Sanibheri Rural Municiplity

Office of The Rural municipal executive


simli Rukum west
Karnali Provinance
Nepal
Rate Analysis
Labour Material
S.N Particulars Unit Type mds Rate Amount Type Unit Qnty. Rate Amount lead Total Remarks
0 1 3 4 5 6 7 8 9 10 11 12 13 14 15
१ Preparation of construction site
cutting of tress etc all complete and
1 transportation up to 15m
ka 12 cm to 30cm circemference per unskill 0.13 696 90.48 90.48
kha 21 cm to 60cm circemference per unskill 0.39 696 271.44 271.44
ga 61 cm to 90cm circemference per unskill 0.98 696 682.08 682.08
gha 91 cm to 120cm circemference per unskill 0.98 696 682.08 682.08
na 121cm to 180cm circemference per unskill 4 696 2784 2784
cha 181cm to 240cm circemference per unskill 4 696 2784 2784
chha 241 cm to 300cm circemference per unskill 10.4 696 7238.4 7238.4
ja More than 301 cm circemference per unskill 41.67 696 29002.32 29002.32
uprooting of tree with transportation up
2 to 15m per unskill
ka 12 cm to 30cm circemference per unskill 0.4 696 278.4 278.4
kha 21 cm to 60cm circemference per unskill 0.53 696 368.88 368.88
ga 61 cm to 90cm circemference per unskill 2.52 696 1753.92 1753.92
gha 91 cm to 120cm circemference per unskill 2.52 696 1753.92 1753.92
na 121cm to 180cm circemference per unskill 12 696 8352 8352
cha 181cm to 240cm circemference per unskill 12 696 8352 8352
chha 241 cm to 300cm circemference per unskill 29.6 696 20601.6 20601.6
cutting uprooting etc of plants for 100m2
3 above and 15 plants dense m2 unskill 0.04 696 27.84 27.84
cutting uprooting etc of plants for 100m2
4 above and 15 plants dense m2 unskill 0.03 696 20.88 20.88
cutting uprooting etc of plants and
5 levelling etc all complete m2 unskill 0.023 696 16.008 16.008
cutting uprooting etc of bamboo all
6 complete m3 unskill 2.8 696 1948.8 1948.8
7 surface dressing work all complete m2 unskill 0.01 696 6.96 6.96
8 cutting of top soil (15-20)cm work m2 unskill 0.16 696 111.36 111.36
9 keep top soil in slope m3 unskill 0.04 696 27.84 27.84
dressing compacting etc all complete for
10 top soil in slope m3 unskill 0.01 696 6.96 6.96
2 Rock /soil works 696
1 soft soil cutting works all complete m3 Unskl. 0.70 696 487.2 487.2
2 Boulder Mix Soil Cutting work all m3 Unskl. 0.80 696 556.8 556.8
Complete
3 Removal of stone all complete m3 Unskl. 1.00 696 696 696
4 Medium Rock cutting work without m3 Unskl. 3.00 696 2088 2088
5 blasting
Hard Rock cutting without Balasting 696
Without Chisel m3 Unskl. 5.00 696 3480

Prepared by Checked by Approved by


with Chisel m3 Unskl. 24.20 696 16843.2
Pit Excavation in soft soil all complete
6 m3 Unskl. 1.00 696 696
7 Pit Excavation in cracked and soft rock all m3 Unskl. 2.50 696 1740
8 complete
Ditch cutting works in Hard m3 Unskl. 1.25 696 870
Earthwork excavation in foundation ,

9 Pipeline etc.all complete works m3 Unskl. 1.59 696 1106.64


Earthwork excavation in foundation ,

10 drain etc.all complete works 696


in soft mooorum stone

m3 Unskl. 3.00 696 2088


in medium hard rock w/o balsting

m3 Unskl. 4.50 696 3132


Box cutting works all complete

11 696
in soft soil

m3 Unskl. 0.78 696 542.88


in hard soil

m3 Unskl. 0.94 696 654.24


in soft rock

m3 Unskl. 2.00 696 1392


Medium Rock

m3 Unskl. 2.50 696 1740


Filling with ordinary soil

12 696
compaction in layer (15cm in each

a compaction ) by labour m3 Unskl. 0.50 696 348


compaction in layer (15cm in each
compaction ) by labour exculding
b watering m3 Unskl. 0.25 696 174
Transportion of material additional each
10 m with 50% tokari & 50% wheel
13 Barroow m3 Unskl. 0.12 696 83.52
Back filling for Pipe line Treanch

