Professional Documents
Culture Documents
START
Start Up Unit
NO
High Vibration
YES
· Shut Down Unit.
· Soak Compressor using Rochem and water solution (1:1).
· Manually rotate Compressor rotor 90 degrees every hour.
Start Up Unit
NO
High Vibration
YES
· Shut Down Unit.
· Soak Compressor using Pure Rochem for 24 hours.
· Manually rotate Compressor rotor 90 degrees every hour.
Start Up Unit
NO
High Vibration
YES
· Shut Down Unit.
· Circulate Hot Rochem (70 deg C) into the case
compressor.
· Replace Lube Oil and Lube Oil Filter.
NO
High Vibration
YES
· Shut Down Unit.
· Circulate Hot Rochem (70 deg C) into the case
compressor.
· Start Up Unit.
· Increase NGP speed until compressor load speed
Compressor
High Vibration
Overhaul
YES
NO
END