Professional Documents
Culture Documents
D2.b
D2.a D2.a
C C
B 2150
NO. REVISION DATE
PROJECT
CLIENT
C C
Elv +44.900 PT. Sime Darby Oils Sei Mangkei Refinery
The City Tower Lt. 12 Unit 1N
D2.b JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat
APPROVED BY CLIENT
KONSULTAN
1800 PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
150
APPROVED BY KONSULTAN
900 900
SECTION D2.a-D2.a
SCALE 1:25
KONTRAKTOR
Total 2 Unit Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia
150 150
H H
1760 2150 1760 2150 THE PROPOSED CONSTRUCTION OF
B B I
A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
C C SUMATERA UTARA
CLIENT
APPROVED BY CLIENT
Elv +44.900/Elv +49.400 Elv +44.900/Elv +49.400
D4.b 4A.b
KONSULTAN
DETAIL - D4 SECTION D4.b-D4.b DETAIL - D4A SECTION 4A.b-4A.b PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id
900 900
Name D4 APPROVED BY KONSULTAN
Name D4A
150
150
Total 32 Unit Total 1 Unit
A UPVC Frame
SECTION D4.a-D4.a B Solid Wood Frame (Damar Laut) SECTION 4A.a-4A.a
A
B
UPVC Frame
Solid Wood Frame (Damar Laut)
SCALE 1:25 SCALE 1:25
C Wood (Engineered Particle Board) KONTRAKTOR
C Wood (Engineered Particle Board)
MATERIAL
MATERIAL
D UPVC Panel D UPVC Panel PT. MALIGO MAS UTAMA
Soil and Foundation, Architecture and Civil Engineering
E Tempered Glass 10 mm E Tempered Glass 10 mm
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
F Brick F Brick
North Sumatera-Indonesia
1:20 09 R.00
D5A.b 150
D5.b 150
CLIENT
APPROVED BY CLIENT
C
C
Elv +44.900/Elv +49.400 Elv +53.420 30
D5A.b KONSULTAN
D5.b
PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management
DETAIL - D5 SECTION D5.b-D5.b DETAIL - D5A SECTION D5A.b-D5A.b Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id
SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 APPROVED BY KONSULTAN
900 900
Name D5 Name D5A
150
150
MATERIAL
MATERIAL
1:20 10 R.00
D6.b 150
50
B
C
NO. REVISION DATE
D6.a C D6.a
PROJECT
2150 2100
C THE PROPOSED CONSTRUCTION OF
A NEW INTEGRATED REFINERY COMPLEX
C AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA
CLIENT
APPROVED BY CLIENT
C
Elv +44.900/Elv +49.400
D6.b KONSULTAN
SCALE 1:25 SCALE 1:25 Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id
APPROVED BY KONSULTAN
Name D6
150
Total 4 Unit
800
KONTRAKTOR
A UPVC Frame
SECTION D6.a-D6.a B Solid Wood Frame (Damar Laut)
PT. MALIGO MAS UTAMA
Soil and Foundation, Architecture and Civil Engineering
SCALE 1:25
C Wood (Engineered Particle Board)
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia
MATERIAL
E Tempered Glass 10 mm
F Brick DODI. A AZMI AREF
1:20 11 R.00