14
in soft soil

m3 Unskl. 0.50 696 348


inf medium soil

m3 Unskl. 0.55 696 382.8


in hard soil

m3 Unskl. 0.63 696 438.48

Prepared by Checked by Approved by


in gravel & Boulder mix soil

m3 Unskl. 0.60 696 417.6


Removal of soil eroson

15
soft soil

m3 Unskl. 0.42 696 292.32


Hard soil

m3 Unskl. 0.53 696 368.88


soft rock

m3 Unskl. 0.88 696 612.48


Hard rock

m3 Unskl. 1.10 696 765.6


Collaction Stacking Etc of sand all

16 complete with 10m transportion


capacity of quaary < 30%

m3 Unskl. 4.54 696 3159.84


capacity of quaary 31 to 50%

m3 Unskl. 3.45 696 2401.2


capacity of quaary <51 to 65 %

m3 Unskl. 2.50 696 1740


capacity of quaary >65%

m3 Unskl. 1.43 696 995.28


Hilly region in excavting

m3 Unskl. 1.49 696 1037.04


Collaction Stacking Etc of Gravel all

17 complete with 10m transportion


5mm to 70mm

m3 Unskl. 2.50 696 1740


5mm to 40mm

m3 Unskl. 4.00 696 2784


5mm to 20mm

m3 Unskl. 5.88 696 4092.48


5mm to 80mm

m3 Unskl. 10.00 696 6960


Collaction Stacking Etc of stone all

complete with 10m transportion 696


40mm to 70 mm

m3 Unskl. 5.00 696 3480

Prepared by Checked by Approved by


70 mm to 100 mm

m3 Unskl. 4.00 696 2784


Dismantelling of culverts ,Bridge
Pavement and other structure (haluge up
18 to led of 100m)
a Dismantelling Brick Masonary m3 Unskl. 1.50 696 1044 1044
b stone Masonary m3 Unskl. 2.00 696 1392 1392
Concrete ( plane & Reinforced ) m3 Unskl. 3.00 696 2088 2088
c Masonary Mud motar m3 Unskl. 0.16 696 111.36 111.36
Exacavation of Roadway and Drain
13 696
soft soil cutting m3 Unskl. 0.50 696 348 348
Hard soil m3 Unskl. 0.60 696 417.6 417.6
ordinary Rock m3 Unskl. 2.00 696 1392 1392
Medium Rock m3 Unskl. 4.00 696 2784 2784
Hard rock (Blasting Prohibitted) m3 Unskl. 17.00 696 11832 11832
Earth Works Exacavation in foundation ,
14 Pipe line etc all complete works m3 Unskl. 1.59 696 1106.64 T 1106.64
Stone masonary work cement sand
17 Mortar 696 Stone m3 1.10 1320.00 1452.00
1 in 1:3 cement motar m3 Skl. 1.50 696 1044 Sand m3 0.42 1870.00 785.40
Unskl. 5.00 696 3480 Cement bag 3.88 764.40 2965.87
696 4524 5203.27 9727.27
in1:4 Cement Motar m3 sk 1.50 696 1044 Stone m3 1.10 1320.00 1452.00
unskill 5.00 696 3480 Sand m3 0.45 1870.00 841.50
Cement bag 3.18 764.40 2430.79
4524 4724.29 9248.29
in 1:6 Cement Motar
m3 Stone m3 1.10 1320.00 1452.00
skilled 1.50 696 1044 Sand m3 0.47 1870.00 878.90
unskiilled 5.00 696 3480 Cement bag 2.12 764.40 1620.53
4524 3951.43 8475.43
2 Mud Motar
Dry stone Mansonary work m3 skilled 1.00 696 696 stone m3 1.10 1320.00 1452.00
unskiilled 2.00 696 1392 3540.00
2088
Dry stone Mansonary work(Near the river
1 bed ) m3 skilled 1.00 696 696 stone m3 1.10 974.40 1071.84
unskiilled 2.00 696 1392 3159.84
2088
2 stone masonary work with mud motar m3 skl 1.00 696 696 stone m3 1.10 1320.00 1452.00
unskill 2.25 696 1566 clay m3 0.42 276.00 115.92
2262 1567.92 3829.92
Dry stone masonary works for abutment
3 filling m3 skl 0.30 696 208.8 stone m3 1.10 1320.00 1452.00
unskill 1.20 696 835.2
1044 2496.00
19 Stone filling in foundation m3 unskill 1.50 696 1044 stone m3 1.10 1320.00 1452.00 2496.00

