Corrigendum-08
Following the online clarification meeting conducted on January 13, 2024, we provide the
following clarifications regarding the Request for Proposal (RFP) for the Upgradation of City
CCTV Surveillance in Gwalior:
Addendum clause for Product Demo: A mandatory product demonstration prior to the
financial quote opening is introduced. This demonstration is essential for bidders to showcase
the specification, functionality, quality, and performance of their offered products. This stage
is critical in the technical evaluation process, and only those who successfully demonstrate
their products will have their financial quotes considered. This clause ensures a fair and
thorough assessment of the products before financial considerations.
List of items where vendor need to submit MAF and specification compliance in technical bid
are listed below:
Item name OEM MAF Remarks.
required to be MAF not to be submitted with
submitted Technical Bis. However, the
with technical successful Bidder shall submit the
bid MAF with 15 Days after LOA and
before Signing the Agreement.
Item No. 1, Bullet CCTV Required
Item No. 2, PTZ CCTV Required
Item No. 3, Workstation Required
Item No. 7 , RJ-45 computer jack Not Required The successful Bidder shall submit
to submit with the MAF within 15 Days after LOA
Technical Bid and before Signing the Agreement.
Item No. 8 , Cat 6 cable Not Required The successful Bidder shall submit
to submit with the MAF within 15 Days after LOA
Technical Bid and before Signing the Agreement.
Item No. 20, Patch panel 24 Port Not Required The successful Bidder shall submit
to submit with the MAF within 15 Days after LOA
Technical Bid and before Signing the Agreement.
.&
{Y',
'"{M
14,,.' '
Item No. 2L,15U outdoor rack pole Not Required The successful Bidder shallsubmit
mount to submit with the MAF within 1-5 Days after LOA
Technical Bid and before Sienine the Agreement.
Item No. 22.42u server Rack Requ red
Item No. 23, firewall Required
Item No. 24.8 Port POE switch Not Required The successful Bidder shall submit
to submit with the MAF within 15 Days after LOA
Technical Bid and before Signine the Agreement.
Item No. 25. 24 port Layer2 Switch Not Required The successful Bidder shall submit
to submit with the MAF within 15 Days after LOA
Technical Bid and before Signing the Agreement.
Item No. 31. Data SAN storage Required
Item No. 33. Rack Server Required
Item NO. 34. Video management Required
Software
Item No. 35. VPN Router Required
Item NO. 36. SAN Switch Required
Item No 29, Network Monitoring Required
Software
Item No 5, Rack mounted UPS lkVA Required
UPS
Note:
The successful bidder whosoever shall not comply with the compliance of MAF criteria
mentioned above "Not Required to submit with Technical Bid. The successful Bidder shall
submit the MAF within 15 Days after LOA and before Signing the Agreement" shall result in n
forfeitureof theearnestmoney/BidSecuritydepositAn l 1L{ b,1"rt {rg1, 6Th"g[ h€ &"b4
*
.4.
fYi
udrl
l{,,^,,.
SNo RFP Clause RFP Clause Clarification Sought Cla rification/Re ply
Ref.
20 KVA (3 phase Delete MAF Clarification:
MAF Not Required.
input & 3 phase
For detail Refer detailed
output) Delta Hot Clarification given below in point
1.
plug Module for No. 28.
existing 80KVA
Delta UPS:
(Technical I ris Make it as a P-lRlS Modified as lris
Compliance) DC-IRIS from DC-lRlS DC-rRrS / P-rRrS
15.1 ltem No.
2.
1 :- Bullet
CCTV, Serial
No.7
(Technical lR distance change to 50 Mtr. or Cla rification:
Compliance) Smart lR 50m, Day and better, The Minimum Smart lR 60m Day
15.1 ltem No. Night mode switching and Night mode switching based.
3.
1 :- Bullet based on lR sensor or However, the bidder may provide
CCTV, Serial schedule. more lR than 60m.
No. L1
(Tech n ica I Angle of View Remove the angle of Cla rification:
Com plia nce) H:88"-26", V:65"-20" View As per ROW, the minimum wide
15.1 ltem No. angle of view is required. The
4.
1 :- Bullet successful bidder may provide
CCTV, Serial more coverage than specified.
