A. PRELIMINERIES
1 Mobilization of all personels, required equipment and materials to Plant PT.KRN ls 1.00 - - - - -
Subtotal A 1.00 -
2 Apply Epoxy Acid Resistant for Interior Basin (brand Mapei) 4000 mikron (Slab & Wall)
Subtotal B -
2 Apply Epoxy Acid Resistant for Interior Basin (brand Mapei) 4000 mikron (Slab & Wall)
Subtotal C -
2 Apply Epoxy Acid Resistant for Interior Basin (brand Mapei) 4000 mikron (Slab & Wall)
Subtotal D -
b Formwork m2 3.15 - - - -
4 Apply Epoxy Acid Resistant for Interior Basin (brand Mapei) 4000 mikron (Slab & Wall)
5 Perimeter Bundwall
a Sloof 15x20
- Reinforcement kg 98.86 - - - -
- Formwork m2 8.40 - - - -
b Column 15x15
- Reinforcement kg 19.90 - - - -
- Formwork m2 2.52 - - - -
- Reinforcement kg 93.30 - - - -
- Formwork m2 6.30 - - - -
e Plastered m2 21.00 - - - -
Subtotal E -
UNIT PRICE (Rp.) AMOUNT
NO. ITEM OF WORK UNIT Quantity REMARK
Material Labor Total Material Labor Total
b Formwork m2 2.55 - - - -
4 Apply Epoxy Acid Resistant for Interior Basin (brand Mapei) 4000 mikron (Slab & Wall)
5 Perimeter Bundwall
a Sloof 15x20
- Reinforcement kg 80.16 - - - -
- Formwork m2 6.80 - - - -
b Column 15x15
- Reinforcement kg 17.06 - - - -
- Formwork m2 1.80 - - - -
- Reinforcement kg 75.65 - - - -
- Formwork m2 5.10 - - - -
e Plastered m2 6.80 - - - -
Subtotal F -
UNIT PRICE (Rp.) AMOUNT
NO. ITEM OF WORK UNIT Quantity REMARK
Material Labor Total Material Labor Total
GRANDTOTAL -
BILL OF QUANTITY
Repair Concrete & Apply Epoxy Coating to FAME Tanks Area Phase 1 LOCATION : Area of FAME Tank Phase 1
UNIT RATE
UNIT RATE UNIT RATE
NO DESCRIPTION QTY UNIT MATERIAL+MANP TOTAL COST (Rp)
MATERIAL (Rp) MANPOWER (Rp)
OWER (Rp)
a b c d = (b+c) f = (a x d)
I PRELIMINARIES
1 Housekeeping 1 Ls - -
TOTAL I -
ROUND -
Say:
Page 5 of 9
PROJECT NAME : KAIZEN WASTE MANAGEMENT
SCOPE OF WORK : CIVIL WORK FOR MELTING TANK
LOCATION : BALIK PAPAN - KALIMANTAN TIMUR - KALIMANTAN - INDONESIA
CLIENT : PT. KUTAI REFINERY NUSANTARA
DEPARTMENT : LOGISTIC
A. PRELIMINERIES
1 Housekeeping before and after work ls 1.00 - - - - -
2 Mobilization & demobilization ls 1.00 - - - - -
Subtotal A - -
Subtotal B -
Subtotal C -
D PUMP FOUNDATION
1 Compaction m2 2.00 - - - -
2 Sandfill thk 7.5cm m3 0.15 - - - -
3 Lean Concrete 5cm thk m3 0.10 - - - -
4 Foundation Pump
a Concrete m3 0.80 - - - -
b Wiremesh M8-150 2 layer m2 4.00 - - - -
c Formwork m2 1.20 - - - -
Subtotal D -
E CANOPY
1 Provide & Install Hollow 75x75x2.7mm kg 89.42 - - - -
2 Provide & Install Hollow 60x60x2.7mm kg 126.16 - - - -
3 Provide & Install Hollow 40x40x2.7mm kg 477.73 - - - -
4 Provide & Install Base plate thk. 10mm kg 19.42 - - - -
5 Provide & Install Anchor bolt M12 unit 36.00 - - - -
6 Provide & Install Zincalume Roof thk. 0.5mm m2 30.24 - - - -
7 Provide & Install Cladding Zincalume thk. 0.4mm m2 56.62 - - - -
Subtotal E -
GRANDTOTAL -
BILL OF QUANTITY
Painting Tank-Climbing Method
Date : June 06th 2023
EST. UNIT RATE EST.UNIT RATE TOTAL UNIT RATE
NO DESCRIPTION QTY UNIT SPECIFICATION MATERIAL (Rp) MANPOWER (Rp) (Rp) TOTAL COST (Rp)
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 6,709.93 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 206.28 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL A -
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 1,862.29 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 88.43 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL B -
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 1,524.00 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 88.43 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL C -
