Professional Documents
Culture Documents
Step Wait Monit Commands SLC Gen Auxiliaries on Step Wait Monit Command Run-up unit raise
2 0 8s SLC Oil Pumps on 15 0 30 s Ch back Ign gas sol valves 1&2 close
Voltage Controller on Turbine speed >900rpm
SLC Jacking oil pump on
Synchronizing off Step Wait Monit Command Run-up unit raise
SLC gen cooling water pumps on 16 0 170 s Ch back Turbine speed >2100rpm
Emer bear oil pump on SFC off
SLC Turning gear off
Turning Gear valve close Step Wait Monit Command Run-up unit raise
17 0 50 s Ch back Turbine speed >2820rpm
Ch.back All above commands feed back ok
Press beh main oil pumps >min Step Wait Monit Command Run-up unit raise
Main lube oil pump-1 on 18 5 s 5s Excitation on
SLC oil circulation off Main lube oil pump-2 off
Oil vapour extractor on Emer bear oil pump off
Ch back Excitation on
Step Wait Monit Command HSD Shut off valve MBN10AA015 open
3 0 200 s Ch.back HSD Shut off valve MBN10AA015 open Step Wait Monit Command Run-up unit raise
19 0 s 1s
Step Wait Monit Command Lifting sol emer trip energized
Synchr breaker on
4 0 4s Booster pump gov oil on
Lube oil cool fans on
Ch.back Pr monit 1 trip act >min
Pr governing oil >min
Step Wait Monit Commands SLC Turning gear on Step Wait Monit Command Sol valve fuel oil return shut close
11 6s 6s Main lube oil pump-2 off 27 0 s 80 s Ch back PD FO return pipe <min
Ign gas sol valve-2 open
Ch back pr ign gas sol v-2 >min Step Wait Monit Command FO start up pr lim for 08 sec open
All above commands feed back ok 28 0 s 50 s Ch back FO Start up pr limit valve open
Fuel oil Fuel gas Pr FO feed <min
Step Wait Monit Commands Run-Up unit raise Step Wait Monit Command Sol valve fuel oil filling close
12 0 25 s Solenoid valve FO ESV open 29 0 s 20 s FO Start up pr limit valve open
Ch back FO ESV >0%
FO return shut off valve open if all above operations are
if there is filling operation fault successful then to step-7
then to step-30
Step Wait Monit Commands Run-up unit raise
13 0 10 s Solenoid FG ESV open
Ch back FG ESV >0% Step Wait Monit Command FO injection pump off
30 4 s 4s Sol valve fuel oil filling close
SLC HSD forwarding off
Wait is the minimum time at which machine should wait in the step. To step-23 Ch back HSD forwarding & FO pumps off
Monit is the maximum time to which the machine will wait for check back signal,
if these check backs are received within that time the machine goes to the next
step otherwise there will be a criteria fault and machine will be held in that step.
Wait and Monit times start together.
48
X67: in parallel to ESV
48
GT-1&2 shut down program (simplified)
Shut down
Note:
- The shutdown command can be cancelled
Step Wait Monit Command SLC Oil Pumps on during deloading or before closing the ESV
51 8s 8s SLC Turning gear on at 2300 rpm and machine can be restarted
SLC Jacking oil pump on by shifting it to manual to auto then to start.
Frequency convertor off
Step Wait Monit Command Blow off MBA41AA001 open - This is command for opening of bleed valve,
52 0 2400 s Blow off MBA41AA010 open it will open when 132 kV breaker is open.
Unit Auxiliay changeover open - Electric operated bleed valve opens when
Unload (at 11 MW / min) speed is decreased to 2910 rpm.
Shut down return valve MBN73AA00 open
FO recirculation MBN55AA001 open
Ch.back SLC Oil Pumps on
SLC Turning gear on
SLC Jacking oil pump on
Generator speed < 2300 rpm
Generator out put < 3 MW
49