You are on page 1of 33

LOCATION REGISTERATION NUMBER

SECTOR MePS
Plot Number
Old (2019) New (2020)

TOWN CENTER -003 B2S-2019-007669

AL-MUTAWA -007 B2S-2019-007677


TOWN CENTER

AL-MUTARED -123 B2SE-2019-07653

AL-FOAH -913 B2M-2019-006104 B2S-2020-000650

QATTARA -115 B2N-2019-006121

CITY CENTER -116 B2SE-2019-07674

AL-AFLAJ -001A B2N-2019-006097

SWEIHAN -152 B2S-2019-007709

AL-HAYAR -618 B2N-2019-006498

AL-HAYAR -125 B2M-2019-006500


NORTH

AL-HAYAR -234 B2N-2019-006503

AL-HAYAR -511 B2N-2019-006501

NAHIL -582 B2N-2019-006505

NAHIL -405A B2N-2019-006515

MAZYAD -019 B2SE-2019-07697 SAME AS OLD

MAZYAD -168 B2N-2019-006468 SAME AS OLD

MAZYAD -112 B2N-2019-006472 SAME AS OLD

UMM GHAFA -242 B2S-2019-007698 SAME AS OLD


EAST

UMM GHAFA -003 B2S-2019-007699 SAME AS OLD

SAA' -101 B2SE-2019-07701

SAA' -781 B2N-2019-006478

SAA' -782 B2N-2019-006482

AL-KHARIR -104 B2N-2019-006477 SAME AS OLD

AL-AMERAH -189 B2S-2019-007398


WEST

RAMAH -008 B2N-2019-006488


WEST
AL-KHAZNA -900 B2S-2019-007707

AL-WAQAN -614 B2M-2019-006484


SOUTH
AL-ARAD -761 B2M-2019-006486

AL-QUA' -300 B2N-2019-006485


GENERAL
EXISTING WALL PERIMETER ENT

EXISTING
Material Existing Proposed
Gates Length (m)

Block Concrete + Concrete beam 443.1 443.5 3.3


Block Concrete + Concrete beam

Block Concrete + Concrete beam 345.4 373.4 3.0


Block Concrete + Concrete beam 3,431.7 5,367.6
Block Concrete + Concrete beam 588.8 588.8 3.8
Block Concrete + Concrete beam 465.2 465.3 4.3
Chainlink fence 594.0 595.5 4.0
Block Concrete 610.0 611.7 4.9
Block Concrete + Concrete beam 639.7 654.6 5.0
RCC

Chainlink fence 283.1 315.6 2.0


Chainlink fence 677.7 900.0 4.3
Chainlink fence 38.0 45.1 -
Chainlink fence 35.8 35.4 -
Block Concrete + Concrete beam 999.0 1,199.8 8.4
Chainlink fence 90.8 99.4 2.0
Chainlink fence 305.4 309.9 4.0
Chainlink fence + Block Concrete 319.6 526.7 4.3
Chainlink fence 508.8 516.2 1.0
Block Concrete + Concrete beam 361.6 361.5 4.7
Chainlink fence 182.8 191.6 4.0
Chainlink fence 278.1 321.4 3.0
None - 156.0 -
Block Concrete 450.5 450.6 4.9
RCC
Chainlink fence 92.9 100.6 2.0
RCC 1,615.4 1,945.2 9.0
Block Concrete + Concrete beam 360.1 478.7 3.5
Chainlink fence 242.4 3,626.7 -
ENTRANCE DEMO

PROPOSED
Entrance Pedestrian Gates Length Boundary wall (m)
Rooms (Nos.) Room Type
Length (m) Gate (Nos.) (m)
18.9 2 AD & G 2 4.0 443.1
2 AD & G 2
11.4 1 G 1 4.0 34.3
18.9 2 AD & G 2 6+6 3,431.7
18.9 2 AD & G 2 4.0 229.3
11.4 1 G 1 4.0 138.9
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 610.0
11.4 1 G 1 4.0 93.8
1 G 0 6.0 -
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 -
2.0 1 EL 0 2.0 -
2.0 1 EL 0 2.0 -
18.9 2 AD & G 2 4.0 990.6
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 G 1 4.0 70.9
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 440.7
1.0 G 1
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 1,615.4
11.4 1 G 1 4.0 240.1
18.9 2 AD & G 2 4.0 -

Unit Lm

TOTAL QUANTITY (Calculated) 8,338.7

TOTAL QUANTITY (BOQ) 9,729.0


DEMOLISION MAINTAINANCE PROPOSED

Boundary Wall (
Chain-link Fence Existing wall
(m) Buildings (m²) Maintainance (m) Front Panels

