Accident Details
No. of fatality 0
Safety Documentations
Project Details
The emerging Pharmaceutical Site Readiness Project at
(KFSHRC) first phase includes the installation of barriers and the
second phase includes demolition work, concrete and steelwork,
and architectural work including block, plaster, ceiling, doors,
and windows installation works and mechanical work including
firefighting work, HVAC system, drainage system, water supply,
chilled water system and rerouting of service piping. Electrical
work includes the installation of boxes, pulling pipes, cable trays,
and installation cables for fire alarms, transformers, power
systems, lighting systems, fire alarm systems, and access control
systems.
NIL
Security Issues
S.No Date Descriptions Remarks
Nil
Training Log
S. No Training Topic Number of sessions Number of attendees
01 Induction Training 0 0
02 Toolbox Talk 1 3
PTW Log
S. No Permit Type Number of Issued Permits for the week
01 Lifting Permit 0
02 Work at Height 0
03 Hot work 0
04 Confined Space 0
05 Excavation 0
EMERGING PHARMACEUTICAL SITE READINESS
PROJECT (KFSHRC) C/0081/23
Before After
EMERGING PHARMACEUTICAL SITE READINESS
PROJECT (KFSHRC) C/0081/23
EMERGING PHARMACEUTICAL SITE READINESS
PROJECT (KFSHRC) C/0081/23