You are on page 1of 4

NOTE

D2.b

D2.a D2.a

C C
B 2150
NO. REVISION DATE

PROJECT

THE PROPOSED CONSTRUCTION OF


A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT
C C
Elv +44.900 PT. Sime Darby Oils Sei Mangkei Refinery
The City Tower Lt. 12 Unit 1N
D2.b JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

DETAIL - D2 SECTION D2.b-D2.b


SCALE 1:25 SCALE 1:25

KONSULTAN
1800 PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
150

Planning & Designing and Project Management


Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

APPROVED BY KONSULTAN
900 900

SECTION D2.a-D2.a
SCALE 1:25
KONTRAKTOR

Name D2 PT. MALIGO MAS UTAMA


Soil and Foundation, Architecture and Civil Engineering

Total 2 Unit Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

A UPVC Frame DRAWN BY CHECKED BY

B Solid Wood Frame (Damar Laut)


C Wood (Engineered Particle Board)
MATERIAL

DODI. A AZMI AREF


D UPVC Panel
TITLE
E Tempered Glass 10 mm
F Brick LABORATORY
G Clear Glass 6mm
SUB TITLE
H Clear Glass 8mm
I Sundblasting Sticker DETAIL DOOR D2
Completeness
DRAWING CODE DATE
Lock 1 Unit
SDOSMR-LAB-A-008 DESEMBER 2023
Hinge 3" -
SCALE PAGE REVISION
Hinge 4" 6 Unit
Latch 2 Unit 1:20 08 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

D4.b 150 4A.b 150

150 150

NO. R E V ISION DATE


D4.a D4.a 4A.a 4A.a
PRO JECT

H H
1760 2150 1760 2150 THE PROPOSED CONSTRUCTION OF
B B I
A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
C C SUMATERA UTARA

CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT
Elv +44.900/Elv +49.400 Elv +44.900/Elv +49.400

D4.b 4A.b

KONSULTAN
DETAIL - D4 SECTION D4.b-D4.b DETAIL - D4A SECTION 4A.b-4A.b PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

900 900
Name D4 APPROVED BY KONSULTAN
Name D4A
150

150
Total 32 Unit Total 1 Unit
A UPVC Frame
SECTION D4.a-D4.a B Solid Wood Frame (Damar Laut) SECTION 4A.a-4A.a
A
B
UPVC Frame
Solid Wood Frame (Damar Laut)
SCALE 1:25 SCALE 1:25
C Wood (Engineered Particle Board) KONTRAKTOR
C Wood (Engineered Particle Board)
MATERIAL

MATERIAL
D UPVC Panel D UPVC Panel PT. MALIGO MAS UTAMA
Soil and Foundation, Architecture and Civil Engineering
E Tempered Glass 10 mm E Tempered Glass 10 mm
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
F Brick F Brick
North Sumatera-Indonesia

G Clear Glass 6mm G Clear Glass 6mm DRAWN BY CHECKED BY

H Clear Glass 8mm H Clear Glass 8mm


I Sundblasting Sticker I Sundblasting Sticker
Completeness Completeness DODI. A AZMI AREF

Lock 1 Unit Lock 1 Unit T ITLE

Hinge 3" - Hinge 3" -


Hinge 4" 3 Unit Hinge 4" 3 Unit LABORATORY
Latch - Latch
SUB T ITLE

DETAIL DOOR D4-D4A

DRAWING CODE DATE

SDOSMR-LAB-A-009 DESEMBER 2023

SCALE PAGE REVISION

1:20 09 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

D5A.b 150
D5.b 150

NO. R E VISION DATE

D5.a D5.a D5A.a D5A.a PROJECT

THE PROPOSED CONSTRUCTION OF


C
C 2150 A NEW INTEGRATED REFINERY COMPLEX
2150 2180
B AT KEK SEI MANGKEI, KAB. SIMALUNGUN
B
SUMATERA UTARA

CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

C
C
Elv +44.900/Elv +49.400 Elv +53.420 30

D5A.b KONSULTAN
D5.b
PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management

DETAIL - D5 SECTION D5.b-D5.b DETAIL - D5A SECTION D5A.b-D5A.b Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 APPROVED BY KONSULTAN

900 900
Name D5 Name D5A

150
150

Total 1 Unit Total 1 Unit


KONTRAKTOR
A UPVC Frame A UPVC Frame
SECTION D5.a-D5.a B Solid Wood Frame (Damar Laut)
SECTION D5A.a-D5A.a B Solid Wood Frame (Damar Laut) PT. MALIGO MAS UTAMA
Soil and Foundation, Architecture and Civil Engineering
SCALE 1:25 SCALE 1:25
C Wood (Engineered Particle Board) C Wood (Engineered Particle Board) Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

MATERIAL
MATERIAL

D UPVC Panel D UPVC Panel


DRAWN BY CHECKED BY
E Tempered Glass 10 mm E Tempered Glass 10 mm
F Brick F Brick
G Clear Glass 6mm G Clear Glass 6mm
DODI. A AZMI AREF
H Clear Glass 8mm H Clear Glass 8mm
T ITLE
I Sundblasting Sticker I Sundblasting Sticker
Completeness Completeness LABORATORY
Lock 1 Unit Lock 1 Unit
SUB T ITLE
Hinge 3" - Hinge 3" -
Hinge 4" 3 Unit Hinge 4" 3 Unit
DETAIL DOOR D5-D5A
Latch - Latch
DRAWING CODE DATE

SDOSMR-LAB-A-010 DESEMBER 2023

SCALE PAGE REVISION

1:20 10 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

D6.b 150
50

B
C
NO. REVISION DATE
D6.a C D6.a
PROJECT

2150 2100
C THE PROPOSED CONSTRUCTION OF
A NEW INTEGRATED REFINERY COMPLEX
C AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT

C PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
C Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

C
Elv +44.900/Elv +49.400
D6.b KONSULTAN

DETAIL - D6 SECTION D6.b-D6.b


PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia

SCALE 1:25 SCALE 1:25 Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

APPROVED BY KONSULTAN

Name D6
150

Total 4 Unit
800
KONTRAKTOR
A UPVC Frame
SECTION D6.a-D6.a B Solid Wood Frame (Damar Laut)
PT. MALIGO MAS UTAMA
Soil and Foundation, Architecture and Civil Engineering

SCALE 1:25
C Wood (Engineered Particle Board)
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia
MATERIAL

D UPVC Panel DRAWN BY CHECKED BY

E Tempered Glass 10 mm
F Brick DODI. A AZMI AREF

G Clear Glass 6mm TITLE

H Clear Glass 8mm LABORATORY


I Sundblasting Sticker
SUB TITLE
Completeness1 Unit
DETAIL DOOR D6
Lock -
Hinge 3" - DRAWING CODE DATE

Hinge 4" 3 Unit SDOSMR-LAB-A-011 DESEMBER 2023

Latch - SCALE PAGE REVISION

1:20 11 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.

You might also like