You are on page 1of 2

Project Proposed Commereial Building Report RJ4

Name No
Contract APEX Structure Pvt Ltd Date 1501 2023
or
Name
WEEKLY EHS STATISTICS REPORT

EHS STATISTICS REPORTS FOR THE WEEK FROM 08/01/2023 TO


14/01/2023

SI. Descripti Status


on
TTotal Man-hours worked for the week 11208
Cumulative Man-hours worked From 08701/2023to 63500
14/01/2023
3No.of First-Aid cases 01
3 No.of Reportable Accidents on project 01
4 No.of Near Misses 00
No.ofLost Work Day (LWD) cases 00
6 No.of safety Inspections conducted 01
7No.of Safety Audits conducted 01
8 No.of safety Inspection Reports Issued7Infraction 00
Notices
No.ofFire Extinguishers available at site (ALL Types
AWater Type (Last serviced on- 00
B CO2 Type (Last serviced on 04
C DCP Type (Last serviced on- 00
ABC Type (Last serviced on- 12
T0 No.of Training session conducted
A Firefighting training 00
B First ATd training 00
CPPEUsage training 00
D Others
11No.of Safety PEP talksTool box talk conducted
12 Total number of safety Permits Issued
13 No.of Safety sign boardsdisplayed at site 04
14 Housekeeping practices (Excellent /V Good/ Good Average
Average /Poor)_
15 EquipmentMachinery &Tools Satistactory
Inspection(Satisfactory/Not)
16 Type of PPE's using
a) Helmets, b)Safety shoes, c)Safety Belt, d) Safety All
Goggles, e)Hand gloves, f)Nose mask, g)Welding
shield etc.
17 Physical condition of the PPE in usage (Good Good
Average/ Poor)
18 License and Vehicle documents available (f Available
applicable)
19 Percentage
Workers
compliance on the usage of PPE by 100%

20 Overall EHS implementation (Excellent/V Good Average


Good/Average /Poor)
Submitted by Contractor Name Signatyre Date
Safety Officer Jerold Angelo L 15/01/2023