Prepared by Checked by Approved by


22 Cement Concrete Works
P.C.C works in wall foundation abutment
1 etc
a in 1:3:6 m3 sk 0.30 696 208.8 Cement bag 4.4 764.40 3363.36
unskill 4.00 696 2784 Aggregate m3 0.94 2640 2481.6
2992.8 Sand m3 0.47 1870 878.9
6723.86 9716.66

a in 1:3:6 m3 sk 0.30 696 208.8 Cement bag 4.4 890.5 3918.2


unskill 4.00 696 2784 Aggregate m3 0.94 2640 2481.6
696 2992.8 Sand m4 0.47 1870 878.9
b in 1:2:4 m3 Skill 0.30 696 208.8
UnSkill 4.00 696 2784 Cement bag 6.4 764.4 4892.16
2992.8 Aggregate m3 0.89 2640 2349.6
Sand m3 0.445 1870 832.15
8073.91 11066.71

in 1:2:4 m3 Skill 0.30 696 208.8


UnSkill 4.00 696 2784 Cement bag 6.4 764.4 4892.16
2992.8 Aggregate m3 0.89 2640 2349.6
Sand m3 0.445 1870 832.15
8073.91 11066.71
2 P.C.C Work in wall Foundation etc
a in 1:5:10 m3 SK 1.00 696 696 Cement bag 2.6 764.4 1987.44
Un Skill 4.00 696 2784 Aggregate m3 0.89 2640 2349.6
3480 Sand m3 0.47 1870 878.9
5215.94 8695.94

a in 1:5:10 m3 SK 1.00 696 696 Cement bag 2.6 890.5 2315.3


Un Skill 4.00 696 2784 Aggregate m3 0.89 2640 2349.6
3480 Sand m3 0.47 1870 878.9
5543.8 9023.8

b in 1:4:8 m3 sk 1.00 696 696 Cement bag 3.4 764.4 2598.96


un skill 4.00 696 2784 Aggregate m3 0.89 2640 2349.6
3480 Sand m3 0.47 1870 878.9
5827.46 9307.46
b in 1:4:8 m3 sk 1.00 696 696 Cement m3 3.4 764.4 2598.96
un skill 4.00 696 2784 Aggregate m3 0.89 2640 2349.6
3480 Sand m3 0.47 1870 878.9
5827.46 9307.46
c in 1:3:6 m3 Skill 1.00 696 696 Cement bag 4.4 764.4 3363.36

Prepared by Checked by Approved by


Un Skii 4.00 696 2784 Aggregate m3 0.89 2640 2349.6
696 3480 Sand m3 0.47 1870 878.9
6591.86 10071.86
c in 1:3:6 m3 Skill 1.00 696 696 Cement bag 4.4 764.4 3363.36
Un Skii 4.00 696 2784 Aggregate m3 0.89 2640 2349.6
696 3480 Sand m3 0.47 1870 878.9
6591.86 10071.86
b in 1:2:4 m3 Skill 1.00 696 696 Cement bag 6.4 764.4 4892.16
Un Skill 4.00 696 2784 Aggregate m3 0.85 2640 2244
3480 Sand m3 0.445 1870 832.15
7968.31 11448.31
b in 1:2:4 m3 Skill 1.00 696 696 Cement bag 6.4 764.4 4892.16
Un Skill 4.00 696 2784 Aggregate m3 0.85 2640 2244
3480 Sand m3 0.445 1870 832.15
7968.31 11448.31

Plain Cement Concrete Works in


Superstructure .Deck Slab Beam etc
3
a in 1:2:4 M3 Skill 0.80 696 556.8 Cement bag 6.4 764.4 4892.16
Un Skill 7.00 696 4872 Aggregate m3 0.85 2640 2244
5428.8 Sand m3 0.445 1870 832.15
7968.31 13397.11
a in 1:2:4 M3 Skill 0.80 696 556.8 Cement bag 6.4 764.4 4892.16
Un Skill 7.00 696 4872 Aggregate m3 0.85 2640 2244
5428.8 Sand m3 0.445 1870 832.15
7968.31 13397.11
b in 1:1.5:3 m3 Skill 0.80 696 556.8 Cement bag 8 764.4 6115.2
Un Skill 7.00 696 4872 Aggregate m3 0.85 2640 2244
5428.8 Sand m3 0.425 1870 794.75
9153.95 14582.75
b in 1:1.5:3 m3 Skill 0.80 696 556.8 Cement bag 8 764.4 6115.2
Un Skill 7.00 696 4872 Aggregate m3 0.85 2640 2244
5428.8 Sand m3 0.425 1870 794.75
9153.95 14582.75
c in 1:1:2 m3 Skill 0.80 696 556.8 Cement bag 12.2 764.4 9325.68
Un Skill 7.00 696 4872 Aggregate m3 0.85 2640 2244
5428.8 Sand m3 0.425 1870 794.75
12364.43 17793.23
c in 1:1:2 m3 Skill 0.80 696 556.8 Cement bag 12.2 764.4 9325.68
Un Skill 7.00 696 4872 Aggregate m3 0.85 2640 2244
5428.8 Sand m3 0.425 1870 794.75
12364.43 17793.23

