Validate Print Help Percentage BoQ

Tender Inviting Authority: Superintending Engineer Highways NABARD and Rural Roads Tirunelveli Circle

Name of work: Upgradation of Three Panchayat Union / Panchayat Roads as Other District Roads in Paramakudi (H) NABARD and Rural
Roads Sub Division (Package 29)

Contract No:

Name of
the
Bidder/
Bidding
Firm /
Compan
y: PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be
rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBE NUMBER
TEXT # TEXT # NUMBER TEXT # NUMBER # TEXT #
R# #
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
1 2 4 5 6 12 53 55
Clearing the Light Jungle without uprooting
including all labour and machineries charges
1
for cleaning the site including all other
incidental charges etc., complete

Upgradation of Kallikudi to Vettukulam road (via) Square


1.1 10560.000 4.400 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Square


1.2 3120.000 4.400 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Square


1.3 6744.000 4.400 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency

Picking the existing BT surface as directed by


the departmental officers and collecting the
picked up salvaged metal and stacking the
same for reuse and deposting the debris
excluding cost of materials including all
2
labour charges for picking and all other tools
and plants employed of the work and
including all other incidental charges etc.,
complete as per standard specifications as
per MORTH Rev. V

Upgradation of Kallikudi to Vettukulam road (via) Square


2.1 5506.430 15.310 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Square


2.2 1633.770 15.310 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Square


2.3 3496.420 15.310 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Granular Sub-base with Graded Material


(Table:-400-1)-Plant Mix Method
(Construction of granular sub-base by
providing close graded Material, mixing in a
mechanical mix plant at OMC, carriage of
mixed Material to worksite, spreading in
3
uniform layers with motor grader on prepared
surface and compacting with vibratory power
roller to achieve the desired density,
complete as per clause 401)-for Grading V
Material (Specification Number as per MORTH
Rev.V 111,112,401,900).

Upgradation of Kallikudi to Vettukulam road (via) Cubic


3.1 1.800 2046.580 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Cubic


3.2 735.200 2288.490 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


3.5 14.400 2081.780 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency

Wet Mix Macadam (Table400-13) (Providing,


laying, spreading and compacting graded
stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
4
laying in uniform layers with paver in sub-
base/base course on well prepared surface
and compacting with vibratory roller to
achieve the desired density, Complete as per
clause 406) (Specification Number as per
MORTH Rev.V 111,112,406,900).

Upgradation of Kallikudi to Vettukulam road (via) Cubic


4.1 4029.700 2348.600 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Cubic


4.2 1225.330 2553.410 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


4.3 2638.450 2348.600 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Prime coat (Providing and applying primer


coat with bitumen emulsion (SS-I type) on
prepared surface of granular Base including
clearing of road surface and spraying primer
5
at the rate of 0.70 kg/sqm using mechanical
means as per clause 502) - over WMM/ WBM.
(Specification Number as per MORTH Rev.V
111,112,502,900).

Upgradation of Kallikudi to Vettukulam road (via) Square


5.1 16118.800 58.930 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Square


5.2 4901.301 58.960 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Square


5.3 10553.750 58.900 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Tack coat - Providing and applying tack coat
with bitumen emulsion (RS-I type) using
emulsion pressure distributor at the rate of
0.25 kg per sqm on the prepared
6 bituminous/granular surface cleaned with
mechanical broom as per clause 503 - over
granular surfaces treated with primer.
(Specification Number as per MORTH Rev.V
111,112,503,900).

Upgradation of Kallikudi to Vettukulam road (via) Square


6.1 16118.800 12.320 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Square


6.2 4901.301 12.330 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Square


6.3 10553.750 12.310 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Bituminous Macadam - Providing and laying


bituminous macadam 50mm compacted thick
with Central Hot mix plant using crushed
aggregates of specified grading premixed
with bituminous binder (Viscosity Grade 30),
7 transported to site, laid over a previously
prepared surface with paver finisher to the
required grade, level and alignment and rolled
as per clauses 501.6 and 501.7 to achieve the
desired compaction, complete as per clause
504 of MORTH Specification - Grading II

Upgradation of Kallikudi to Vettukulam road (via) Cubic


7.1 805.940 7080.380 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Cubic


7.2 245.070 7308.880 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


7.3 527.700 7080.380 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency

Bituminous Concrete 30mm thick (Table 500-


17) (Providing and laying bituminous
concrete with hot mix plant using crushed
aggregates of specified grading,premixed
with bituminous binder (Viscosity Grade - 30)
at percentage specified by JMF of mix and
filer, transporting the hot mix to work site,
8 laying wih a hydrostatic paver finisher to the
required grade, level and alignment, rolling
with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as
per MORTH specification clause No.507
complete in all respects) - Grading II.
(Specification Number as per MORTH Rev.V
111,112,507,900).

