1. General Introduction
This device consists of the Scale frame, Weighing module, measuring bin, Pneumatic
charging valve and Pneumatic unloading valve, which is mainly used to put in,
weighing,put out and control the Liquid materials of laundry powder.

Product Type: LIW-10 Discharge Range: 9kg


Scale measures capacity: 0.01m3 Air Source Pressure: 0.4-0.5MPa

2. Installation
1) The choice of appropriate installation, adjustment and liquid scale installation
platform remains level note peripheral devices shall not make any impact on the
scale body (for example, fan, mixer need to be done to shock absorption steps), so as
not to affect the accuracy of the weighing scale (See equipment installation
drawing).
2) Installed feeding and pneumatic valve scale and plane in 300mm keep to the
around.
3) Electrical control according to the figure will install the connection, need to completely
check line correct; Ensure that the air flow and steady, clean.

3. Verify Scale
■Equipment before the first run to the verify scale work, later every three to six months a
verify scale.
■The former should guarantee the body scale shall not have any objects, scale in vitro nor
someone or object in its role as press reset.
■In the measurement of a uniform and within a measurement equivalent to the maximum
capacity of the weight, verify scale bar input weight, for the total weight of the weight added,
then click the full scale.
■Repeat the above step two operation scale body until to null, the current weight show for
zero; When combined with all weight, the current weight show for the total weight of weight
added when the can.

4. Operating steps
(1)Production Preparation
1) Check the feeding, unloading pneumatic valve is in the closed state.
2) Check the manual valve, pneumatic valve closed whether leak material.
3) A careful check, ensure no foreign body in Scale measures.
4) Use standard weight to calibrate the LIW.

(2)Production Operation
See operation manual.

5. The main parts (* for vulnerable parts)


A. * Weighing sensors Type: MTB-10kg
B. * Two five electromagnetic Valve type: 4V21008B/DC24V

Page 1 of 2
C. Pneumatic Type: HV-52-PN16DA DN20
6. Maintain the security
1) The equipment to be cleaning every day, to keep the working area clean.
2) The end of every month need compressed air to clean the equipment surface dust
inside and outside.
3) The transportation equipment, the first in a rack of supporting equipment, in the
sensor doesn't force of the sensor loosen screw, lest sensor damage.
4) The maintenance of equipment to scale back after Verify rear can use.
5) Operation observe hole should be closed, lest barter fall into one or cause injury.
6) Remove the pneumatic valve should be shut off gas source, then removed tracheal
rear can remove.
7) And change the electromagnetic valve should turn off the power and air supply.

Page 2 of 2