Prepared by Checked by Approved by


Bar bending binding cutting placing etc all

23 complete for RCC works mt Skill 12.00 696 8352 Steel mt 1.05 100,788.00 105827.4
Un Skill 12.00 696 8352 B.wire kg 10 113.29 1132.88
16704 106960.28 123664.28 123.66428
24 Roofing Works
a
with 26 swg Coloured C.G. I medium
(0.5mm) sheet
26 swg CGI sheet
1 10m2 Skill 1.10 696 765.6 medium m2 12 636.25 7634.9808
Un Skill 1.25 696 870 8mm nut bult & Nails no 30 31.23 936.9048
1635.6 j hook no 25 22.23 555.754
Bitumin washer no 55 3.67 201.74
9329.3796 10964.9796
2 26 swg Ns Heavy 10m2 Skill 1.10 696 765.6 26 swg Ns Heavy m2 12 636.25 7634.9808
Un Skill 1.25 696 870 8mm nut bult & Nails no 30 31.23 936.9048
1635.6 j hook no 25 22.23 555.754
Bitumin washer no 55 3.67 201.74
9329.3796 10964.9796 1096.498
3 28 swg Ns Heavy 10m2 Skill 1.10 696 765.6 28 swg Ns Heavy m2 12 548.49 6581.83776
Un Skill 1.20 696 835.2 8mm nut bult & Nails Ls 12 31.23 374.76192
1600.8 j hook no 25 22.23 555.754
Bitumin washer no 55 3.67 201.74
7714.09368 9314.89368 931.48937
Rige works with 24 swg coloured plain
24swg coloured plain
4 sheet 10 RM Skill 2.00 696 1392 sheet m 12 554.24 6650.85901
Un Skill 3.00 696 2088 8mm nut bult & Nails no 25 39.00 39.00
3480 6689.85901 10169.859007 1016.9859
24b Roofing works with slate 10m2 Skill 4.00 696 2784 slate m2 24 336 8064
Un Skill 5.00 696 3480 nails Ls 39.00
6264 8103 14367 1436.7
25 Roofing with local khar
ka with 8 cm thick 10m2 Skill 1.50 696 1044 khar bndl 83 7.7 639.1
Un Skill 1.50 696 1044 Bans no 30 320 9600
2088 Dori kg 5 85 425
10664.1 12752.1 1275.21
kha with 15 cm thick 10m2 Skill 1.50 696 1044 khar bndl 166 7.7 1278.2
Un Skill 1.50 696 1044 Bans no 40 320 12800
2088 Dori kg 5 85 425
14503.2 16591.2 1659.12
Roofing works with corrugated fiber glass

