Status
Inspection for Ceramic Walls for
GROUND floor at main building C - Revise
between Axis (A-G/1-7) at site 04 and
BEC-EPC-SC04-QCA-ARC-WIR-000065 SC 04 as per attached drawings SC04 Resubmit
Final inspection for porcelain for
THIRD floor at main building at site C - Revise
(04) SC. 04 as per attached and
BEC-EPC-SC04-QCA-ARC-WIR-000095 drawings SC04 Resubmit
Inspection for installation
Threshold for Third Floor at Main C - Revise
Building at site (04) SC.04 as per and
BEC-EPC-SC04-QCA-ARC-WIR-000101 attached drawings SC04 Resubmit