Installation of DX Unit - JSA - Risk Assessment
Installation of DX Unit - JSA - Risk Assessment
RSG-HS-FRM-0001
RED_SEA_GLOBAL
Details
Company Name
Program / Facility / Operations Turtle Bay Village TBV / Red sea Global Abdul Mohsen Al Tamimi Contracting Company
Date
Project Name / Facility Details RO3-CO2CO2 TURTLE BAY-PKG 05 1/20/2024
Category
JSA /Risk Assessment Title Installation of DX unit New Revised
Building
Specific Location Village Center, Professional & Non-Professional Neighbourhood Centers. NA
JCB Telehandler, Forklift,Mobile scaffold platform,, Platform Ladders, Hand held power
Plant Tools & Equipment Required Area
tools, manual Handling tools, PPE's.
--
Work Scope/Description Installation of DX Unit at Village Center, Professional & Non-Professional Neighbourhood Centers.
RED_SEA_GLOBAL
Pre-task planning must be held RSG-HS- Follow the instructions under RSG-HS-
ADM 0009. GEN 0006_Guideline_ Safe Use of Mobile
All drivers must be trained and a valid Driving Devices in Vehicles.
license holder. Daily vehicle checklist to be conducted &
Over speeding. All vehicles shall be fitted with audible reverse available in the vehicle.
Collision with vehicle, objects & alarms. Appropriate signage must be displayed.
Mobilization of Personnel, Vehicles,
pedestrians. All drivers shall use the seat belt while driving. 2 2 4 Mandatory & job-specific PPE 2 1 2
Equipment & materials
Un-secure load. Pedestrians shall be at a safe distance from Ensure competent Banks man for all vehicle
Use of mobile devices while driving.. moving vehicles. movement
High visibility vests shall be worn by all workers Secure loads and equipment properly with
operating close to vehicles. strap belts.
Clear traffic signs shall be provided at the work Vehicle shall be reverse parked in the
site designated parking place at the site.
Follow the manual handling techniques Eliminate the need of manual handling.
under_RSG-HS-COS-0006 _ Loading Unloading Divide the load into parts.
Ergonomics. and Manual Handling. Use mechanical aids to reduce the manual
Work related upper limb Think before lifting! Is it heavy (above 35 pounds handling.
2 2 4 2 1 2
disorder.Muscle stress. [15.9 kilograms]) Is it large or awkward. Ensure the provvision of frequent rest breaks
Musculoskeletal disorder MSD's. Where is the center of gravity? Can you manage during the job to reduce the work exposure.
it alone. Ensure the proper PPE's under the reference _
Use the strong muscles and bones of your legs RSG-HS-COS-0001.
RED_SEA_GLOBAL
Never stand or work under the suspended load.
Movement must be in site speed limit to avoide
any over-turning.
Suspended Load. Always move under the instruction of a flagman
Collision with other vehichle. / banksman to avoid any collision with other
1- FORKLIFT Over-turning. vehicles at work site. 2 2 4
Over-loaded. Know the load before loading, do not exceed the
Un-secured load. permissable load limit.
The load must be secured properly before
making any movement fron one place to
another.
RED_SEA_GLOBAL
RED_SEA_GLOBAL
Ensure ladders are on a level, stable surface
and that the upper section of the ladder is in
Ensure that the ladder is placed on a level, stable
front of the bottom section when facing the
surface.
worker.
Select the right type of the ladder for safe
There are three grades or types of ladders.
operation (platform ladder).
Un-even surface. Grade 1AA and, grade 1A are recommended
Do not pull or move ladders from side to side, as
Poor selection of ladder. to carry out the job safely.. Ensure you are
over time this movement can cause ladders to
Un-inspected ladder. 2 2 4 using the type of ladder that is appropriate for 2 1 2
become less stable and more wobbly.
both the work environment and the job at
Ladder must be inspected by competent person
hand.
only.
Ladder inspection should be carried out before
Choose a step ladder that is about 3 feet shorter
and after use. Any visible damage must be
than the highest point you will be working, as
reported, and damaged ladders must be
this ensures a more stable base.
disused until they can be repaired.