25 sheet 10m2 Skill 1.10 696 765.6 12mm Fiber glss sheet m2 12 1,414.80 16977.6

Prepared by Checked by Approved by


Un Skill 1.25 696 870 8mm nut bult & Nails no 30 39.00 1170
1635.6 j hook no 25 22.23 555.754
Bitumin washer no 55 3.67 201.74
18905.094 20540.694 2054.0694
Ridge works for with plain Fiber glass
12mm Plain Fiber
26 sheet 10m2 Skill 2.00 696 1392 glass sheet m2 12 1,414.80 16977.6
Un Skill 3.00 696 2088 8mm nut bult & Nails l/s 39.00
3480 17016.6 20496.6 2049.66
Wood Work for Truss all complete with
27 sal wood m3 Skill 17.65 696 12284.4 sal wood m3 1.05 190512 200037.6
Un Skill 26.00 696 18096 not bolt L/s 30 31.23 936.9048
30380.4 Nails L/s 39.00
Irone plate L/s 150
201163.505 231543.9048
Wood Work for Truss all complete with
28 Local Hard wood m3 Skill 17.65 696 12284.4 Local hard wood m3 1.05 45864 48157.2
Un Skill 26.00 696 18096 not bolt L/s 30 31.23 936.9048
30380.4 Nails L/s 39.00
Irone plate L/s 150
29 Brick Masonary works 49283.1048 79663.5048
1 In 1:3 Cement Mortar M3 Skl 1.50 696 1044 Brick no. 560 21.82 12219.2
M3 Un Skill 2.20 696 1531.2 Sand M3 0.27 1,870.43 505.01664
2575.2 Cement Bag. 2.6 764.40 1987.44
14711.6566 17286.85664
In 1:4 cement Mortar M3 Skl 1.50 696 1044 Brick no. 560 21.82 12219.2
Un Skill 2.20 696 1531.2 sand m3 0.28 1,870.43 523.72096
2575.2 Cement Bag. 2 764.40 1528.8
14271.721 16846.92096
In 1:6 cement Mortar M3 skl 1.50 696 1044 Brick no. 560 21.82 12219.2
Un Skill 2.20 696 1531.2 sand m3 0.3 1870.432 561.1296
2575.2 Cement Bag. 1.4 764.4 1070.16
13850.4896 16425.6896
Brick masonary with all necessary
operations including full compansation
for all labour materials scafolding and
other incidentals required to complete
the specifications and as showm on the
drawings it includes full compecnsation
27 or using specially moulted bricks on the
Aa in 1:3 Mix ratio
Brick masonary m3 skl 1.50 696 1044 Bamboo No 2 320 640
Un Skill 4.00 696 2784 Rope kg 1 85 85
Provding of prepared cement motar
(Annex) 0.30m3 Un Skill 0.72 696 501.12 Brick no 530 21.82 11564.6
Incidents Is Un Skill 0.25 696 174 cement kg 130 15.288 1987.44

Prepared by Checked by Approved by


4503.12 sand m3 0.33 1870.432 617.24256
14894.2826 19397.40256

in 1:4 Mix ratio


Ab Brick masonary m3 skl 1.50 696 1044 Bamboo No 2 320 640
Un Skill 4.00 696 2784 Rope kg 1 85 85
Provding of prepared cement motar
(Annex) 0.30m3 Un Skill 0.74 696 515.04 Brick no 530 21.82 11564.6
Incidents Is Un Skill 0.25 696 174 cement kg 100 15.288 1528.8
4517.04 sand m3 0.33 1870.432 617.24256
14435.6426 18952.68256
Ac In 1:6 Mix ratio
Brick masonary m3 skl 1.50 696 1044 Bamboo No 2 320 640
Un Skill 4.00 696 2784 Rope kg 1 85 85
Provding of prepared cement motar 0.30m3 Un Skill 0.77 696 535.92 Brick no 530 21.82 11564.6
(Annex)
Incidents Is Un Skill 0.25 696 174 cement kg 100 15.288 1528.8
4537.92 sand m3 0.33 1870.432 617.24256
28 Plaster works 14435.6426 18973.56256
A Cement sand Plaster
1a 12.5 mm thick in 1:2 100m2 skl 12.00 696 8352 cement Bag 18 764.4 13759.2
unskl 16.00 696 11136 sand m3 1.22 1870.432 2281.92704
19488 16041.127 35529.12704 355.29127

1b 12.5 mm thick in 1:2 100m2 skl 12.00 696 8352 cement Bag 18 764.4 13759.2
unskl 16.00 696 11136 sand m3 1.22 1870.432 2281.92704
19488 16041.127 35529.12704 355.29127

2a 12.5 mm thick in 1:3 100m2 skl 12.00 696 8352 cement Bag 12.5 764.4 9555
unskl 16.00 696 11136 sand m3 1.28 1870.432 2394.15296
19488 11949.153 31437.15296 314.37153

2b 12.5 mm thick in 1:3 100m2 skl 12.00 696 8352 cement Bag 12.5 764.4 9555
unskl 16.00 696 11136 sand m3 1.28 1870.432 2394.15296
19488 11949.153 31437.15296 314.37153
3a 12.5 mm thick in 1:4 100m2 skl 12.00 696 8352 cement Bag 10.76 764.4 8224.944
unskl 16.00 696 11136 sand m3 1.46 1870.432 2730.83072
19488 10955.7747 30443.77472 304.43775
3b 12.5 mm thick in 1:4 100m2 skl 12.00 696 8352 cement Bag 10.76 764.4 8224.944
unskl 16.00 696 11136 sand m3 1.46 1870.432 2730.83072
19488 10955.7747 30443.77472 304.43775

