You are on page 1of 1

NOTES

1. ELECTRICAL WORK SHOWN HERE SHALL BE EXECUTED IN ACCORDANCE WITH THE LATEST
EDITION OF NEC CODES & EQUIVALENT STANDARDS.

2. THE CONTRACTOR SHALL VERIFY ALL CABLE ROUTE AND PROVIDE DETAILED SHOP DRAWINGS
DURING EXECUTION.

WHERE:
EXISTING
PROPOSED

RISER UP TO MV ATS AT
LEVEL 5

TO MVATS - 3 AT EXISTING 3-1/C-95mm² XLPE + 1/C 25mm² PVC(G)


LEVEL 5 IN 4" DIA EMT CONDUIT RISER DOWN TO B2 PARKING GENERATOR
2 SETS OF 3-1/C-95mm² XLPE + ROOM
1/C 25mm² PVC(G) IN 4" DIA EMT CONDUIT FROM MV
GENERATOR CAMPUS POWER AT CENTRAL PLANT

3-1/C-95mm² XLPE + 1/C 25mm² PVC(G)


IN 4" DIA EMT CONDUIT

EXISTING 2 SETS OF 3-1/C-95mm² XLPE +


1/C 25mm² PVC(G) IN 4" DIA EMT CONDUIT FROM MV
GENERATOR CAMPUS POWER AT CENTRAL PLANT

WE BUILD TO CARE
ENGINEERING DESIGN MANAGEMENT
King Faisal Specialist Hospital & Research Centre DEPARTMENT - RIYADH
Gen. Org. PO BOX 3354 RIYADH 11211, KINGDOM OF SAUDI ARABIA

TRANSFERRING OF ALL LOAD TO ESSENTIAL POWER


SUPPLY IN PRIVATE WING

KFSHRC - RIYADH
PRIVATE WING, EMS BUILDING
VARIOUS LOCATION

ON-SITE BACK UP GENSET EMERGENCY MV


POWER DISTRIBUTION SYSTEM LAYOUT

CAPITAL PROJECT
EDMD-2326
TENDER
ON-SITE BACK UP GENSET

C H E C K A L L D I M E N S I O N S O N S I TE
BASEMENT 1 PRIVATE WING FLOOR PLAN E-07 00 11/05/2023
1 EMERGENCY MV POWER DISTRIBUTION SYSTEM LAYOUT
E-07 SCALE : 1:125M