You are on page 1of 5

Document No Title School No.

Status
Inspection for Ceramic Walls for
GROUND floor at main building C - Revise
between Axis (A-G/1-7) at site 04 and
BEC-EPC-SC04-QCA-ARC-WIR-000065 SC 04 as per attached drawings SC04 Resubmit
Final inspection for porcelain for
THIRD floor at main building at site C - Revise
(04) SC. 04 as per attached and
BEC-EPC-SC04-QCA-ARC-WIR-000095 drawings SC04 Resubmit
Inspection for installation
Threshold for Third Floor at Main C - Revise
Building at site (04) SC.04 as per and
BEC-EPC-SC04-QCA-ARC-WIR-000101 attached drawings SC04 Resubmit

Inspection for Ceramic Floor for


Wet Areas at Ground floor Of Main
Building between Axis (1-2/A-B
and 5-6/F-G )at (Site 04) School C - Revise
NO. (SC04) as per attached and
BEC-EPC-SC04-QCA-ARC-WIR-000140 drawing. SC04 Resubmit
Inspection for (Frame Only For Fix
Window - W1-W4) at(Ground
Floor) of MPH Building Between C - Revise
Axis (A-E/1-6) at Site 04 SC 04 as and
BEC-EPC-SC04-QCA-ARC-WIR-000154 per attached drawings. SC04 Resubmit
Inspection for (Frame Only For Fix
Window - W3) at(Roof Floor) of
MPH Building Between Axis C - Revise
(A-E/1-6) at Site 04 SC 04 as per and
BEC-EPC-SC04-QCA-ARC-WIR-000155 attached drawings. SC04 Resubmit
Inspection for (Frame Only For Fix
Window - W1-W9-W9A) at(Ground
Floor) of Main Building Between C - Revise
Axis (A-G/1-7) at Site 04 SC 04 as and
BEC-EPC-SC04-QCA-ARC-WIR-000156 per attached drawings. SC04 Resubmit
inspection for first fix of false C - Revise
ceiling for 3rd floor at Main building and
BEC-EPC-SC04-QCA-ARC-WIR-000169 for Site 04 SC04 SC04 Resubmit
Inspection for Ceramic tiles for
flooring works for GROUND floor
at main building between Axis (A- C - Revise
G/1-7) at site 05 SC 05 as per and
BEC-EPC-SC05-QCA-ARC-WIR-000175 attached drawings SC05 Resubmit
Inspection for Ceramic tiles for
flooring works for FIRST floor at
main building between Axis C - Revise
(A-G/1-7) at site 05 SC 05 as per and
BEC-EPC-SC05-QCA-ARC-WIR-000176 attached drawings SC05 Resubmit
Inspection for Ceramic tiles for
flooring works for SECOND floor at
main building between Axis C - Revise
(A-G/1-7) at site 05 SC 05 as per and
BEC-EPC-SC05-QCA-ARC-WIR-000177 attached drawings SC05 Resubmit
Installation of drain pipes for FAHU
EXTERNAL UNITS in main
building at SITE08 SCHOOL 08 – C - Revise
(MB08) at roof floor as per and
BEC-EPC-SC08-QCA-HVC-WIR-000064 attached drawings. SC08 Resubmit

INSTALLATION of Exhaust Fan at


guard complex at site #08 school C - Revise
#08 AT Ground FLOOR as per the and
BEC-EPC-SC08-QCA-HVC-WIR-000066 attached highlighted drawings SC08 Resubmit
Leak test of Duct for main building
at Site #08 School No. SC08 at C - Revise
roof floor As per the attached and
BEC-EPC-SC08-QCA-HVC-WIR-000068 drawings. SC08 Resubmit
Installation of INDOOR UNIT in
Multi-purpose hall at SITE08 C - Revise
SCHOOL 08 – (MH08) at ground and
BEC-EPC-SC08-QCA-HVC-WIR-000069 floor as per attached drawings. SC08 Resubmit

Installation of Duct for Multi-


purpose hall at Site #08 School
No. SC08 Ground floor Except fire
dampers, VAV, riser connection C - Revise
and plenum boxes as per the and
BEC-EPC-SC08-QCA-HVC-WIR-000071 attached drawing. SC08 Resubmit