- 144.5 - 77.5

- 19.1 308.7 25.7


- 403.8 - 1,811.2
- 24.4 359.5 210.4
- 27.1 326.3 127.7
594.0 - - 174.3
- 54.2 - 134.0
- 60.2 545.9 82.3
- 17.8 - 4.1
283.1 - - 72.6
677.7 17.8 - 181.1
38.0 - - 4.1
35.8 - - 9.8
- 142.1 - 281.1
90.8 - - 20.9
305.4 - - 65.4
319.6 - - 84.5
508.8 - - 52.1
- - 290.7 59.3
182.8 - - 26.6
278.1 - - 81.5
- - - 51.4
- 76.0 - 114.7
92.9 - - 6.1
- 1,021.8 - 757.5
- 52.5 120.0 107.6
242.4 - - 1,297.4

Lm m² Lm
3,649.2 2,061.2 1,951.0

3,615.0 2,077.0
CIVIL &
PROPOSED PRECAST COMPONENTS

Boundary Wall (Lm) Building (m²) S


Sides & Rear Panels and Top Hollow Core Concrete
Total Proposed wall F1
Panels Parapet Slab Required
347.1 424.6 36.7 0
- 36.7 0
27.5 53.3 18.4 8 4.576
3,537.6 5,348.7 36.7 859 491.348
- 210.4 36.7 33 18.876
- 127.7 18.4 21 12.012
409.8 584.1 18.4 94 53.768
458.7 592.8 36.7 93 53.196
15.0 97.3 18.4 13 7.436
- 4.1 18.4 0 0
231.7 304.2 18.4 46 26.312
700.0 881.1 36.7 140 80.08
39.0 43.1 5 2.86
23.7 33.4 2 1.144
899.9 1,180.9 36.7 188 107.536
67.2 88.0 18.4 12 6.864
233.1 298.5 18.4 23 13.156
430.8 515.3 18.4 82 46.904
452.8 504.8 18.4 80 45.76
- 59.3 18.4 10 5.72
153.7 180.2 18.4 28 16.016
228.6 310.0 18.4 47 26.884
93.1 144.6 18.4 22 12.584
316.9 431.7 36.7 66 37.752
- 18.4 0
83.2 89.2 18.4 13 7.436
1,168.8 1,926.3 36.7 233 133.276
239.7 347.3 18.4 55 31.46
2,310.4 3,607.8 36.7 0 0

Lm Lm m² m²
5,920.6 18,388.8 - 679.3

6,326.0 19,673.0 3,034.0 740.0


CIVIL & ARCHETICTURAL WORK
CAST IN-SITU CONCRETE
100mm BLINDING (Cbm)
Single Footing Strip Footing
Concrete Concrete Concrete
F2 F3 TOTAL Quantity
Required Required Reqired
0 2 0.748 2 2 4.98
0 0 - 2 4.98
5 3.38 0 0 13 1 2.49
14 9.464 2 0.748 875 2 4.98
2 1.352 2 0.748 37 2 4.98
3 2.028 0 0 24 1 2.49
5 3.38 0 0 99 1 2.49
4 2.704 2 0.748 99 2 4.98
4 2.704 0 0 17 1 2.49
0 0 0 0 0 1 2.49
5 3.38 0 0 51 1 2.49
4 2.704 2 0.748 146 2 4.98
4 2.704 4 1.496 13 EL
5 3.38 4 1.496 11 EL
4 2.704 2 0.748 194 2 4.98
5 3.38 0 0 17 1 2.49
5 3.38 0 0 28 1 2.49
5 3.38 0 0 87 1 2.49
5 3.38 0 0 85 1 2.49
3 2.028 0 0 13 1 2.49
5 3.38 0 0 33 1 2.49
5 3.38 0 0 52 1 2.49
5 3.38 0 0 27 1 2.49
4 2.704 2 0.748 72 2 4.98
0 0 0 1 2.49
5 3.38 0 0 18 1 2.49
4 2.704 2 0.748 239 2 4.98
5 3.38 0 0 60 1 2.49
0 0 2 0.748 2 2 4.98
PA
50mm BLINDING (Cbm) BOUNDA
Columns
Concrete
Quantity C1 C2 C3 C4
Required
2 -