Prepared by Checked by Approved by


4a 12.5 mm thick in 1:6 100m2 skl 12.00 696 8352 cement Bag 7.64 764.4 5840.016
unskl 16.00 696 11136 sand m3 1.57 1870.432 2936.57824
19488 8776.59424 28264.59424 282.64594
4b 12.5 mm thick in 1:6 100m2 skl 12.00 696 8352 cement Bag 7.64 764.4 5840.016
unskl 16.00 696 11136 sand m3 1.57 1870.432 2936.57824
19488 8776.59424 28264.59424 282.64594
B cement sand Plaster
a 20mm thick in 1:4 100m2 skl 14.00 696 9744 cement Bag 16.2 764.4 12383.28
unskl 19.00 696 13224 sand m3 2.2 1870.432 4114.9504
22968 16498.2304 39466.2304 394.6623
a 20mm thick in 1:4 100m2 skl 14.00 696 9744 cement Bag 16.2 764.4 12383.28
unskl 19.00 696 13224 sand m3 2.2 1870.432 4114.9504
22968 16498.2304 39466.2304 394.6623

b 20mm thick in 1:6 100m2 skl 14.00 696 9744 cement Bag 11.4 764.4 8714.16
unskl 19.00 696 13224 sand m3 2.35 1870.432 4395.5152
22968 13109.6752 36077.6752 360.77675
b 20mm thick in 1:6 100m2 skl 14.00 696 9744 cement Bag 11.4 764.4 8714.16
unskl 19.00 696 13224 sand m3 2.35 1870.432 4395.5152
22968 13109.6752 36077.6752 360.77675

2.5 mm thick mud plaster works all


12 complete 100m2 skl 20.00 696 13920 clay m3 3 276 828
unskl 25.00 696 17400 Bhusa kg 100 4.4 440
31320 Gobar kg 120 4.4 528
1796 33116 331.16
12.5mm thick plasetring with cement sand motar on brick walls or concrete surface with all necessary operations including full

compensation for all labour material scaffolding and other incidents required to complete the works as per the specifications
in 1:2 Mix
Providing of prepared cement motar 1.25m3 unskl 2.94 2046.24 Bamboo No

Annex iii) 696 2 320 640


Plastering 100m2 skl 15 10440 Rope kg
696 1 85 85
unskl 10 6960 cement kg
696 588 15.288 8989.344
incidentals is unskl 0.5 348 sand m3
696 1.25 1870.432 2338.04
19794.24
12052.384 31846.624 318.46624
in 1:3 Mix
Providing of prepared cement motar 1.23m3 unskl 3 2088 Bamboo No
Annex iii) 696 2 320 640
Plastering 100m2 skl 15 696 10440 Rope kg 1 85 85
unskl 10 696 6960 cement kg 463 15.288 7078.344
incidentals is unskl 0.5 696 348 sand m3 1.38 1870.432 2581.19616

Prepared by Checked by Approved by


19836 10384.5402 30220.54016 302.2054

in 1:4 Mix
Providing of prepared cement motar 1.23m3 unskl 3.09 2150.64 Bamboo No
Annex iii) 696 2 320 640
Plastering 100m2 skl 15 696 10440 Rope kg 1 85 85
unskl 10 696 6960 cement kg 363 15.288 5549.544
incidentals is unskl 0.5 696 348 sand m3 1.46 1870.432 2730.83072
19898.64 9005.37472 28904.01472 289.04015

