LIST OF SITE ISSUES

Client: UNICEF Consultant: SECC

Contractor: AMCU Project: PD9-KLOW water supply project

To: Ahamad Mukhtar Contracting Unit

Rating: Inspection Date: 18 April 2023

A. Works Satisfactory Trade: Stone masonry work

B. Works not Satisfactory Level:

C. Works Not Specified Build: Well house #1

D. Works Rejected Room: Well house

Section/Part: Foundation

Gentlemen:
Following the inspection at above date of the facility mentioned, please be advised of the ISSUES noted for your corrective measures.

Inspectors: SECC engineers

ISSUES:

The contractor is used stone masonry with small size which is not according to the standard requirements.
The stones which are used are not overlapped and not properly
filled with mortar. The contractor should use bigger size of stones
to avoid creating separate vertical stone layers in the middle of the
walls.