You are on page 1of 20

PIU - DGWR - MPWH Volume 4 – Bill of Qua

Warsamson Dam Porject - West Papua


Bidding Documents
Bill No. 11 - HYDROMECHANICAL INSTALLATION AND ASSOCIATED WORKS

Item Description Unit Quantity

Design, fabricate, deliver to site, install, testing and commisioning and


maintenance of the all hydromechanical installations and inclusive of all
ancillary equipment, including command and control system, electrical
system and installation and other associated works, all in accordance
with Section 14 of the Specification, Volume 2 and as shown on the
Drawings and performing the required functions, of the following

11.1 Diversion Tunnels 1 & 2 Bulkhead Gates


DT-1 & 2 Bulkhead sections with guide rollers,
set 2
seals and filling valves complete in all respects
DT-1 Bulkhead gate side, top and bottom 1 st & 2nd
set 1
stage embedded parts
DT-2 Bulhead Gate side, top and bottom 1 st & 2nd
set 1
stage embedded parts
Semi automatic lifting beam No. 1
Sub-Total
11.2 Power Intake Gates and Hoists
Fixed Wheel Gates with wheels, guide rollers, and
sets 3
seals complete in all respects
Gate side, top and bottom 1 st & 2nd stage
sets 3
embedded parts
Gates hydraulic hoisting system including hydraulic
power unit, hydraulic cylinders, all piping, Sets 3
supporting frames and all allied equipment etc
Wheel mounted electrical driven oil transfer pump set 1
Two wheeled cart set 1
Testing and refilling units of nitrogen sets 2
Sub-Total
11.3 Power Intake Maintenance Gates
Steel made slide gate type stoplog, guide rollers,
and seals complete in all respects. Each set is sets 3
comprised on two Segments.
Stoplog maintenance Gates side, top and bottom
sets 3
1st & 2nd stage embedded parts
Semi automatic lifting beam set 1
Sub-Total
11.4 Trashracks
Power Intake Trashrack comrises each set with
sets 3
three No. of Panels
Power Intake Trashrack guide plates, side and
sets 3
bottom embedded parts
Lifting Beam No. 1
Raw Water Pipe Trashrack comrises one No. of
Set 1
Panel
Raw Water Pipe Trashrack guide plates, side and
Lot 1
bottom embedded parts
Sub-Total
11.5 Power Intake Trashrack cleaning machine
Trashrack cleaning machine set 1
Hydraulic jib hoist with grab bucket set 1
Trash collecting trolley No. 1
Sub-Total
11.6 Low Level Outlet Radial Gates
Radial gates with arms, seals, guide rollers and
sets 3
trunnion assemblies complete in all respects
Radial gates top, side and bottom 1 st & 2nd stage
sets 3
embedded parts
Hydraulic hoisting system including hydraulic
cylinders, hydraulic power units, piping, supporting sets 3
frames and all allied equipment etc
Wheel mounted electrical driven transfer pump set 1
Two wheeled cart set 1
Testing and refilling units of nitrogen set 2
Sub-Total
11.7 Low Level Outlet Stoplogs
Stoplogs elements with guide rollers and seals with
storage arrangement complete in all respects. sets 3
Each set is comprised on three Segments.
Stoplog guide side, bottom and top 1 st & 2nd stage
sets 3
embedded parts for all three panels
Semi Automatic Lifting Beam No. 1
LLO filling pipes and valve arrangement for 3 No.
Sets 3
of segments
Sub-Total
11.8 Power Intake Gantry Crane
Gantry Crane set 1
Crane girders with embedded parts and fixings set 1
All remaining parts of bridge crane set 1
Sub-Total
11.9 Raw Water Intake Stoplogs
Steel made slide gate type stoplog, guide rollers,
sets 1
and seals complete in all respects
Stoplog maintenance Gates side, top and bottom
sets 1
1st & 2nd stage embedded parts
Semi automatic lifting beam set 1
11.10 Raw Water Intake Gate and Hoists
Fixed Wheel Gates with wheels, guide rollers, and
sets 1
seals complete in all respects
Gate side, top and bottom 1 st & 2nd stage
sets 1
embedded parts
Gates hydraulic hoisting system including hydraulic
power unit, hydraulic cylinders, all piping, Sets 1
supporting frames and all allied equipment etc
Wheel mounted electrical driven oil transfer pump set 1
Two wheeled cart set 1
Testing and refilling units of nitrogen sets 2
11.11 Mobile Crane with Truck Trailer
Mobile crane set 1
Truck trailer set 1
Sub-Total
11.12 Penstocks
Steel Penstock Starts downstream of Intake
Gate.Diameter varies from 4m to 3m) thickness
varies from 13 mm to 11mm) inclusive of reducers, LS 1
drain pipes and valves, coatings,hydrostatic testing
etc.
300mm dia. hot dipped galvanised steel vent pipe
of 4mm thick inclusive of fittings for LLO, Power LS 1
Intake and Raw Water Intakes
Penstock Interfaces and Connections LS 1
Measuring Equipment LS 1

