Customer:

M/S Euroestudios Consulta Date : 01/02/2010


P.O. Box 3730 Abu Dhabi, UAE Invoice No. :
Tel. 02-562 4412 Fax 02-112 2233 Report No. : XRA/SD10-0055

Subject IN-SITU DENSITY TEST

Project Name Improvement of Infrastructure at Madinat Zayed City


Project No. N.A
Your Ref. 0

Type of Test Qty. Unit Price Total Price


(No.) (Dhs) (Dhs)
In-Situ Density 22 55 1210

Total Amount (Dhs. One Thousand Only) 1210

Please arrange the payment of this amount to MATRIX LABORATORY.


We would like to take this opportunity to thank you for your confidence and look forward to be of service to you in the
future.

Sincerely yours

MATRIX LABORATORY
ABU DHABI-U.A.E

Page 1/1
Client Western Region Municipality Request No XQA/SD10-0055 the report page number
Consultant Euroestudios Consulta Sample No
Contractor Faber LLC Report No XRA/SD10-0055 Date Rep.d 01/02/2010
Project No. N.A Date Tested/T 31/01/2010
Project Name Improvement of Infrastructure at Madinat Zayed City Time Tested
Material descr. /
Sub Base / Villa No.6, Old Baynounah Sample Brt. In matrix Client Ref.
Location
Source Site Tested By Asim
Test Method ASTM D1556 - 00 Test Method V

Density of sand Wt. Of sand in cone+


(g/cm3) 1.431 baseplate (g) 1503 Proctor Ref. XRA/M09-0255/6 CONE A

Test No. 1 2 3
Client Id.No
Location Villa No.6, OldVilla
Baynounah
No.6, OldVilla
Baynounah
No.6, Old Baynounah
Layer No. Sub Base LayerSub Base LayerSub Base Layer
Layer Thickness 150 150 150
Level N.P N.P N.P
Bottle No.
Wt of wet soil from
hole 6458 6123 6120
Wt of sand before
poring 8000 8000 8000
Wt of sand after
poring 2520 2700 2700
Wt of sand in hole
3977 3797 3797
Ratio
1.624 1.613 1.612
Wet Density 2324 2308 2306

Wt of can+ wet sample


(g) 653.0 505.8 498.1
Wt of can + dry
sample (g) 633.6 492.7 482.7
Wt of can (g)
85.7 80.7 80.7
Wt of Water 19.4 13.1 15.4
Wt of Dry Soil 547.9 412.0 402.0

Moisture content (%) 3.5 3.2 3.8

Dry density(Mg/m3) 2245 2236 2222

Dry unit wt (kN/m3) 22018.0 21929.0 21791.6

Max. Dry Density 2274 2274 2274


Degree of compaction
(%) 99 98 98

PROCTOR REFERANCE XRA/M09-0255/6 MDD 2274 OMC 5.90%

Method Variation -
Remarks - The Degree of Compaction was calculated based on the Maximum Dry Density of reference proctor No. XRA/M09-0255/6
Dated 02-07-2009 (photocopy Attached).

4940 5005 5130 4650 5050 5295 5335 5615 4690 5545 4770
8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000
2400 2310 2195 2635 2285 2140 2085 1810 2600 1900 2550

510.6 505.2 453.4 437.0 545.5 487.0 426.0 501.2 450.3 481.7 387.5
457.4 439.3 405.9 398.3 490.8 445.4 382.4 459.4 406.6 443.8 399.8
101.9 97.3 109.2 92.6 111.5 117.8 106.9 103.4 112.0 112.7 88.4
CONE A

4275 4955 4760 4335


8000 8000 8000 8000
3010 2400 2595 2895

428.1 473.8 495.7 429.3


384.2 425.9 455.0 383.2
85.7 105.0 109.6 106.7
CONE E
Density of sand (g/cm3) Wt. Of sand in cone+
baseplate (g) 1544 Proctor RefXRA/M06-015/2

4230 4595
D B 8000 8000
3511 3920 2950 2715
8000 8000 3506 3741
3644 3210 1.207 1.228
2812 3246 0 0 4355 4095
1.249 1.208 8000 8000
0 0 655.7 666.3 2680 2510
607.4 629.1 3776 3946
464.5 543.8 10.3 78.7 1.153 1.038
434.8 514.0 48.3 37.2 0 0
103.0 97.5 597.1 550.4
29.7 29.8 705.6 642.4
331.8 416.5 8.1 6.8 647.7 595.6
0 0 89.8 86.6
9.0 7.2 0.0 0.0 57.9 46.8
0 0 1802 1802 557.9 509.0
0.0 0.0 0 0
1802 1802 10.4 9.2
0 0 0 0
0.0 0.0
1802 1802
0 0
4235
8000
2940
3516
1.204
0

