Plot Number
Old (2019) New (2020)
EXISTING
Material Existing Proposed
Gates Length (m)
PROPOSED
Entrance Pedestrian Gates Length Boundary wall (m)
Rooms (Nos.) Room Type
Length (m) Gate (Nos.) (m)
18.9 2 AD & G 2 4.0 443.1
2 AD & G 2
11.4 1 G 1 4.0 34.3
18.9 2 AD & G 2 6+6 3,431.7
18.9 2 AD & G 2 4.0 229.3
11.4 1 G 1 4.0 138.9
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 610.0
11.4 1 G 1 4.0 93.8
1 G 0 6.0 -
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 -
2.0 1 EL 0 2.0 -
2.0 1 EL 0 2.0 -
18.9 2 AD & G 2 4.0 990.6
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 G 1 4.0 70.9
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 440.7
1.0 G 1
11.4 1 AD 1 4.0 -
18.9 2 AD & G 2 4.0 1,615.4
11.4 1 G 1 4.0 240.1
18.9 2 AD & G 2 4.0 -
Unit Lm
Boundary Wall (
Chain-link Fence Existing wall
(m) Buildings (m²) Maintainance (m) Front Panels
- 144.5 - 77.5
Lm m² Lm
3,649.2 2,061.2 1,951.0
3,615.0 2,077.0
CIVIL &
PROPOSED PRECAST COMPONENTS
Lm Lm m² m²
5,920.6 18,388.8 - 679.3
7 2 1 1
857 10 2 2
33 2 2 -
20 2 1 1
93 4 1 1
93 4 2 -
12 2 1 2
45 4 1 1
140 4 2 -
5 2 4 2
2 3 4 2
188 4 2 -
11 4 1 1
23 3 1 1
81 4 1 1
79 4 1 1
9 2 1 1
27 4 1 1
46 4 1 1
21 4 1 1
66 4 2 -
12 4 1 1
233 2 2 1
54 2 1 1
2
PAINT
BOUNDARY WALL
mns Panels
6.17m
C5 TOTAL 6.17m Solid Other (m) Other (m)
Decorated
- 2 56 1.6 12 3.4
0
2 13 4 2.9 4 1.0
4 875
- 37 0 - 34 0.7
- 24 0 - 20 4.3
- 99 66 1.4 28 0.8
- 99 74 2.2 21 4.5
- 17 2 2.7 13 2.1
0
- 51 37 3.4 11 4.7
- 146 113 2.8 29 2.2
- 13 6 1.6 0 3.5
- 11 3 1.0 1 3.1
- 194 145 5.2 45 3.4
- 17 10 5.5 3 2.4
- 28 37 4.8 10 3.7
- 87 69 5.1 13 4.3
- 85 73 2.4 8 2.7
- 13 0 - 9 3.8
- 33 25 - 4 1.9
- 52 37 0.3 13 1.3
- 27 15 0.6 8 2.1
- 72 51 2.3 18 3.7
0
- 18 13 3.0 1
- 238 189 2.7 122 4.8
2 60 38 5.3 17 2.7
2
Water Heater Water Boosting Pump Water Storage Tank
PPR-CT PIPES
AL-MUTAWA -007 0
TOWN CENTER
AL-HAYAR -125 0 0 0
NORTH
RAMAH -008 0
AL-QUA' -300 0 0 0
Concrete
Concrete TOTAL
Required F3 TOTAL Quantity
Required Concrete
(Cbm)
0 2 0.748 2 0.748 2
0 0 0 0 2
3.38 0 0 13 7.956 1
2.028 0 0 24 14.04 1
3.38 0 0 99 57.148 1
2.704 0 0 17 10.14 1
0 0 0 0 0 1
3.38 0 0 51 29.692 1
3.38 0 0 17 10.244 1
3.38 0 0 28 16.536 1
3.38 0 0 87 50.284 1
3.38 0 0 85 49.14 1
2.028 0 0 13 7.748 1
3.38 0 0 33 19.396 1
3.38 0 0 52 30.264 1
3.38 0 0 27 15.964 1
0 0 0 0 1
3.38 0 0 18 10.816 1
3.38 0 0 60 34.84 1
0 2 0.748 2 0.748 2
4.98 2 24.60
4.98 2 24.60
2.49 1 12.30
4.98 2 24.60
4.98 2 24.60
2.49 1 12.30
2.49 1 12.30
4.98 2 24.60
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
4.98 2 24.60
4.98 2 24.60
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
2.49 1 12.30
4.98 2 24.60
2.49 1 12.30
2.49 1 12.30
4.98 2 24.60
2.49 1 12.30
4.98 2 24.60
Cbm
92.1
PAINT
LOCATION Boundary Wall
SECTOR
Columns
Plot Number
C1 C2 C3 C4 C5 TOTAL
TOWN CENTER -003 2 - - 2
AL-MUTAWA -007 0
TOWN CENTER
AL-MUTARED -123 7 2 1 1 2 13
AL-FOAH -913 857 10 2 2 4 875
QATTARA -115 33 2 2 - - 37
CITY CENTER -116 20 2 1 1 - 24
AL-AFLAJ -001A 93 4 1 1 - 99
SWEIHAN -152 93 4 2 - - 99
AL-HAYAR -618 12 2 1 2 - 17
AL-HAYAR -125 0
NORTH
AL-HAYAR -234 45 4 1 1 - 51
AL-HAYAR -511 140 4 2 - - 146
NAHIL -582 5 2 4 2 - 13
NAHIL -405A 2 3 4 2 - 11
MAZYAD -019 188 4 2 - - 194
MAZYAD -168 11 4 1 1 - 17
MAZYAD -112 23 3 1 1 - 28
UMM GHAFA -242 81 4 1 1 - 87
EAST
RAMAH -008 0
AL-KHAZNA -900 12 4 1 1 - 18
AL-WAQAN -614 233 2 2 1 - 238
SOUTH
AL-ARAD -761 54 2 1 1 2 60
AL-QUA' -300 2 2
4 2.9 4 1.0
0 - 34 0.7
0 - 20 4.3
66 1.4 28 0.8
74 2.2 21 4.5
2 2.7 13 2.1
37 3.4 11 4.7
113 2.8 29 2.2
6 1.6 0 3.5
3 1.0 1 3.1
145 5.2 45 3.4
10 5.5 3 2.4
37 4.8 10 3.7
69 5.1 13 4.3
73 2.4 8 2.7
0 - 9 3.8
25 - 4 1.9
37 0.3 13 1.3
15 0.6 8 2.1
51 2.3 18 3.7
13 3.0 1
189 2.7 122 4.8
38 5.3 17 2.7