Sub-Total
Volume 4 – Bill of Quantities for Package -1
and Price Schedules for Package-2 Works
Part A – Bill of Quantities for Package-1

Unit Price Amount

IDR IDR
PIU - DGWR - MPWH
Warsamson Dam Porject - West Papua
Bidding Documents
Bill No. 13 - GATE CONTROL SYSTEM, ELECTRICAL AND TELECOMUNICATION SYSTEM

Item Description Unit

Design, Furnishing and Installation, Testing, Commissioning and Maintenance of Gate Control S
installations, lighting, power and telecommunication for the following, all in accordance with Sec
Specification Section 16 (permamnent electrical installations and telecommunication) of the Spe
shown on the Drawings

GATE CONTROL SYSTEM

13.1 Power Intake Transformers


Step-Down Transformer (11/0.4), Dry Type, 500kVA for
Power supplying to different hoists and other gates Nos.
electrical devices
Earthing Arrangement Lot
Other equipment required for a complete and proper
Lot
functioning.
Sub-Total
13.2 LV Switchgear
13.2.1 Power Intake Control Building
Intake LV (0.4 kV) Board, Double Bus-bar with sectionalizer
breaker (incl. Circuit Breakers, contactors, load break
switches, Earth switches, Current Transformers, Voltage Nos.
Transformers, Protection Relays , meters, transducers,
pushbuttons and switches etc.)
Earthing Equipment Lot
Other equipment required for a complete and proper
Lot
functioning.
Sub-Total
13.2.2 Low Level Outlet Control Building
Intake LV (0.4 kV) Board, Single Bus-bar (incl. Circuit
Breakers, contactors, load break switches, Earth switches,
Current Transformers, Voltage Transformers, Protection Nos.
Relays , meters, transducers, pushbuttons and switches
etc.)
Earthing Equipment Lot
Other equipment required for a complete and proper
Lot
functioning.

Sub-Total

13.2.3 Raw Water Control Building


Intake LV (0.4 kV) Board, Single Bus-bar (incl. Circuit
Breakers, contactors, load break switches, Earth switches,
Current Transformers, Voltage Transformers, Protection Nos.
Relays , meters, transducers, pushbuttons and switches
etc.)
Earthing Equipment Lot
Other equipment required for a complete and proper
Lot
functioning.
Sub-Total
13.3 Control & Instrumentation
13.3.1 Power Intake Gates
Common Control System Lot
Local control panels Lot
Common Control Instrumentation Lot
Provision of all necessary equipment to show gate open
and close position at gate local control panel and main Lot
control room of powerhouse.
All necessary field instruments, sensors, adopters,
Lot
instrument cables and transmitters etc. as specified
Fibre optics cables, terminations and other network
Lot
interfaces devices as specified
Sub-Total
13.3.2 Low Level Outlet Gates
Common Control System Lot
Local control panels Lot
Common Control Instrumentation Lot
Provision of all necessary equipment to show gate open
and close position at gate local control panel and main Lot
control room of powerhouse.
All necessary field instruments, sensors, adopters,
Lot
instrument cables and transmitters etc. as specified
Fibre optics cables, terminations and other network
Lot
interfaces devices as specified
Sub-Total
13.3.3 Raw Water Supply Gate
Common Control System Lot
Local control panels Lot
Common Control Instrumentation Lot
Provision of all necessary equipment to show gate open
and close position at gate local control panel and main Lot
control room of powerhouse.
All necessary field instruments, sensors, adopters,
Lot
instrument cables and transmitters etc. as specified
Fibre optics cables, terminations and other network
Lot
interfaces devices as specified
Sub-Total