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 5,367.94 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 165.02 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL D -
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 1,832.94 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 68.38 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL E -
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 2,085.18 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 77.80 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL F -
4 Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 114.29 m2 Jotun - -
b. Painting jotamastic 80 primer 100 micron, topcoat hardtop XP 80 micron 11.78 m2 Jotun - -
- Jotun RAL 1023 (yellow) for handrail, Jotun RAL 9006 (grey) for stairs
TOTAL G
-
GRAND TOTAL -
ROUND -
Say: -
PROJECT NAME : ACCESS PLATFORM JETTY 2
SCOPE OF WORK : ACCESS PLATFORM TO HANDLING BARGE/PONTOON
LOCATION : BALIK PAPAN - KALIMANTAN TIMUR - KALIMANTAN - INDONESIA
CLIENT : PT. KUTAI REFINERY NUSANTARA
DEPARTMENT : SCM - INBOUND
A. PRELIMINERIES
1 Mobilization of all personel plants, crane and any other required equipment and materials ls 1.00 - include - - include -
to carry out the work and to maintenance them till job complation. - - - - - -
Provide a performance bond for a sum not exceeding five percent ( 5 %) of the contractsum as spesifield in
2 ls 1.00 - include - - include -
the contract document.
Provide two Insurance as follows :
Contractor's all risks insurance policy ls 1.00 - include - - include -
3 Workman's Compensation ls 1.00 - include - - include -
To include expence (provision ) necessary to produce a Bank guarantee as a counter for advance
ls 1.00 - include - - include -
payment .
4 Provide and mainten for the use of the contractor of works and client & consultant kind of safety helmets ls 1.00 - include - - include -
and pairs of safety glass, welding gloves, full body harness of the assorted sizes as required, scaffolding
standard ,
safety net , fire blangket, fire extinguisher
5 Establish and maintain during the entier period of stay at site contractor all temporary ls 1.00 - include - - include -
facilities such us office, workshop, fabrication area, store, sanitar facilities, act.
Site meeting, Progress reports and work Programe:
6 A.The contractor shall arrange and attent site meeting at fortnigtly or at interval AS directed by engineer . ls 1.00 - include - - include -
B. The contractor shall supply and maintenance accurate written record of daily progrees of works on other
ls 1.00 - include - - include -
particulars an information related to the works.
C. Prepare, maintain, modify as and when required and submit to the Engineer for approval a detailed time
ls 1.00 - include - - include -
schedule and progress chart to the work.
7 Demobilization of all personnel,plant and equipment and materials ls 1.00 - include - - include -
upon completion of the works,with the approval from the Engineer.
Removal of all contractor's temporary facilities after completion ls 1.00 - include - - include -
of the work and make the complete area clean before leaving
the site,with the approval from the Engineer.
To provide Medical facilities (First Aid) throughout the construction period. ls 1.00 - include - - include -
8 Shop Drawing and as built drawing. ls 1.00 - include - - include -
9 Setting Out / Blowplank ls 1.00 - include - - include -
Subtotal A 1.00 - - -
Subtotal B -
GRANDTOTAL -