC WALL (Above sill)

55.3 Upgradation of Trichy-Tuticorin Road To 316.800 Cubic Metre 7274.380 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
56 Providing and fixing SEEPAGE PIPES of
110mm dia PVC pipes of required length
for Breast Wall including cost and
conveyance of all materials to worksite,
cost and labour for 900mm dia. Semi-
spherical back fill arrangements with
110mm size broken granite chips at the
periphery and labour charges for fixing
etc., to drain of the Backfill in the
Retaining WALL

56.3 Upgradation of Trichy-Tuticorin Road To 152.000 Nos 172.800 INR #VALUE! #VALUE!
Panikanenthal Via Kariapatti - Narikudi
Joining Road 0/0 - 2/4
Calculation of SubTotal, GST and Total
57
carried out by system automatically
Sub Total Amount for above all items
58 1.000 subtotal #VALUE! INR 0.000 #VALUE!
(excluding GST)

59 GST 12% for above SubTotal Amount 1.000 gst #VALUE! INR #VALUE! #VALUE!

Total in Fig Total in Figures (SubTotal + GST) #VALUE! #VALUE!

Quoted Rate in Figures 0.000 #VALUE!


Select

Quoted Rate in Words #VALUE!


Please Enable Macros to View BoQ information
Q information

You might also like