No. 19
(Technical Security Remove Stream Clarification:
Compliance) User account and encryption, AES128 / The absence of stream encryption
15.1 ltem No. passyvord protection, 256 and AES128/256 might expose the
5. 1 :- Bullet HTTPS, lP Filter, Digest system to risks
CCTV, Serial a uthentication, TLS1.2,
t?
ffi
k&d
14.",.-.
(2
CCTV, Serial
No. 35
ffii
\der
SNo RFP Clause RFP Clause Clarification Sought Clarification/Reply
Ref.
(Technical Patrol change to 5 nos. Clarification:
Compliance) 6 nos. The minimum Patrol 6 Nos is
15.2 ltem required. However, the Vendor
17.
No.-2, PTZ may provide better Patrol.
CCTV, Serial
No.37
(Technical Environment allow lP66 and NEMA Clarification:
Compliance) I P67 rated outdoor The minimum lP67 rated outdoor
L5.2 ltem protection weather and water
18. No.-2, PTZ resistance/proofi ng protection is
CCTV, Serial required. However, the bidder
No.43 may provide better lP rating for
outdoor protection.
(Technical Heater / Fan Remove Clarification:
Com pliance) Yes It is required as per equipment for
L5.2 ltem the better operation ofthe
19.
No.-2, PTZ equipment's.
CCTV, Serial
No. 45
(Technical Certifications / Remove foreign Clarification:
Compliance) Compliances: ONVIF: certifications Refer Corrigendum
15.2 ltem Profile S, G, T; Secure
No.-2, PTZ by Default; UL 62368-
20.
CCTV, Serial 1; FCC PART 15B, EN
No. 53 55032; CE (EN 50130-
4); CE (EN 63000);
NDAA: Sec 889;
Corrigendum Bidder should have This was changed As per the Approved procurement
t supplied and installed from 7 year documents. lt is five (5) Years.
Page 2 any of the following in (mentioned in RFP Thus, it was modified as five years.
Point 7 last 5 years from the document) to 5
date of publishing this years. During corona
RFP as below... period 2 years were
quite slow for the
21.
entire industries, so
we kindly request
authorities to change
this back to 7 years,
as it will allow more
participants to
participate in the bid.
,/
a-
d,-q
-Vesr
l"-r,.
SNo RFP Clause RFP Clause Clarification Sought Cla rification/Reply
Ref.
Corrigendum a. The milestones
t For CCW Camera mentioned here have Cla rification:
Page 4 Quantity up to 25-SITC different timeline, As per the Mission Project
Point 11 to be completed within but in the same Timelines, the project is to be
Payment 30 days of work order. document on page completed on fast track. Thus, lt is
Milestones b. no 6, it is mentioned required to meet the project time
For CCTV cameras that "all the cameras lines and thus, cant not be
quantity 25 to 100 - as specified in the changed.
22. SITC to be completed BOQ are considered
within 90 days of work as a single
order. milestone". These
c. are contrasting each
All CfiV camera other. Please clarify.
quantity as specified in
BOQ- SITC to be
completed within 120
davs of work order.
Corrigendum 1 X R750xs The R750xs Clarification:
3 Motherboard with motherboard being These components are mentioned
Page 1 Broadcom 5720 Dual asked is DELL specific as a benchmark for quality and
15.13 rack Port 1Gb On-Board motherboard. No performance, and are not
Server LOM other OEM provides restrictive in terms of brand.
this motherboard. vendor may provide better
Hence this restricts
the server brand to
DELL only and DELL
has already locked
price and MAF with
23. one bidder and not
giving price or MAF
to others, hence we
request you to make
these specifications
generic, and remove
the requirement of
MAF and technical
compliance on OEM's
letterhead, so that
more bidders can
participate in the bid.
Corrigendum 2 X lntel Xeon Gold There are other Clarification:
3 5317 3G, 12C/241, processor brands These components are mentioned
1 11,.2G1/s,18M also which provide as a benchmark for quality and
15.13 rack Cache,Turbo, HT high processing performance, and are not
Server (1_s0w) DDR4-2933. W powers such as AMD, restrictive in terms of brand.
