Professional Documents
Culture Documents
Pulse Build Letter To Suppliers
Pulse Build Letter To Suppliers
TABLE OF CONTENTS
1. PURPOSE/SCOPE................................................................................................................................................3
2. INSTRUCTIONS..................................................................................................................................................3
2.1. CUSTOMIZE THE LETTER.............................................................................................................................3
3. PULSE LETTER BODY (NEXT PAGE).............................................................................................................3
4. REFERENCES......................................................................................................................................................6
5. END OF DOCUMENT.........................................................................................................................................6
1. PURPOSE/SCOPE
The formal Pulse Build Letter communicates the Pulse Requirements to each
Supplier included in the Pulse Process
2. INSTRUCTIONS
2.1. CUSTOMIZE THE LETTER
Customize the Pulse Letter template on the following pages to suit your Pulse Order
Process.
(1) Replace and reformat all text highlighted in yellow
(2) Complete the Order Number Table; fill in the Part Number, Quantity Requested,
and Requested Date for all parts included in the Pulse Process.
(3) Complete the Requirements Table; provide Specific Pulse Requirements
(typically outlined Pulse Plan Requirements)
(4) Copy and Paste the completed letter template into a new Word document
(5) Send the letter to your Supplier.
May 8, 2019
Dear Supplier,
Your organization was selected as a supplier to Polaris of critical components for one of our
new product introductions. To ensure that the launch of this new product line is successful, we
are requiring you to complete a Pulse Order to identify any potential manufacturing issues that
would adversely impact our product launch schedule.
The procedural requirements can be found in Section 4.8 of the Supplier Quality Manual
located on the Polaris website:
https://www.polarissuppliers.com
The parts produced for the Pulse Order must be representative of your long-term planned
production process. Any deviations from the planned production process must be
communicated to Polaris and agreed upon in writing. If not yet approved, you may also use this
as an opportunity to do your PPAP submittal based off the Pulse Build quantity.
Order Number XXXXXX has been issued for the following parts:
Part Number Quantity Requested Requested Date
The requirements of the above-mentioned order are outlined below. Evidence of completion
must be provided to your Polaris Supplier Quality Lead.
Requirement
XXX EXAMPLE ITEMS COPIED FROM Pulse Plan Requirements – TESTING/PACKAGING ETC
Page 4 of 7
Polaris Industries Inc.
7290 East Viking Boulevard
Wyoming, MN 55092
651-408-7200
651-408-7603 fax
If you are concerned with the project timing, please contact your NPI Sourcing Lead as soon as
possible to discuss alternate plans.
Your acknowledgement and acceptance of the processes outlined above and in the SQAM is
required no later than <Date>. Please sign and return the executed document to me via e-mail.
Name: Title:
Signature: Date:
Sincerely,
Page 5 of 7
Number: OPS-FORM-1526
Title: Pulse Build Letter
Revision: 01 Page: 6 of 7
4. REFERENCES
Pulse Order Process, Doc # 01611
5. END OF DOCUMENT
Revision: 01 Page: 7 of 7