in 1:6 Mix
Providing of prepared cement motar 1.23m3 unskl 3.2 2227.2 Bamboo No
Annex iii) 696 2 320 640
Plastering 100m2 skl 15 696 10440 Rope kg 1 85 85
unskl 10 696 6960 cement kg 288 15.288 4402.944
incidentals is unskl 0.5 696 348 sand m3 1.46 1870.432 2730.83072
696 19975.2 7858.77472 27833.97472 278.33975
29 3mm thick cement Punning 10m2 skl 1 696 696 cement Bag 1.06 764.4 810.264
unskl 1 696 696
1392 2202.264 220.2264
30 Painting Works
1 White wash painting on new surface
one coat 100m2 skl 1.50 696 1044 chuna kg 22 29.40 646.8
unskl 1.70 696 1183.2 Fevicol kg 5 205.29 1026.44
2227.2 1673.24 3900.44 39.0044
twocoat 100m2 skl 1.50 696 1044 chuna kg 22 29.4 646.8
unskl 2.70 696 1879.2 Fevicol kg 5 205.288 1026.44
2923.2 1673.24 4596.44 45.9644
three coat 100m2 skl 3.00 696 2088 chuna kg 32 29.4 940.8
unskl 2.70 696 1879.2 Fevicol kg 5 205.288 1026.44
3967.2 1967.24 5934.44 59.3444
2 Snowcem painting works new surface
one coat 100m2 skl 1.50 696 1044 chuna kg 22 29.4 646.8
unskl 1.70 696 1183.2 Fevicol kg 5 205.288 1026.44
2227.2 1673.24 3900.44 39.0044
twocoat 100m2 skl 2.50 696 1740 chuna kg 22 29.4 646.8
unskl 1.70 696 1183.2 Fevicol kg 5 205.288 1026.44
2923.2 1673.24 4596.44 45.9644
three coat 100m2 skl 2.50 696 1740 chuna kg 32 29.4 940.8
unskl 1.70 696 1183.2 Fevicol kg 5 205.288 1026.44
2923.2 1967.24 4890.44 48.9044
3 White Washing works in old surface 100m2 skl 1.50 696 1044 chuna kg 22 29.4 646.8
unskl 1.70 696 1183.2 Fevicol kg 5 205.288 1026.44
2227.2 1673.24 3900.44 39.0044
4 Distemper Painting
Aster coat 100m2 skl 2.00 696 1392 Aster Liter 8 164.72 1317.776
unskl 1.70 696 1183.2
2575.2 3892.976 38.92976

One coat 100m2 skl 2.00 696 1392 Destemper kg 6.5 164.72 1070.693

Prepared by Checked by Approved by


unskl 3.00 696 2088
3480 4550.693 45.50693
Two Coat and additional 100m2 skl 1.80 696 1252.8 Destemper kg 5 164.722 823.61
unskl 1.80 696 1252.8
2505.6 3329.21 33.2921
5 Water Proof Cement Painting
One coat 100m2 skl 1.70 696 1183.2 W.P Cement Paint kg 30 79.18 2375.4
unskl 2.70 696 1879.2
3062.4 5437.8 54.378
two coat 100m2 skl 5.00 696 3480 W.P Cement Paint kg 48 79.18 3800.64
unskl 5.00 696 3480
6960 10760.64 107.6064
6 Readymade Enamel Paint
Aster coat 100m2 skl 3.00 696 2088 Aster Liter 8.1 164.72 1334.2482
unskl 3.00 696 2088
4176 5510.2482 55.102482
One coat 100m2 skl 5.00 696 3480 Enamel Liter 9 528.29 4754.592
unskl 2.00 696 1392
4872 9626.592 96.26592
Two coat 100m2 skl 4.00 696 2784 Enamel Liter 7 528.288 3698.016
unskl 3.00 696 2088
4872 8570.016 85.70016

Snowcem Painting Works Over Plaster


7 surface
one coat 100m2 skl 3.50 696 2436 snowcem Paint kg 30 79.18 2375.4
unskl 3.50 696 2436
4872 2375.4 7247.4 72.474

two coat 100m2 skl 3.00 696 2088 snowcem Paint kg 20 79.18 1583.6
unskill 3.00 696 2088
4176 1583.6 5759.6 57.596

31 Form Works
1 Wooden form work all complete
For slabs 10m2 skl 1.72 696 1197.12 L wood m3 0.526 29,988.00 15773.688
unskl 2.57 696 1788.72 nails kg 2.5 113.29 283.22
2985.84 16056.908 19042.748 380.85496
2 Wooden form work all complete
a For column all complete 2 m 10m2 skl 1.72 696 1197.12 L wood m3 0.526 29988 15773.688
unskl 2.57 696 1788.72 nails kg 2.5 113.288 283.22
2985.84 16056.908 19042.748 952.1374
b For column all complete 2 m to 3m 10m2 skl 3.00 696 2088 L wood m3 0.526 29988 15773.688
unskl 4.50 696 3132 nails kg 2.5 113.288 283.22
5220 16056.908 21276.908 1063.8454
c For column all complete 2 m to 3m 10m2 skl 2.40 696 1670.4 L wood m3 0.526 29988 15773.688
unskl 3.60 696 2505.6 nails kg 2.5 113.288 283.22
4176 16056.908 20232.908 1011.6454