ARM, Apple silicon, vendor may provide better
etc. hence we
request you to make
24.
these specifications
generic, and remove
the requirement of
MAF and technical
compliance on OEM's
letterhead, so that
more bidders can
participate in the bid.
9-/
A
f\ry
!*&C
i
11'"" '''
,/
&
!{&/
,4,,,,..
,,/
,A
\yi
i
\l},9,,!',,,
38 Certification &
Model
FCC, CE, RC[4+CCI
BSMI.SL-C*
e/ /
&,
',l&r
SNo RFP Clause RFP Clause Clarification Sought Cla rification/Reply
Ref.
RoHSZ BIS,IEC
60950 and RoHS
38 Certification &
Model
FCC, CE, E4l4JlEC+
BSMIT"U! €&
RoI{SZ 8:t, :!-{-
5,1!,i;) ,ird li.oH5
Page No.97 4. The proposed The Clauses Clarification:
Section solution must be concerned are These components is part of
15.9Sub recognized as Leader prorietory and critical security edge device,
Sectionltem in the latest Gartner restrictive, also the mentioned as a benchmark for
No. 23,; Magic Quadrant for foreign quality and performance, vendor
firewall Enterprise Firewalls certificates/standar may provide better
Specs/Compl since last three years ds. Hence should be
iances in a row. removed, in order to
promote Indian
5. The proposed OEMs to participate,
solution must be from therefore, make the
36.
a family of products project
that achieves participatory.
"Recommended"
rating from NSS Labs
for NGFW testing.
f t/'
,"
A.
{'v"\
!&&l
SNo RFP Clause RFP Clause Clarification Sought Cla rification/Reply
Ref.
BOQ Section MIC Sir, As the Cla rification:
BOQ Line Mic outdoor for CCTV Specification ofthe The vendor is expected to provide
Item 39Sub two way required item is not a generic microphone that is
Section communication, 5Yr given in the RFP as compatible with provided camera
IT Work well as in BOQ system. The primary purpose of
Hence we request this microphone is to monitor field
31.
you to kindly add audio, enhancing the overall
the technical security and situational
specification ofthe awareness.
same for better
understanding and
solution.
BOQ Section 2. Technology and Kindly amend the Clarification:
Line Item 5 Capability clause as: The specification mentioned are
Sub a) True Online minimum, However, the vendor
SectionAs configuration with 2. Technology and may provide equipment with
per double conersion UPS Capability better specifications.
Corrigendum &Zero transfer time aJ True Online
1 Dated bJ DSP based control configuration with
07/Jan/2024 with advanced double conersion
POWER technology. Cl Wide UPS & Zero transfer
UPS Input voltage range time b) DSP based
from [80-280VAC) d] control with
Auto restart & advanced
capability with the technology. Cl Wide
Independet battery Inputvoltage range
bank operation ofthe from {88-2.8OVAC}
UPS. e) UPS should be [L76-28O vAC) d)
designed at Rated PF Auto restart &
38. of 0.9 i.e. lkva/0.9KW capability with the
UPS rating. f) Independet battery
Generator bank operation of
compatibility with the UPS. eJ UPS
cold start and AC start should be designed
featuies. gJAutomatic at Rated PF of 0.9 i.e.
bypass to transfer the lkva/0.9KW UPS
load on mains due to rating. fJ Generator
overload & internal compatibility with
fault. h) ECO mode cold start and AC
should be available in start features.
the UPS> gJAutomatic bypass
to transfer the Ioad
on mains due to
overload & internal
fault. hl ECO mode
should be available
in the UPS>
B0Q Section 4.2 Kindly amend the Clarification:
Line Item 5 Input Voltage Range clause as: 80-280VAC Range (Full Load): This
Sub 80-280VAC Range indicates that the device can
SectionAs fFull Load) 775-280 4.2 operate normally with a full load
per VAC Range (50-100 Input Voltage Range when the input voltage is within
Corrigendum o/oLoad is requiredJ 8g-28gVAC 111! - the range of 80 to 280 Volts
39. 1 Dated 80-17sVAC li;* YAl- R.i{€e Alternating Current (VAC). "Full
0t/lan/202a f$+U+€ad) load" means the maximum
POWER 175*280rlAe operational load that the device is
UPS R+sge{50"1€+% rated for.
teadir++€qu+l€d}
80^.FW.AC
175-280 VAC Ranse: This indicates
.4.
rY1
\*y,
.14. ',
*
+-q
iY1
L,&#
SNo RFP Clause RFP Cla use Clarification Sought Cla rification/Reply
Ref.