Upgradation of Kallikudi to Vettukulam road (via) Cubic


8.1 483.560 8853.400 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Cubic


8.2 147.040 9084.450 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


8.3 316.620 8853.400 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Excavation including removal and


satisfactory disposal of all materials
necessary for the construction of roadway
and side drains in accordance with the
specifications, lines, grades and cross
9
sections as shown in the drawings or as
indicated by the Engineer a. Formation of
embankment using Side Earth including
compaction by Power Roller as per MORTH
Rev. V Clause No. 111, 112, 301 to 305, 900.

Upgradation of Kallikudi to Vettukulam road (via) Cubic


9.1 3217.500 103.160 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Upgradation of Peruvayal to Therkuperuvayal Cubic
9.2 1560.004 103.160 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


9.3 2634.380 103.160 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Gravel Filling for road side berms with clean


good gritty gravel including cost and
conveyance to the site including labour
charges for filling in layers, watering, tamping
10
under optimum moisture content to get the
maximum density and all other incidental
charges etc. complete. as per MORTH Rev. V
Clause No. 1000,1500,1700 & 2100.

Upgradation of Kallikudi to Vettukulam road (via) Cubic


10.1 1029.600 568.210 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Peruvayal to Therkuperuvayal Cubic


10.2 208.001 759.860 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


10.3 674.400 448.580 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Providing RCC M 15 grade precast KM stone


of standard design as per IRC 8 - 1980 and fixing
11
in position including painting and printing etc.,
complete

Upgradation of Kallikudi to Vettukulam road (via)


11.1 4.000 Nos 906.000 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4

Upgradation of Peruvayal to Therkuperuvayal


11.2 1.000 Nos 906.000 INR #VALUE! #VALUE!
Km 0/0-1/3
Upgradation of Kadambur to Manikkamkottai
11.3 2.000 Nos 906.000 INR #VALUE! #VALUE!
road Km 0/0-2/810
Providing RCC M 15 grade precast HM stone
of standard design as per IRC 8 - 1980 and fixing
12
in position including painting, printing etc.,
complete
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Upgradation of Kallikudi to Vettukulam road (via)
12.1 18.000 Nos 256.000 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4

Upgradation of Peruvayal to Therkuperuvayal


12.2 5.000 Nos 256.000 INR #VALUE! #VALUE!
Km 0/0-1/3
Upgradation of Kadambur to Manikkamkottai
12.3 12.000 Nos 256.000 INR #VALUE! #VALUE!
road Km 0/0-2/810
13 Sub estimate for Pipe Culvert

Earthwork excavationin all classes of soils


depositing on bank, with all leads and lifts as
per SS 20B, including cost of all labour,
equipments and all other incidental charges
such as shoring, bracing, and their
subsequent removal, removal of all logs,
14
stumps and other deleterious matter and
obstructions, trimming bottom of excavation
backfilling, and clearing the site and disposal
of all surplus materials etc., complete as per
relevant standard specifation for Foundation
for Pipe culvert

Upgradation of Kallikudi to Vettukulam road (via) Cubic


14.1 54.910 168.000 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


14.3 320.890 168.000 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Plain Cement concrete M20 (Nominal Mix)


using 40mm ISS HBG graded metal including
cost and conveyance of all materials to site,
including cost of cement at site and including
soft water, labour charges for mixing,
15
transporting, laying, curing and compacting
concrete, hire charges for tools and plants
and all other incidental charges etc.,
complete as per standard specification for
FOUNDATION for Pipe culvert.