7 2 1 1
857 10 2 2
33 2 2 -
20 2 1 1
93 4 1 1
93 4 2 -
12 2 1 2

45 4 1 1
140 4 2 -
5 2 4 2
2 3 4 2
188 4 2 -
11 4 1 1
23 3 1 1
81 4 1 1
79 4 1 1
9 2 1 1
27 4 1 1
46 4 1 1
21 4 1 1
66 4 2 -
12 4 1 1
233 2 2 1
54 2 1 1
2
PAINT
BOUNDARY WALL
mns Panels
6.17m
C5 TOTAL 6.17m Solid Other (m) Other (m)
Decorated
- 2 56 1.6 12 3.4
0
2 13 4 2.9 4 1.0
4 875
- 37 0 - 34 0.7
- 24 0 - 20 4.3
- 99 66 1.4 28 0.8
- 99 74 2.2 21 4.5
- 17 2 2.7 13 2.1
0
- 51 37 3.4 11 4.7
- 146 113 2.8 29 2.2
- 13 6 1.6 0 3.5
- 11 3 1.0 1 3.1
- 194 145 5.2 45 3.4
- 17 10 5.5 3 2.4
- 28 37 4.8 10 3.7
- 87 69 5.1 13 4.3
- 85 73 2.4 8 2.7
- 13 0 - 9 3.8
- 33 25 - 4 1.9
- 52 37 0.3 13 1.3
- 27 15 0.6 8 2.1
- 72 51 2.3 18 3.7
0
- 18 13 3.0 1
- 238 189 2.7 122 4.8
2 60 38 5.3 17 2.7
2
Water Heater Water Boosting Pump Water Storage Tank
PPR-CT PIPES

Float Valve Pump Control Switch ⌀32mm


MECHANICA
PLUMP
PPR-CT PIPES

⌀25mm Globe Valve (25mm Dia)


MECHANICAL WORKS
PLUMPING

Reducer coupling 3 way (32mm Coupling Tee (32mm dia) 3


Gate valve (32mm Dia)
dia to 25mm dia) Way
Coupling Tee (25mm Dia)
Bulkhead Fitting pvc clamp (25mm Dia)
3 Way
Female Thread Tee Female Thread Tee
90 Deg Elbow (32mm Dia)
(25mm Dia) 3Way (25mm Dia) 90Deg
90 Deg Elbow (25mm Dia)
Single Footing (Boundary Wa
LOCATION
100mm PCC (Blinding
SECTOR
Concrete
Plot Number F1
Required
F2

TOWN CENTER -003 0

AL-MUTAWA -007 0
TOWN CENTER

AL-MUTARED -123 8 4.576 5

AL-FOAH -913 859 491.348 14

QATTARA -115 33 18.876 2

CITY CENTER -116 21 12.012 3

AL-AFLAJ -001A 94 53.768 5

SWEIHAN -152 93 53.196 4

AL-HAYAR -618 13 7.436 4

AL-HAYAR -125 0 0 0
NORTH

AL-HAYAR -234 46 26.312 5

AL-HAYAR -511 140 80.08 4

NAHIL -582 5 2.86 4

NAHIL -405A 2 1.144 5

MAZYAD -019 188 107.536 4

MAZYAD -168 12 6.864 5

MAZYAD -112 23 13.156 5

UMM GHAFA -242 82 46.904 5


EAST

UMM GHAFA -003 80 45.76 5

SAA' -101 10 5.72 3

SAA' -781 28 16.016 5


SAA' -782 47 26.884 5

AL-KHARIR -104 22 12.584 5

AL-AMERAH -189 66 37.752 4


WEST

RAMAH -008 0

AL-KHAZNA -900 13 7.436 5

AL-WAQAN -614 233 133.276 4


SOUTH

AL-ARAD -761 55 31.46 5

AL-QUA' -300 0 0 0

Unit Nos. Cbm Nos.

TOTAL QUANTITY 2,173.0 1,243.0 115.0


CAST IN-SITU CONCRETE
Footing (Boundary Wall Columns) Srtip Footing (Ro
100mm PCC (Blinding) 100mm PCC (Blinding)

Concrete
Concrete TOTAL
Required F3 TOTAL Quantity
Required Concrete
(Cbm)