Prepared by Checked by Approved by


3 Wooden form work all complete
For structural beamall complete h= up to
a 30 cm 10m2 skl 4.00 696 2784 L wood m3 0.53 29988 15893.64
unskl 6.00 696 4176 nails kg 2.5 113.288 283.22
6960 16176.86 23136.86 1156.843
For structural beamall complete h= up 30
b cm to 80cm 10m2 skl 2.67 696 1858.32 L wood m3 0.53 29988 15893.64
skl 4.00 696 2784 nails kg 2.5 113.288 283.22
4642.32 16176.86 20819.18 1040.959
For structural beamall complete h= up
c 800 cm to 1200cm 10m2 skl 2.40 696 1670.4 L wood m3 0.53 29988 15893.64
skl 3.60 696 2505.6 L wood kg 2.5 113.288 283.22
4176 16176.86 20352.86 1017.643
32 Wood Works
wood works for chaukat with local hard
wood m3 skl 34.00 696 23664 Local hard wood m3 1.1 67032 73735.2
unskl 3.40 696 2366.4 Hold fast no 92 41.32 3800.9984
26030.4 60mm screw no 184 0.80 147.2
77536.1984 103566.5984
wood works for chaukat with sal wood m3 skl 34.00 696 23664 sal wood m3 1.1 193,216.06 212537.667
unskl 3.40 696 2366.4 Hold fast no 92 41.32 3800.9984
26030.4 60mm screw no 184 0.80 147.2
216338.665 242369.06528
38mm thick framed (panel)shutter with
33 local hard wood
1.07m*1.982m=2.114m2 2.114m2 skl 10.00 696 6960 Local hard wood m3 0.084 67032 5630.688
unskl 1.00 696 696 kabja no 6 19.04 114.2592
7656 150mmchheskini no 1 34 34
250mm locaing set no 1 276.29 276.288
handele no 2 23.92 47.84
300mm chheskini no 1 0
6103.0752 13759.0752 6508.5502
Packing and Filling of Gabion cretes with
34 dry stone ( Near River Bed ) m3 skl 0.30 696 208.8 stone m3 1.1 974.4 1071.84
unskl 0.75 696 522
730.8 1802.64

Packing and Filling of Gabion cretes with


dry stone m3 skl 0.30 696 208.8 stone m3 1.1 1320.00 1452
uskl 0.75 696 522
730.8 2182.8
Machine Made heavy coated Gabion Box
35 a
Box Size 1*1*1 B0x 1788.91
Box Size 4*1*1 B0x 6195.43
Box Size 3*1*1 B0x 4762.98
Box Size 2*1*1 B0x 3281.94
Box Size 3*1*0.5 B0x 3242.49

Prepared by Checked by Approved by


Box Size 3*1*0.3 B0x 2642.18
Box Size 2*1*0.5 B0x 2218.26
Box Size 1.5*1*1 B0x 2681.64

Laying fitting and fixing of humpe pipe


36 having a length of 1m or more
36.a For one or first
pipe having 300mm diameter m unskl 0.15 696 104.4 300mmHumpe pipe m 1 3375 3375 3479.4
pipe having 600mm diameter m unskl 0.25 696 174 600mmHumpe pipe m 1 6625 6625 6799
pipe having 900mm diameter m unskl 0.35 696 243.6 900mmHumpe pipe m 1 11500 11500 11743.6
For every subsequent pipe having a
36.b length of minimum 1m
pipe having 300mm diameter
Laying of pipe inculding collecting sand at
quarry site m skl 0.02 696 13.92 cement kg 1 15.288 15.288
unskl 0.10 696 69.6 Jute kg 1 75 75
Humpe pipe rm 1 3375 3375
Bitumen kg 0.2 83.45 16.69
83.52 3481.978 3565.498

pipe having 600mm diameter


Laying of pipe inculding collecting sand at
quarry site m skl 0.05 696.00 34.8 cement kg 1 15.288 15.288
unskl 0.20 696.00 139.2 Jute kg 1 75 75
unskl 0.01 696.00 6.96 Humpe pipe rm 1 6625 6625
Bitumen kg 0.2 83.45 16.69
180.96 6731.978 6912.938

pipe having 900mm diameter


Laying of pipe inculding collecting sand at
quarry site m skl 0.16 696.00 111.36 cement kg 1 15.288 15.288
unskl 0.50 696.00 348 Jute kg 1 75 75
unskl 0.01 696.00 6.96 Humpe pipe rm 1 11875 11875
Bitumen kg 0.2 83.45 16.69
459.36 11981.978 12441.338
4 mm thick ply wood fixing work with wooden listies.
m Skilled 0.06 696.00 41.76 Ply wood 4 mm thick commercial sqm 1.05 248.29 260.70
Unskilled 0.01 696.00 4.18 Wooden listies 1" sqm 4.05 47.00 190.35
नोट 45.94 Killas kg 0.10 113.00 11.30
462.35 508.29