LEAK TEST of Duct for Multi-


purpose hall at Site #08 School
No. SC08 Ground floor Except fire
dampers, VAV, riser connection C - Revise
and plenum boxes as per the and
BEC-EPC-SC08-QCA-HVC-WIR-000072 attached drawing. SC08 Resubmit
INSTALLATION of Duct
THERMAL INSULATION for Multi-
purpose hall at Site #08 School
No. SC08 Ground floor Except fire
dampers, VAV, riser connection C - Revise
and plenum boxes as per the and
BEC-EPC-SC08-QCA-HVC-WIR-000073 attached drawing. SC08 Resubmit
Installation of PLENUM BOXES for
Multi-purpose hall at Site #08 C - Revise
School No. SC08 at Ground floor and
BEC-EPC-SC08-QCA-HVC-WIR-000074 as per the attached drawing. SC08 Resubmit
Installation and welding for AC
pipes in main building for site #08 C - Revise
school no.08 at Roof floor As per and
BEC-EPC-SC08-QCA-HVC-WIR-000075 attached drawings SC08 Resubmit
Nitrogen pressure test for AC
pipes in main building for site #08 C - Revise
school no.08 at Roof floor As per and
BEC-EPC-SC08-QCA-HVC-WIR-000076 attached drawings. SC08 Resubmit
Installation and welding for AC
pipes in Multi-purpose hall for site C - Revise
#08 school no.08 at Roof floor As and
BEC-EPC-SC08-QCA-HVC-WIR-000080 per attached drawings SC08 Resubmit
Nitrogen pressure test for AC
pipes in Multi-purpose hall for site C - Revise
#08 school no.08 at Roof floor As and
BEC-EPC-SC08-QCA-HVC-WIR-000081 per attached drawings. SC08 Resubmit
Installation of drain pipes for fan
coil system in Multi-purpose hall at
SITE08 SCHOOL 08 – (MH08) at C - Revise
roof floor as per attached and
BEC-EPC-SC08-QCA-HVC-WIR-000082 drawings. SC08 Resubmit
Leak test of drain pipes for fan coil
system in Multi-purpose hall at
SITE08 SCHOOL 08 – (MH08) at C - Revise
roof floor as per attached and
BEC-EPC-SC08-QCA-HVC-WIR-000083 drawings. SC08 Resubmit
Installation for water supply
DRINKING FOUNTAIN in main C - Revise
building AT All floor at SITE08 and
BEC-EPC-SC08-QCA-PLU-WIR-000064 SCHOOL 08 – (MB08) SC08 Resubmit
Installation for underground
Sewage manhole & gully trap
chamber at SITE08 SCHOOL 08 – C - Revise
(MB08) as per the attached and
BEC-EPC-SC08-QCA-PLU-WIR-000065 drawings. SC08 Resubmit
Installation for underground
Sewage manhole & gully trap
chamber at SITE09 SCHOOL 09 – C - Revise
(MB09) as per the attached and
BEC-EPC-SC09-QCA-PLU-WIR-000064 drawings. SC09 Resubmit

External Surface Preparation With


Primer For Walls at Elevation (1-2- C - Revise
3-4-5-6) between Axis (A-E/1-6)-at and
BEC-EPC-SC20-QCA-ARC-WIR-000118 Main Building at Site 18 SC 20 SC20 Resubmit
External Painting works For Walls
at Elevation (1-2-3-4-5-6) between C - Revise
Axis (A-E/1-6)-at Main Building at and
BEC-EPC-SC20-QCA-ARC-WIR-000119 Site 18 SC 20 SC20 Resubmit
Completion of the milestone
Concrete Screed for Underground C - Revise
Floor at (GUARD COMPLEX and
BEC-EPC-SC31-QCA-GEN-WIR-000060 Building) for site 23 SC31. SC31 Resubmit
External plaster for Roof floor at C - Revise
Main Building at Site 27 SC 39 as and
BEC-EPC-SC39-QCA-ARC-WIR-000046 per attached drawings SC39 Resubmit
Installation of Hollow core For
ROOF Floor between Axis (C-E/3-
5) at Main Building at (Site 27) C - Revise
School NO. (SC39) as per and
BEC-EPC-SC39-QCA-STR-WIR-000228 attached Drawing SC39 Resubmit
Completion of Internal Plaster C - Revise
Works for Third Floor (Main and
BEC-EPC-SC45-QCA-GEN-WIR-000093 Building) for Site 31 SC45. SC45 Resubmit
First Layer Block at Second Floor
between Axis (A-G/1-7) at main C - Revise
Building at Site 34 SC 49 as per and
BEC-EPC-SC49-QCA-ARC-WIR-000013 attached drawing. SC49 Resubmit
Rejection root cause