Professional Documents
Culture Documents
Updated status
Toulouse, September 9, 2015
Nexteer Grey Box RFI
Short history
May ’15 “Closed ECU” with integrated connectors headers
with Price indication feed-back : please use required PCB cable attachment
from the RFQ package
minimize changes on the motor and its leadframe
June ’15 “Closed ECU” with PCB cable attachment & cable
feed-back : concerns on the PCB cable attachment
on the MPS calibration and on the EMC layout
End of August Request to use PSA qualified connectors headers instead of PCB cable
attachment
September 1st “Open ECU” with integrated connectors headers
3. 3 additional test points added for Motor phase measurement during PowerPack
assembly and testing @ Nexteer
We are more confident and positive about the proposed ECU / motor connection
based on the fact that we intend to use 3 forks per phase which means that it is
extremely unlikely to have simultaneous failures on the 3 forks.
We do not have data from the competition, but have never heard or read anything
about potential issues originating from the ECU / motor connection.
Female connectors
from OEM harness
Heatsink
Connectors headers
EMC filter
(Common mode choke and
2 x DC-link capacitors)
Motor connector