You are on page 1of 1

ZAMBOANGA L1

FH DN100 VB FH DN150 LEGEND

MFH
DN100

STEEL MAST
DN100

DN150
BAY 71 BAY 72 BAY 73 36 FH

STEEL MAST
CT-RSC2 CT-RSC2

THYRISTOR & CONTROL


BLDG.
PANTRY/GENSET/AUXILIARY
CHB SECLUSION FENCE

WATER TANK
ELEVATED

DN150
CT-SS4S
CT-SS2S

BUS
BUS
BUS
PI
CT-RSC2 CT-RSC2
GROUTED ROCKWALL

DN100
VB DN150

STEEL MOST
pump house

VB
GENSET HOUSE

TELECOM FH

ZAMBOANGA L1
DN150 NEW 5m ROADWAY DN150
RAMP UP

PIPE SLEEVE PIPE SLEEVE SHELTER

COMMUNICATION
DN100 L=41.4M FH GV
RAMP
UP

TOWER
DN100 L=15M
AUXILIARY BUILDING

Steel Tower

Basic Body
Type DD
RAMP UP

CT-RSC
CT-RSC
CT-RSC2 CT-RSC2

CONTROL HOUSE
DN100
DN100 L=30M

RAMP UP

CONCRETE PAVEMENT 13.8kV METERING EQUIPMENT

DN150
NO.1
RAMP UP

MRF

FLAGPOLE
MH

EXPANSION

NO.2
EXISTING WAREHOUSE

FUTURE

CT-DS4S CT-DS4S
BLDG.
CTRL.

APPROVED NOTED/INFO/REFERENCE
15kV XLPE CABLE

FH
AWCI RETURNED W/O ACTION
CT-DS4S

50 100

CABLE SUPPORT
FH
VB

CABLE SUPPORT

RFC FOR CONSTRUCTION


DN100

DN150
CT-RSC2

CT-RSC2
"ILJIN"

"NEW"
PTR 2

PTR 1
GV FH GV SECTION CHECKED DATE REVIEWED DATE

VT
FH ELECTRICAL

DS
RECOMMENDED:
CONTROL BUILDING

PROTECTION MELVILLE A. MUTUC

PCB
MECHANICAL DESIGN SUPERVISOR
COMMUNICATION

DS MB CT
CT-DS4S
RENE U. ALBAY
CIVIL APPROVED:
ELECTRICAL DESIGN MANAGER
ARCHITECTURAL
DN100 L=35.8M

BUS VT'S
MECHANICAL

BS
CT-SS3S

Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part

DN150
DS
of the Contractor's obligations to meet the requirements of the Specifications nor of the
responsibility for the correctness of the Contractor's drawings.
PCB

FOR APPROVAL
DN150

DS/ES MB CT

CT-SS3S
OWNER:
NATIONAL GRID CORPORATION
FFC

OF THE PHILIPPINES
VT

NGCP Building, Power center complex


BASKETBALL COURT / LAY DOWN AREA

Quezon Avenue cor BIR Road, Diliman, Quezon City


6m ROADWAY (SE
E NOTE 23)
SA

CONTRACTOR:
DN150 FH
PIPE SLEEVE
NEW NORTHEAST ELECTRIC GROUP HIGH
VOLTAGE SWITCHGEAR CO., LTD.
H-FRAME

H-FRAME

DN100 L=41.6M FH GV
MANUFACTURER:
DN100 L=16M FH NANJING EXCELLENT TECHNOLOGY
GROUTED RIPRAP INTERNATION CORPORATION
PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
DN150

& MINDANAO SUBSTATION UPGRADING PROJECT,


STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
DN150 FH DN150 CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV) LAYOUT OF OUTDOOR FIRE
APPROVED: DATE:
9/16/2021
HYDRANT PIPING SYSTEM
CHECKED: DATE: Project Location/Name of Substation: SCALE:
9/16/2021 NAGAMIN SUBSTATION NTS
TO MAIN GATE

DRAWN: DATE: DRAWING NO: SHT. NO.: Rev. Ind.:


9/16/2021 0408 (IV) NAA 8125 Q 001 A 1 of 23 1
PREVIOUS DRAWING NO: 0408 (IV) NAA 8125 Q 001

You might also like