0 2 0.748 2 0.748 2

0 0 0 0 2

3.38 0 0 13 7.956 1

9.464 2 0.748 875 501.56 2

1.352 2 0.748 37 20.976 2

2.028 0 0 24 14.04 1

3.38 0 0 99 57.148 1

2.704 2 0.748 99 56.648 2

2.704 0 0 17 10.14 1

0 0 0 0 0 1

3.38 0 0 51 29.692 1

2.704 2 0.748 146 83.532 2

2.704 4 1.496 13 7.06 EL

3.38 4 1.496 11 6.02 EL

2.704 2 0.748 194 110.988 2

3.38 0 0 17 10.244 1

3.38 0 0 28 16.536 1

3.38 0 0 87 50.284 1

3.38 0 0 85 49.14 1

2.028 0 0 13 7.748 1

3.38 0 0 33 19.396 1
3.38 0 0 52 30.264 1

3.38 0 0 27 15.964 1

2.704 2 0.748 72 41.204 2

0 0 0 0 1

3.38 0 0 18 10.816 1

2.704 2 0.748 239 136.728 2

3.38 0 0 60 34.84 1

0 2 0.748 2 0.748 2

Cbm Nos. Cbm Nos. Nos.

77.7 26.0 9.7 2,314.0 37.0


Srtip Footing (Rooms) Under Slabs
00mm PCC (Blinding) Reinforced Concrete 50mm PCC (Blinding)

Concrete Concrete Concrete


Quantity Quantity
Reqired (Cbm) Required (Cbm) Required (Cbm)

4.98 2 24.60

4.98 2 24.60

2.49 1 12.30

4.98 2 24.60

4.98 2 24.60

2.49 1 12.30

2.49 1 12.30

4.98 2 24.60

2.49 1 12.30

2.49 1 12.30

2.49 1 12.30

4.98 2 24.60

4.98 2 24.60

2.49 1 12.30

2.49 1 12.30

2.49 1 12.30

2.49 1 12.30

2.49 1 12.30

2.49 1 12.30
2.49 1 12.30

2.49 1 12.30

4.98 2 24.60

2.49 1 12.30

2.49 1 12.30

4.98 2 24.60

2.49 1 12.30

4.98 2 24.60

Cbm

92.1
PAINT
LOCATION Boundary Wall
SECTOR
Columns
Plot Number
C1 C2 C3 C4 C5 TOTAL
TOWN CENTER -003 2 - - 2
AL-MUTAWA -007 0
TOWN CENTER

AL-MUTARED -123 7 2 1 1 2 13
AL-FOAH -913 857 10 2 2 4 875
QATTARA -115 33 2 2 - - 37
CITY CENTER -116 20 2 1 1 - 24
AL-AFLAJ -001A 93 4 1 1 - 99
SWEIHAN -152 93 4 2 - - 99
AL-HAYAR -618 12 2 1 2 - 17
AL-HAYAR -125 0
NORTH

AL-HAYAR -234 45 4 1 1 - 51
AL-HAYAR -511 140 4 2 - - 146
NAHIL -582 5 2 4 2 - 13
NAHIL -405A 2 3 4 2 - 11
MAZYAD -019 188 4 2 - - 194
MAZYAD -168 11 4 1 1 - 17
MAZYAD -112 23 3 1 1 - 28
UMM GHAFA -242 81 4 1 1 - 87
EAST

UMM GHAFA -003 79 4 1 1 - 85


SAA' -101 9 2 1 1 - 13
EAST
SAA' -781 27 4 1 1 - 33
SAA' -782 46 4 1 1 - 52
AL-KHARIR -104 21 4 1 1 - 27
AL-AMERAH -189 66 4 2 - - 72
WEST

RAMAH -008 0
AL-KHAZNA -900 12 4 1 1 - 18
AL-WAQAN -614 233 2 2 1 - 238
SOUTH

AL-ARAD -761 54 2 1 1 2 60
AL-QUA' -300 2 2

Unit Nos. Nos. Nos. Nos. Nos. Nos.

TOTAL QUANTITY 2,157.0 84.0 41.0 23.0 8.0 2,313.0


ary Wall
Panels
6.17m
6.17m Solid Other (m) Other (m)
Decorated
56 1.6 12 3.4

4 2.9 4 1.0

0 - 34 0.7
0 - 20 4.3
66 1.4 28 0.8
74 2.2 21 4.5
2 2.7 13 2.1

37 3.4 11 4.7
113 2.8 29 2.2
6 1.6 0 3.5
3 1.0 1 3.1
145 5.2 45 3.4
10 5.5 3 2.4
37 4.8 10 3.7
69 5.1 13 4.3
73 2.4 8 2.7
0 - 9 3.8
25 - 4 1.9
37 0.3 13 1.3
15 0.6 8 2.1
51 2.3 18 3.7

13 3.0 1
189 2.7 122 4.8
38 5.3 17 2.7

Nos. (Lm) Nos. (Lm)

1,063.0 56.3 444.0 66.7