Submittal Completeness
Completed Not Completed
If not, Specify
1- Drawings Does not show the relation between the building and the surrounding
2- Missing drawings for all stairs/ramps and elevators
3- Finishing Schedule is not available in most of the drawings
4-Wall sections shall be provided.
5- Miscellaneous enlarged details for all architectural components
6- Project Specifications
7- Materials data sheets
8- Bill off Quantities
Eventhough the package is in compliance with applicable codes and standards, please refere to attached comments for some areas of concerns
Design Drawings Compatibility
Compatible Not Compatible
If not, Specify
Refere to attached comments for some areas of mismatching between the drawings
Eventhough the package is in compliance with applicable Life Safety standards, please refere to attached comments for some areas of concerns
Cost Effectiveness
Optimized Design Cost Can be Reduced
If Cost Can be Reduced, Specify
1- Use the steel fiber indutrial concrete floor for all buildings by which the 150mm thick screed and epoxy paint above the flooring can be
eleminated.
2- Change the steel framing systems for all small span and single floor building to a concrete system
3- Convert all double layer cavity insulated CMU external walls of 300mm THK to 200mm THK pre insulated units