Upgradation of Kallikudi to Vettukulam road (via) Cubic


15.1 6.340 5958.800 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Upgradation of Kadambur to Manikkamkottai Cubic
15.3 74.620 5752.350 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Vibrated Cement Concrete of M20 (Nominal


Mix) using 40 mm ISS size HBG graded Metal
including cost and conveyance of all
materials to site and cost of cement at site
including cost of formwork, softwater, labour
16 charges for mixing, transporting, laying and
curing concrete, hire charge for all tools and
plants and all other incidental charges etc.,
complete as per relevant standard
specifications for BODY WALL for Pipe
culvert (below sill)

Upgradation of Kallikudi to Vettukulam road (via) Cubic


16.1 35.890 7344.750 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


16.3 352.540 6495.390 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre

Vibrated Cement Concrete of M20 (Nominal


Mix) using 40 mm ISS size HBG graded Metal
including cost and conveyance of all
materials to site and cost of cement at site
including cost of formwork, softwater, labour
17 charges for mixing, transporting, laying and
curing concrete, hire charge for all tools and
plants and all other incidental charges etc.,
complete as per relevant standard
specifications for BODY WALL for Pipe
culvert (above sill)

Upgradation of Kallikudi to Vettukulam road (via) Cubic


17.1 31.910 8290.150 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Upgradation of Kadambur to Manikkamkottai Cubic


17.3 311.200 7048.700 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Supply of NP3 class RCC (1000mm dia)
Pipes supplied by the Contractor at his own
cost and risk specified below confirming to IS
458 / 2003 including all other incidental
18 charges, testing charges including loading
and unloading transport and delivery in good
condition at work site as directed by the
departmental officers etc., complete, as per
MORTH Specification.

Upgradation of Kallikudi to Vettukulam road (via) Running


18.1 15.000 3700.000 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 metre

Upgradation of Kadambur to Manikkamkottai Running


18.3 157.500 3700.000 INR #VALUE! #VALUE!
road Km 0/0-2/810 metre

Hoisting of NP3 class RCC (1000mm dia)


Pipes supplied by the Contractor at his own
cost and risk specified below confirming to IS
19 458 / 2003 cost of pipe as a finished work
including all other incidental charges, as
directed by the departmental officers etc.,
complete, as per MORTH Specification.

Upgradation of Kallikudi to Vettukulam road (via) Running


19.1 15.000 238.000 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 metre

Upgradation of Kadambur to Manikkamkottai Running


19.3 157.500 238.000 INR #VALUE! #VALUE!
road Km 0/0-2/810 metre

Gravel Filling in between body wall with clean


good gritty gravel including cost and
conveyance to the site including labour
20 charges for filling in layers, watering, tamping
under optimum moisture content to get the
maximum density and all other incidental
charges etc. complete. for Pipe culvert

Upgradation of Kallikudi to Vettukulam road (via) Cubic


20.1 22.370 570.360 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Upgradation of Kadambur to Manikkamkottai Cubic
20.3 250.410 456.000 INR #VALUE! #VALUE!
road Km 0/0-2/810 Metre
21 Sub estimate for PCC Toe Wall

Earthwork excavationin all classes of soils


depositing on bank, with all leads and lifts as
per SS 20B, including cost of all labour,
equipments and all other incidental charges
such as shoring, bracing, and their
subsequent removal, removal of all logs,
22
stumps and other deleterious matter and
obstructions, trimming bottom of excavation
backfilling, and clearing the site and disposal
of all surplus materials etc., complete as per
relevant standard specifation for Foundation
for Toe wall

Upgradation of Peruvayal to Therkuperuvayal Cubic


22.2 130.200 168.000 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Vibrated Cement concrete M20 (Nominal Mix)


using 40mm ISS HBG graded metal including
cost and conveyance of all materials to site,
including cost of cement at site and including
soft water, labour charges for mixing,
23
transporting, laying, curing and compacting
concrete, hire charges for tools and plants
and all other incidental charges etc.,
complete as per standard specification for
FOUNDATION for Toe Wall

Upgradation of Peruvayal to Therkuperuvayal Cubic


23.2 55.800 6231.000 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency

Vibrated Cement Concrete of M20 (Nominal


Mix) using 40 mm ISS size HBG graded Metal
including cost and conveyance of all
materials to site and cost of cement at site
including cost of formwork, softwater, labour
24
charges for mixing, transporting, laying and
curing concrete, hire charge for all tools and
plants and all other incidental charges etc.,
complete as per relevant standard
specifications for Toe Wall (below sill)

Upgradation of Peruvayal to Therkuperuvayal Cubic


24.2 50.400 6921.960 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Vibrated Cement Concrete of M20 (Nominal


