You are on page 1of 5

NOVOTEL HOLIDAY PALACE KPS

NCR Closing Report


NCR Code - NHP-CCY- WP1-NCR - 111
Date Opened: 30-Mar-2020
Contractor: CCY
Date Closed: 02-Jun-2020
Location of NCR: Level 2 - External Garden Parapet wall

Description of NCR: - CCY install parapet wall not follow the shape
- Parapet wall installation not good curve 02 June 2020

Check List Done Date


1) E-Project system filled in by contractor - Proposed solution ✓ 6-May-20

2) Method Statement Reviewed by ACT ✓ 18-May-20


3) Pre-repair/correction inspection by ACT:

A) - Do ACT allow contractor to proceed? YES NO


If NO - (After comments followed move to section B below)
Attach photos on seperate page. 18-May-20
Comments:

ACT Engineer: Chhor Bunty Signed:

B) - Do ACT allow contractor to proceed? YES NO


If NO - (After comments followed move to section B below)
Attach photos on seperate page.

18-May-20
Comments:

ACT Engineer: Chhor Bunty Signed:

4) Post-repair/correction inspection by ACT:

A) - Accepted? YES NO
Attach photos on seperate page.
1-Jun-20
Comments:

ACT Engineer: Chhor Bunty Signed:

Accepted and closed


Contractor - CCY Archetype
Name : HENG CHANVIGNEAN Name: Chhor Bunty
Position: Technical Engineer Position: ACT Site Architect
Date Sign Date Sign

02-Jun-20 02-Jun-20
NCR
Novotel Holiday Palace KPS
NON-CONFORMANCE REPORT INFORMATION
Project Name Novotel Holiday Palace KPS NCR # NHP-ACT-CCY-NCR-111

Issued By Bun Ty Chhor Position Site Architect Finishes

Issued Date 2020-03-30 00:00:00 Contractor China Construction Yangtze (Cambodia) Co., Ltd.

Project Manager John Morrison Contractor Contact Mr. Zhang Chao

Material/Works Inspected Level 2 - External Garden Parapet wall

Description - CCY install parapet wall not follow the shape


- Parapet wall installation not good curve

Pictures

Attachments Parapet_wall_Installation.pdf

Main recipient CC Chantha Lim, Kosal Chim, Odom Yin, John Morrison,
Dis Seng

PROPOSED CORRECTIVE ACTIONS FROM CONTRACTOR


Proposed by Heng Chanvignean Proposed Date 2020-05-06

Action description ‐ We in CCY used method for repair it as following :


As shown in below photos, the size of hollow block is 200mmX200mmX100mm, the actual construction can only try to follow curve in drawings and
then we fix the surface to make it smooth.
1. Surface Clean: Use high-pressure water gun wash small particle such as dust away from parapet wall
2. Surface repair: We will fix the parapet wall surface to make it smooth by hand sander before applying skim coat.
3. Invite Inspection: Invite ACT engineer to inspect the parapet wall surface to get approval.

Action Attachments NCR-111_Proposed_for_Correctiv...

CONSTRUCTION MANAGER'S APPROVAL FOR THE PROPOSED ACTIONS


Validation by Chantha Lim Validation Date 2020-05-18

CM Comments CCY need to reinstall the block wall by follow the the curve shape as per contract drawing.
NCR issued because:
1- plan not curve as contract drawing
2- elevation not leveling (block wall look like the wave, up and down).

Action Attachments NCR-111_Proposed_for_Correctiv...

CONSTRUCTION MANAGER CHECKS APPLIED ACTIONS & CLOSES OUT NCR


Final Validation by Final Validation Date

Witnessed by

Pictures

Construction Team Comments

Attachments

CM Comments

Page 1/2
CONSTRUCTION MANAGER CHECKS APPLIED ACTIONS & CLOSES OUT NCR

Page 2/2
Powered by TCPDF (www.tcpdf.org)
NCR
Novotel Holiday Palace KPS
PROPOSED FOR CLOSE NCR FROM CONTRACTOR NCR# NHP-ACT_CCY-111
Propose By Heng Chanvignean/WANG XIAO HUI Date: 2-Jun-20
Action We have rectified the parapet wall according to ACT engineer comment.
Descreptio
n

PHOTO ACTIONS