This photographic report documents progress on the Fairmont Krishna Icon Skyscrapers project in Wakad, India from October 15-31, 2023. Over this period, work progressed on the 11th floor slab, including steel reinforcement, shuttering, and casting. Column casting also occurred on the 10th floor. Other work included shuttering on the 12th slab, gypsum installation on the 3rd floor, AAC block work on the 4th and 5th floors, internal plastering on the 3rd floor, and plumbing and tile work on the 1st floor. The report was prepared by Abhijeet Patil and verified by Yogesh Joshi.
This photographic report documents progress on the Fairmont Krishna Icon Skyscrapers project in Wakad, India from October 15-31, 2023. Over this period, work progressed on the 11th floor slab, including steel reinforcement, shuttering, and casting. Column casting also occurred on the 10th floor. Other work included shuttering on the 12th slab, gypsum installation on the 3rd floor, AAC block work on the 4th and 5th floors, internal plastering on the 3rd floor, and plumbing and tile work on the 1st floor. The report was prepared by Abhijeet Patil and verified by Yogesh Joshi.
This photographic report documents progress on the Fairmont Krishna Icon Skyscrapers project in Wakad, India from October 15-31, 2023. Over this period, work progressed on the 11th floor slab, including steel reinforcement, shuttering, and casting. Column casting also occurred on the 10th floor. Other work included shuttering on the 12th slab, gypsum installation on the 3rd floor, AAC block work on the 4th and 5th floors, internal plastering on the 3rd floor, and plumbing and tile work on the 1st floor. The report was prepared by Abhijeet Patil and verified by Yogesh Joshi.