RED_SEA_GLOBAL
Portable power drills are regularly inspected
and maintained to help minimise the risk of
exposures to these hazards.
All portable power tool maintenance is
documented and tagged.
Pre-use check of drill prior to start the activity. Exposure to noisy ITD workshop environments
Wear mask to avoid inhalable dust. is monitored and evaluated regularly for all
Noise. The cables must be insolated properly. workers.
Dust, Fumes and Vapours. Guards & safety devices must be in place and Worker training is provided to minimise
Vibration. working condition. exposure to these hazards.
Lighting. Suitable fire extinguisher must be placed in area. 2 2 4 All ducted dust and fume extraction systems 2 1 2
Un-inspected tools / equipment. Emsure the implementation of color coding are connected and operational, fully
Explosion and Fire system. maintained and cleaned as required.
Ensure the use of ear plugs / ear muf to reduce Good lighting is provided to all workspaces
the exposure of noise. and this is maintained on a regular basis.
Fluorescent tubes are checked and replaced as
required.
Take frequesnt rest breaks during the job to
reduce the work exposure.
All approved personal protective equipment
(PPE) is used where required.
Ensure all workers follow the use of clothing Ensure appropriate PPE’S to be use when
when temperature working to outside temperature working to outside.
Administrative controls like acclimatization,
Exposure to extreme Cold temperature, and humidity monitoring, flagging 3 2 6 Ensure site with proper monitoring and using 2 1 2
system etc. should be in place kestrel equipment heat stress program.
RED_SEA_GLOBAL
Work is strictly prohibited during lightning and Ensure all workers working at site with proper
project personnel are not allowed to stay shelter in place.
outdoor. Stop work immediately if Lighting
If safe building structures are not accessible, /thunderstorm and notify the transport
employers should guide workers to hard-topped foreman for the standby of BUS as shelter at
metal vehicles with rolled up windows. Remain site.
Lighting /thunderstorm 3 2 6 2 1 2
in the vehicle for at least 30 minutes after In any case of emergency, a standby vehicle at
hearing the last sound of thunder. site radio or cell phone to contact directly.
After hearing thunder, do not use corded All emergency contact list must provide to all
phones, except in an emergency. Cell phones driver/s.
and cordless phones may be used safely.
Ensure work is strictly prohibited during heavy Ensure all workers working at site with proper
rains and project personnel are not allowed to shelter in place during the rain.
work/stay outdoor. Always be vigilant of the flooding in the area,
If water accumulated or the area is flooding due look for the high location if flooded or call for
to rain, wait to subside before resuming the an emergency.
work. Ensure on any presence of water in excavated
If water is present in the excavation, de-watering area don’t allow any worker/s to resume the
Heavy Rain 3 2 6 2 1 2
shall be performed by installing submersible works.
pumps or equivalent should land survey work is Provide appropriate protection for the
urgent. excavation to prevent erosion of excavated
If raining, sandbag shall be positioned on the works.
surrounding of the excavation to prevent
rainwater flowing in the excavated area.
Work is strictly prohibited during sandstorm and Ensure all workers working at site with proper
project personnel are not allowed to stay shelter in place during sandstorm.
outdoor. Provide appropriate wearing of face mask
Wear medical facemasks or use wet towel or during sandstorm at site otherwise stop the
gauze during sandstorms outdoors. work and wait for further notice to proceed.
Wear eyeglasses preferably airtight goggles or Provide appropriate use of safety glasses,
face shield to protect your eyes from blowing contact lenses are not allowed during working
dust or sand. at site.
Avoid wearing contact lenses in areas prone to Ensure all workers to stay indoor (car or office
sandstorm. building) unless it is necessary to go out.
Avoid rubbing eyes to prevent eye infection. If Conduct maintenance of office and
Sandstorm eyes become irritated, rinse with water. 3 2 6 accommodations to sealed properly and 2 1 2
Stay indoor (car or office building) unless it is prevent sands enter inside the room/office,
necessary to go out. Drive with caution or stop on the shoulder of
Ensure office and accommodations if sandstorm the road until the sandstorm remain calm.
proof (properly sealed). Be vigilant of another vehicle near you during
When driving, drive slowly with caution when the zero visibility on roads at site.
visibility is very low. Ensure you parked in right place during this
Pull over completely to a safe place off the sandstorm to prevent any collision with other
paved portion of the roadway during low oncoming vehicles.
visibility.
