RESTORATION OF DAMAGED CONCRETE PAVEMENT, COVERED WALKWAY, PASSENGER TERMINAL

BUILDING, SCOURED PORTION OF SEAWALL & REPAINTING OF SECURITY FENCE

MANPOWER RATE SCHEDULE


No. PARTICULARS RATE PER HOUR

1 Project Manager 208.33


2 Project Engineer 156.25
3 Material's Engineer 130.21
4 Const. Safety & Health Officer 104.17
5 Construction Foreman 112.50
6 Skilled Laborer 93.75
7 Non-skilled Laborer 81.25
8 Driver 100.00
9 Heavy Equipment Operator 100.00
10 Light Equipment Operator 75.00
11 Light & Heavy Equipment Mechanic 112.5
12 First Aider 75.00
13
14
15

BIG J STEEL CORPORATION/ ROGEL U. SALVADOR - President


Name of Bidder/Authorized Representative