BOQ Section 9.1 Kindly amend the Modified As
Line Item 5 Measurements (on clause as: Measurements (on LCD)
Sub LCD) lnput voltage & Frequency,
SectionAs Input voltage & 9.1_ Bypass, Output Voltage &
per Frequency, Bypass, Measurements [on frequency, Battery & Load Level
Corrigendum OutputVoltage & LCDJ lndicator, Ambient temperature &
l Dated frequency, Kilowatt, Input voltage & Event code.
07/lan/2024 KVA, ECO mode, Frequency, Bypass,
41.
POWER Battery & Load Level Output Voltage &
UPS Indicator, Ambient frequency,
temperature & Event Kilstca++fi*i+eS
code. m€d€, Battery &
Load Level
Indicator, Ambient
temperature &
Event code.
BOQ Section 11.1 Kindly amend the Clarification
Line Item 5 Backup Required clause as: As per Specification vendor may
Sub 60 min on 200 W provide any of these mentioned .
SectionAs load, Min VAH 77.7
per 624/26AH/L2 x2 No. Backup Required
42. Corrigendum 60 min on 200 W
1 Dated load, Min VAH
0L/Jan/2024 624126A;Ii L:+-xZ
POWER N€E
UPS
,+
r..s\,
\ed
SNo RFP Clause RFP Clause Clarification Sought Clarification/Reply
Ref.
BOQ Section 72.6 this is the Clarification:
Line Item 5 Interface to DCS proprietory clause, Specification you're referring to
Sub (Distributed Control we request you to concerns the interface options for
SectionAs SystemJ- To be kindly omit this connecting a U ninterruptible
per quoted as option clause for wider Power Supply (UPS) to a
Corrigendum Relay I/O Card or PFC participation ofthe Distributed Control System (DCS),
45.
1 Dated [Potential free OEMs. Program mable Logic Control ler
0l/lan/2024 contacts) for (PLC), or Supervisory Control and
POWER connecting to UPS to Data Acquisition (SCADA) system.
UPS DCS/PLClSCADA this parameter is (OPTIONAL)
system for
communicating UPS
operating status
fOPTIONAL]
BOQ Section 74.L Kindly amend the Modified as
Line Item 5 0perating clause as: Operating Temperature Minimum
Sub Temperature 0to50degC
SectionAs 0to55degC 14
per Operating
46. Comigendum Temperature
l Dated &te5.Sdeg4 0 to
07/Jan/2024 50 degree C
POWER
UPS
As per Standard
Practice
B0Q Section 15.1 Kindly amend the Clarification:
Line Item 5 Manufacturer clause as: Required as per project
Sub QMS: As per ISO component.
SectionAs 9001:2 015 15.1
per EMS:As per Manufacturer
Corrigendum ISO14001:2015 QMS: Asper ISO
50. 1 Dated OSHAS: As per IS0 9007:201.5
0t/lan/2024 L800 1:2007 EMS:As per
POWER EMS:As per IS0 IS014001:2 0 15
UPS 1,4064-12012 0SH,++,.Aspe*{SO
lAS+*2s$7
El${i.-,1.;p*r [$€l
+4S#[*i':?{}12
BOQ Section L5.2 Kindly amend the Modified as
Line Item 5 Product Salety clause as: Prod uct Safety Certifications
Sub Certifications (Mandatory)
SectionAs [Mandatory) 15.2 CE Certification
per CE Certification Product Safety NABL accredited factory
Corrigendum TL9000 certificate Certifications calibration lab in INDIA
51.
1 Dated NABL accredited IMandatory]
0t/lan/2024 factory calibration lab CE Certification
POWER in INDIA It9000-ee+tifie+te
UPS l.J,ABl-aeer+di+eet
faete+y+aliU+atien
labj*lNDlA
;1