Professional Documents
Culture Documents
Machine details
Working Equipment
Machine type Asset no Serial number hours Software code Service contract type
5008S N/A 8VSAHY48 V4.62 PH – No Contract
Test Equipment
Serial number Equipment model Last Calibrated Test Type
N/A N/A N/A N/A
Spare parts
Batch / Serial
Code Name Quantity Location number
N/A N/A N/A N/A N/A
Work details
Start Date and Time 01/03/2024 09:00:00 AM End Date and Time 01/04/2023 11:30:00 AM
Reason for service 1B – Breakdown
Performed service type 00 – Repair
Error description Battery defective (Replacement of
battery) Overtime claimed (hours) 0.00
Call Type
Travel (Hours) 0.00 Labour (Hours) 0.00
Miscellaneous □ 0.00 Contract Charge □ 0.00
Comments
Work Details:
checked in-line fuse for functionality – functional/intact
per HD unit, T1 test fails during battery functional test
back-up battery not functioning whenever there is a power interruption
battery voltage not sufficient / quickly discharges over short period of time during power interruption
Recommendation:
per technical manual, it is recommended to replace battery pack (24 V/7.2 Ah) at base rear every second
TSC / MA interval (48 months)
Resolution:
Done
Acknowledged by:
Staff on duty
Michael Brent Apatt