504.3
452.3
76.6
52.0
375.7

13.8
0
0.0
1802
0
CONE C
Density of sand (g/cm3) Wt. Of sand in cone+
baseplate (g) Proctor RefXRA/M06-015/2

4315
8000
2610
3846
1.122
0

615.0
576.9
84.4
38.1
492.5

7.7
0
0.0
1802
#DIV/0!
CONE D
Density of sand (g/cm3) Wt. Of sand in cone+
baseplate (g) Proctor RefXRA/M06-015/2
IN - SITU DENSITY TEST
RESULTS

Client Western Region Municipality Report No. XRA/SD10-0055

Contractor Faber LLC Date Reported 01/02/2010

Consultant Euroestudios Consulta Request No. XQA/SD10-0055

Project Name / No. Improvement of Infrastructure at Madinat Zayed City Date Tested 31/01/2010

Sample Description
Sub Base / Villa No.6, Old Baynounah Tested By Asim
/ Loc.
Test Performed as
0 B.S. 1377 : Part 9 : 1990 : Test 0 2.1 0 2.2 R ASTM : D 1556 - 2000 0 Others
per

Approved Soil Max. Dry Density 2274 kg/m³ Optimum Moisture Content% 5.9%

TEST RESULTS

Test No. – 1 2 3 - - - - - - - - -
Villa No.6, Villa No.6, Villa No.6,
Location of Test Point – Old Old Old - - - - - - - - -
Baynounah Baynounah Baynounah

Sub Base Sub Base Sub Base


Layer No. – Layer Layer Layer - - - - - - - - -

Layer Thickness mm 150 150 150 - - - - - - - - -

In-situ Wet Density kg/m³ 2324 2308 2306 - - - - - - - - -

In-situ Moisture Content


% 3.5 3.2 3.8 - - - - - - - - -

In-situ Dry Density kg/m3 2245 2236 2222 - - - - - - - - -

Maximum Dry Density of


kg/m³ 2274 2274 2274 - - - - - - - - -
approved Soil

Degree of Compaction % 99 98 98 - - - - - - - - -

Test Locations were selected by the 0Contractor 's Representative RConsultant's Representative

REMARKS:
- The Degree of Compaction was calculated based on the Maximum Dry Density of reference proctor No. XRA/M09-0255/6
Dated 02-07-2009 (photocopy Attached).

Eng. Ahmad Amer Eng. Ivy Mantilla


Material Engineer Material Engineer

Page 13 of 14
IN -SITU DENSITY TEST REPORT

Client Western Region Municipality Report No. XRA/D06-0005

Contractor Date Reported 01/02/2010

Consultant Request No. XQA/SD10-0055

Project No. N.A Sample No 0

Project Name Improvement of Infrastructure at Madinat Zayed City Date Tested 31/01/2010

Sample Description Sub Base / Villa No.6, Old Baynounah Time Tested 12/30/1899

Source of Material Site Tested By Asim

Test Method ASTM D1556 - 00 Sample Brt. In By matrix

PROCTOR REFERENCE M.D.D (g/cm3)


XRA/M09-0255/6 2274 O.M.C (%) 0.1

TEST RESULTS:

Test Ref. 0 0 0 0 0

Client Id.No 0 0 0 0 0
Villa No.6, Old Villa No.6, Old
Location Baynounah Baynounah
#REF! 0 0

Layer No. Sub Base Layer Sub Base Layer Sub Base Layer 0 0

Layer Thickness (mm) 0 0 0 0 0

Level (m) 0.00 0.00 0.00 0.00 0.00

In-situ Wet Density (g/cm


(Mg/m) )
3 3
0.000 0.000 0.000 0.000 0.000

In-situ Moisture Content (%) 0.0 0.0 0.0 0.0 0.0

In-situ Dry Density (Mg/m3) 0.000 0.000 0.000 0.000 0.000

Degree of Compaction (%) 0 0 0 0 0


N.P. indicates information not provided to MATRIX.

Method Variation: -
Remarks: - The Degree of Compaction was calculated based on the Maximum Dry Density of reference proctor No. XRA/M09-0255/6
Dated 02-07-2009 (photocopy Attached).
0

Engr. Ali A. Tahmaz


Managing Director
MATRIX LABORATORY, ABU DHABI