13.4 Protection and Relay Equipment


Generator Protection complete Lot
Step-Down Transformers (500kVA) Protection complete Lot
Other equipment required for a complete and proper
Lot
functioning.
Sub-Total
Permanent Electrical Installations, Lighting, Power and Telecommunication
13.4 Power Intake Transformers for Provate and Public Zone Buildings
500kVA, 11/0.4 kV, Dyn11, Dry Type, Step-Down Transformer for
2.1 Residential and commercial buildings Power supply complete with Nos.
associated components.
2.2 Earthing Arrangement Lot
2.3 Other equipment required for a complete and proper functioning. Lot
13.4 Lighting and Small Power System
Power Intake, Low Level and Raw water supply gates
Control Buildings Lighting, dam crest road on both sides, Lot
buildings in the private and the public zones
Distribution boards Lot
Circuit breakers (MCCB, MCB) each type and rating,
Lot
Switches, sockets each type and rating etc.
Other equipment required for a complete and proper
Lot
functioning.
Sub-Total
13.5 Earthing and Lightning Protection System
Embedded earthing mesh (electrode) and Lightning
Lot
arresters
Above-ground earthing connections Lot
Other equipment required for a complete and proper
Lot
functioning as per specification.
Sub-Total
13.6 Emergency Diesel Generator
Power Intake
Diesel Generator (250 KVA) complete with cabling and
Set
associated components.
Oil Tank (at least 36 hours operation at 100% rated
capacity of EDG) with transfer pumps and pipe work Set
complete for Powerhouse.
Protection, Control & Instrumentation and synchronization
Set
equipment
13.7 Cables
13.7.1 11kV MV Cables
Three core cables from Powerhouse to Intake under ground
cable complete with termination kits, cable glands, clamps Lot
etc as per specification.
13.7.2 LV Power Cables
400 V AC Cables Lot
220 V DC Cables Lot
Communication, control and instrument cables Lot
Material for supporting, laying, protecting, fixing and
Lot
terminating of the cables and the underground cables
Sub-Total
13.8 CCTV System
Fixed IP Day/Night Color Camera Lot
Pan/Tilt/Zoom (PTZ) IP Day/Night Color Doom Camera Lot
Network Video Recorder (NVR) with server, Monitor,
Lot
Software license
Camera Mounting Structure Lot
LCD Monitor (32") Nos.
Cables Lot
Sub-Total
13.9 Telecommunication system including UPVC/GI ducting, deep
pits, external telephone cable in "UPVC encased in concrete",
distribution panels, key phone, internal telephone cable, Lot
concealed conduit, trunking, telephone points and telephone
units, underfloor trunking works earthing, etc. for the following :-
a) Private Zone
b) Public Zone
c) Control Bulidings for the LLO Gates and PI
13.10 Air conditioning split units including refrigated pipes, starter,
brackets and support, control panel c/w power, control cabling Lot
and all associated works for the followings :-
a) Administration Building
b) Control Buildings
13.11 Duty and standby pumpset inside the existing pump house
(constructed by others) for the domestic water supply system
inclusive of instrumentation, relay, electrodes, control cabling,
control panel, power and all piping works, suction and discharge
headers, valves, specials fittings, pipe supports, anchor blocks,
accessories and all associated works. For the section line, the
pipeworks shall include all the pipeworks from limit as shown on Lot
Drawings to the pumpsets For the delivery line, the pipeworks
shall include all pipeworks from pumpsets to the centre line of
perimeter drain inclusive of the surge anticipator valve and
necessary piping from the limit as shown on Drawings

13.12 Emergency light inclusive of bracket, support, wiring from nearest


lighting point and all associated works for the following :- Lot

a) Private Zone
b) Public Zone
c) Control Bulidings
13.13 KELUAR sign inclusive of bracket, support, wiring from nearest
lighting point and all associated works for the following :-
Lot
a) Private Zone
b) Public Zone
13.14 ABC 9kg dry powder fire extinguisher inclusive of bracket,
support and necessary works for the followings :-
Lot
a) Private Zone
b) Public Zone
c) Control Bulidings
13.15 CO2 2.27 kg dry powder fire extinguisher inclusive of bracket,
support and necessary works for the followings :-
Lot
a) Private Zone
b) Public Zone
c) Control Bulidings
13.16 Carbon Dioxide Total Flooding system complete with storage
cylinders, gas, detectors, schedule 80 of pipeworks, discharge
nozzles, valve assembly, pilot cylinder, solenoid valve, control Lot
panel and cablings, bell, battery, warning lights and all
associated works for the following:-
a) Private Zone
b) Public Zone
c) Control Bulidings
13.17 Provisional Sum
In the event the works are carried out directly by the relevant
Agencies or Authorities, the following Provisional Sum items may
be substantially or entirely omitted and the Contractor shall not
be entitled to any claim for profit and attendance and
compensations
a) Allow provisional sum for the installation of coming cable, PS
transformers, switchgears and other works as may be directed by
Engineer.
b) Allow provisional sum for connecting to Telekom's manhole PS
c) Allow provisional sum of for security ligthing PS
13.18 Any other works not described but contingently and necessary to L.S
complete the works as per Specification and Tender Drawings
( Tendere to itemised the works below )
TOTAL FOR
(Carried to summary of BOQ FO
Volume 4 – Bill of Quantities for Package -1
and Price Schedules for Package-2 Works
Part A – Bill of Quantities for Package-1
ICATION SYSTEM

Unit Price Amount


Quantity
IDR IDR
aintenance of Gate Control System, permanent electrical
g, all in accordance with Section 16A (gate control systems) and
lecommunication) of the Specification ( Vol.2 - Part 2 of 2 ) and

1
1
Sub-Total

1
1
Sub-Total

1
1

Sub-Total
1

1
1
Sub-Total

1
1
1

1
Sub-Total

1
1
1

1
Sub-Total

1
1
1

1
Sub-Total

1
1
1
Sub-Total
unication

1
1

1
1

1
Sub-Total

1
1
1
Sub-Total

1
1

1
1
1
1
Sub-Total

26
8
4
35
2
1
Sub-Total

1
1

1
TOTAL FOR BILL NO.13
ed to summary of BOQ FOR Package-13