F&B Building ( Block - A )

Walling Work
Plastering Work for Brick Wall on GF
Brickwork for Wall on 1st Floor (Include Stiffener Column & Lintel)

This Week Activities


Trades Of Work

Location

Plastering Work for Brick Wall on Ground Floor

F & B Building

Excavation & Brickwork for IC & Waste Sump Man Hole

F & B Building

Casting Concrete for ST 4 on GF

F & B Building

F & B Building

Brick Wall, R.C.C Lintel & R.C.C Stiffener work on 1st Floor
Rebar Installation,Fixing formwork & Casting Concrete for 2nd Floor Slab (GL
A1~A5)
Excavation & Brickwork for Encasing Steel Column at Zone-4

Fixing Formwork for Columns

Remark

F & B Building
Aquarium Building
Service Building

Plan For Next Week


Trades Of Work

Location

Plastering Work for Brick Wall on Ground Floor

F & B Building

Excavation & Brickwork for IC & Waste Sump Man Hole

F & B Building

Earth Dressing for Lean concreting bet; GL A1 & A5

F & B Building

Rebar Installation for ST 2 (FF to SF)

F & B Building

F & B Building

Brick Wall, R.C.C Lintel & R.C.C Stiffener work on 1st Floor
Rebar Installation,fixing formwork & casting concrete for 2nd Floor Slab (GL
A9~A12)
Excavation & Brickwork for Encasing Steel Column at Zone-4

Casting Concrete for Columns

Remark

F & B Building
Aquarium Building
Service Building

SI/VO/NCR
Status

Status
No. of SI Issue for previous

No of VO previous

NCR previous

No. of SI Issue for this week

No of VO this week

NCR this week

No of VO up to this wk

NCR up to this wk

Total SI up to this week


Project Manager
Name

Project Engineer
Sign

Name Sai Thaung Nyunt

PROGRESS PHOTOS

Plastering Work for Brick Wall on Ground Floor

FO-PM-04 REV-00

Prepare By: Site Engineer


Sign

Preriod From: 28-Jul-2016

Name Chu Pwint May Sign


To:

3-Aug-2016

Excavation & Brickwork for IC & Waste Sump Man Hole

Page: 2/3