Mix) using 40 mm ISS size HBG graded Metal
including cost and conveyance of all
materials to site and cost of cement at site
including cost of formwork, softwater, labour
25
charges for mixing, transporting, laying and
curing concrete, hire charge for all tools and
plants and all other incidental charges etc.,
complete as per relevant standard
specifications forToe Wall (above sill)

Upgradation of Peruvayal to Therkuperuvayal Cubic


25.2 63.600 7008.800 INR #VALUE! #VALUE!
Km 0/0-1/3 Metre

Providing and fixing SEEPAGE PIPES of


110mm dia PVC pipes of required length for
Retaining Wall including cost and
conveyance of all materials to worksite, cost
26 and labour for 900mm dia. Semi-spherical
back fill arrangements with 110mm size
broken granite chips at the periphery and
labour charges for fixing etc., to drain of the
Backfill in the Toe Wall

Upgradation of Peruvayal to Therkuperuvayal


26.2 236.000 Nos 151.000 INR #VALUE! #VALUE!
Km 0/0-1/3
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
Sub estimate for Construction of Retaining
27
wall

Earthwork excavationin all classes of soils


depositing on bank, with all leads and lifts as
per SS 20B, including cost of all labour,
equipments and all other incidental charges
such as shoring, bracing, and their
subsequent removal, removal of all logs,
28
stumps and other deleterious matter and
obstructions, trimming bottom of excavation
backfilling, and clearing the site and disposal
of all surplus materials etc., complete as per
relevant standard specifation for Foundation
for Retaining wall

Upgradation of Kallikudi to Vettukulam road (via) Cubic


28.1 294.00 168.00 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Vibrated Cement Concrete M20 (Nominal Mix)


using 40mm ISS size HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement at
site, including cost of form work, soft water
29
labour charges for mixing, transporting,
laying and curing, concrete hire charges for
all tools and plants and complete as per
standard specification for FOOTING OF PCC
RETAINING WALL

Upgradation of Kallikudi to Vettukulam road (via) Cubic


29.1 88.20 6003.06 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency

Vibrated Cement Concrete M20 (Nominal Mix)


using 40mm ISS size HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement at
site, including cost of form work, soft water
30
labour charges for mixing, transporting,
laying and curing, concrete hire charges for
all tools and plants and complete as per
standard specification for PCC RETAINING
WALL (Below sill)

Upgradation of Kallikudi to Vettukulam road (via) Cubic


30.1 136.08 6954.62 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Vibrated Cement Concrete M20 (Nominal Mix)


using 40mm ISS size HBG graded metal
including cost and conveyance of all
materials to site, including cost of cement at
site, including cost of form work, soft water
31
labour charges for mixing, transporting,
laying and curing, concrete hire charges for
all tools and plants and complete as per
standard specification for PCC RETAINING
WALL (Above sill)

Upgradation of Kallikudi to Vettukulam road (via) Cubic


31.1 195.96 6870.76 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4 Metre

Providing and fixing SEEPAGE PIPES of


110mm dia PVC pipes of required length for
Retaining Wall including cost and
conveyance of all materials to worksite, cost
32 and labour for 900mm dia. Semi-spherical
back fill arrangements with 110mm size
broken granite chips at the periphery and
labour charges for fixing etc., to drain of the
Backfill in the Retaining Wall

Upgradation of Kallikudi to Vettukulam road (via)


32.1 118.00 Nos 151.00 INR #VALUE! #VALUE!
Peraiyur, Aliyathanmozhi Road Km 2/0-6/4
Quoted
Estimated Rate Currency TOTAL AMOUNT
Sl.
Item Description Quantity Units in in INR / excluding Taxes in TOTAL AMOUNT In Words
No.
Rs. P Other Rs. P
Currency
33 Calculation of SubTotal, GST and Total
carried out by system automatically

34 Sub Total Amount for above all items 1.000 #VALUE! INR 0.000 #VALUE!
(excluding GST)
subtotal

35 GST 12% for above SubTotal Amount 1.000 #VALUE! INR #VALUE! #VALUE!
gst

Total in Total in Figures (SubTotal + GST) #VALUE! #VALUE!

Quoted Rate in Figures 0.000 #VALUE!


Select

Quoted Rate in Words #VALUE!


Please Enable Macros to View BoQ information
Q information

You might also like