AVANCE DIARIO DE INST.

DRYWALL C2 Y C3
I.E. TORIBIO DE LUZURIAGA Y MEJIA
Contingencia C2 C3
A. Total (m2) 824 690
Personal Personal
Fecha Avan (m2) Acum (m2) % Acum. Avan. (m2) Acum (m2) % Acum.
Prog Real Prog
Acumulado 253.51 253.51 30.77% - - 0 0.00 0.00% -
23/01/24 25.00 278.51 33.80% 15 6 15 15.00 2.17% 10
24/01/24 278.51 33.80% 15.00 2.17%
25/01/24 278.51 33.80% 15.00 2.17%
26/01/24 278.51 33.80% 15.00 2.17%
27/01/24 278.51 33.80% 15.00 2.17%
28/01/24 278.51 33.80% 15.00 2.17%
29/01/24 278.51 33.80% 15.00 2.17%
30/01/24 278.51 33.80% 15.00 2.17%
31/01/24 278.51 33.80% 15.00 2.17%
01/02/24 278.51 33.80% 15.00 2.17%
02/02/24 278.51 33.80% 15.00 2.17%
03/02/24 278.51 33.80% 15.00 2.17%
04/02/24 278.51 33.80% 15.00 2.17%
05/02/24 278.51 33.80% 15.00 2.17%
06/02/24 278.51 33.80% 15.00 2.17%
07/02/24 278.51 33.80% 15.00 2.17%
08/02/24 278.51 33.80% 15.00 2.17%
09/02/24 278.51 33.80% 15.00 2.17%
10/02/24 278.51 33.80% 15.00 2.17%
11/02/24 278.51 33.80% 15.00 2.17%
12/02/24 278.51 33.80% 15.00 2.17%
13/02/24 278.51 33.80% 15.00 2.17%
14/02/24 278.51 33.80% 15.00 2.17%
15/02/24 278.51 33.80% 15.00 2.17%
16/02/24 278.51 33.80% 15.00 2.17%
17/02/24 278.51 33.80% 15.00 2.17%
18/02/24 278.51 33.80% 15.00 2.17%
19/02/24 278.51 33.80% 15.00 2.17%
Evolución de la programación de personal en Inst.
Personal Drywall - C2 - Toribio de Luzuriaga
Real 16
- 14
12
5
10
8
6
4
2
0
24 24 24 24 24 24 24 24 24 24 24 24 24 24
01/ 01/ 01/ 01/ 01/ 02/ 02/ 02/ 02/ 02/ 02/ 02/ 02/ 02/
/ / / / / / / / / / / / / /
23 25 27 29 31 02 04 06 08 10 12 14 16 18

Prog. Real

Evolución de la programación de personal en Inst.


Drywall - C3 - Toribio de Luzuriaga
12

10

0
24 24 24 24 24 24 24 24 24 24 24 24 24 24
01/ 01/ 01/ 01/ 01/ 02/ 02/ 02/ 02/ 02/ 02/ 02/ 02/ 02/
/ / / / / / / / / / / / / /
23 25 27 29 31 02 04 06 08 10 12 14 16 18

Prog. Real

You might also like