Remove banding, crate material, nails, paint Ensure all unwanted materials to be disposed
bottle, etc. and dispose of properly. properly on designated location skip bins.
Proper planning and look ahead by Discipline Prioritize the housekeeping scheduled on or
Supervisor/Foreman. before the activity on daily basis on site.
Prior to commencing work, as part daily Construction Team shall be accountable for all
progress, he shall plan for: the materials and pre-arranged staging
Housekeeping resources - hauling equipment location area to prevent any materials
(loader / dump truck / forklift) and dedicated scattered on the surroundings.
Poor Housekeeping. crew.
Housekeeping Lack of proper planning Regular collection of rubbish, every end of shift 2 2 4 2 1 2
Lack of resources at minimum
Waste skips / covered metal trash bins /
disposable trash bags, etc.
Temporary staging area of scrap materials
Pre-arranged staging area for construction
materials, tools / equipment
Access for personnel and equipment
Barricades / signs required
Debris and other unnecessary materials shall be Ensure all waste materials to be disposed
discarded from site. properly on timely manner especially the
Empty drinking bottles and wet garbage from hazard materials.
excess food should be properly disposed at A designated garbage bins to be provided for
designated bins and hauled out daily. segregated waste are to be followed.
Accumulation attracts Portable Toilets should be maintained on Daily Assigned Housekeeper to ensure Toilets are
disease carrying Basis. maintained with checklist on daily signed by
2 2 4 2 1 2
insect and animals Trash and garbage shall only be disposed of at his supervisor.
Not sanitized Toilets approved sites as designated by RED SEA or local Ensure approved third-party garbage collector
Environmental damaged municipality. to be collected on site.
All unwanted materials at the site should be Any hazard materials on site especial care for
disposed of especial hazard materials. the environmental impact and disposed
properly.
RED_SEA_GLOBAL
Proper planning and look ahead by Discipline Ensure proper planning and look ahead by
Supervisor. Prior to his activities he shall: construction team of any activity at site.
Familiarize himself and his team with the site- Ensure to comply with RSG-HS-ADM-0007
specific emergency procedure. (Emergency Preparedness and Response) of
Know the actual locations of nearest safe any emergency protocol.
assembly areas. Conduct toolbox talk with his Follow the STOP Work or Evacuation Alarm, as
crew on emergency procedure. an instruction from Site ERT / HSE, of any
See to it that safe access route is available from emergency protocol.
work area towards the nearest safe assembly Conduct emergency training drills in
area. Be familiar with the prevailing wind against coordination with RED SEA/SC for the
the locations of nearest safe assembly points. At awareness by all workers on site.
least 2 safe assembly points in opposite Ensure emergency contact list to be posted at
directions shall be known to the crew from each site and keep up to date the contact list.
work location. Provide training to all workers on how to
Be familiar with site specific Emergency contact the details in the emergency contact
Lack of proper
Response Plan (ERP) and requirements of this list.
planning / emergency
document. Understand / comply with RSG-HS- Ensure the provision of Emergency contact list
readiness /
Emergency Preparedness ADM-0007 (Emergency Preparedness and 2 2 4 available at site. 2 1 2
awareness of safe
Response). Upon hearing site STOP Work or
evacuation procedure.
Evacuation Alarm, or receipt of an instruction
Lack of resources
from Site ERT / HSE, Discipline Supervisor shall
lead his crew to ensure following actions are
taken: Stop work, Alarm others, Shutdown all
machines e.g., generator, welding machines,
etc.. Check wind direction
Proceed to nearest safe assembly area in cross
wind direction. Participate in the headcount,
report missing person (if any)
Stay at safe assembly area, remain attentive, do
not engage in any unauthorized activity, wait for
further instruction. All site personnel to
participate in training drills. Conduct emergency
training drills in coordination with RED SEA/SC.
Note: All High and Very High residual risk ratings (10-25) require review and approval by Construction Director/Manager/Facility or Operations Manager before starting work to ensure that the additional
controls are adequate to execute the task safely.