You are on page 1of 3

Planning and organizing of the project

no Phase of the project Activities to be Duration of Required man Responsibility Remark


performed the activities power
1 Understanding the Looking of the 2 days 3 IT manager
project area of the project
2 Design Design of the LAN 2days 3 IT manager
of network and
infrastructure
3 Propose Propose the 3 days 2 IT manager
networking and
infrastructure
4 Purchase Purchase the IT 5days 3 IT experts and 2 Marketing
network and daily workers manager
equipments
5 Implements Implements of the 8 days 5 IT experts and 3 IT Manager
LAN network of daily workers
Design

6 Test and check Testing of the 2 days 2 IT manager


network device
and installation of
software and
hardware
7 Prepare Tutor Prepare tutor for 2 days 2 IT manager
employee and for
staff
Hardware needed

no Name of hardware Manufacturer Quantity Unit price


or brand
1 computer Dell 790 144 800.00
500GB,16GB
RAM CORE i7
2 Server Hp 1TB HD 3 80000.00
16GB ram
3 ADSL Ethio 1 700.00
telecom
4 RJ-45 Intel 1000 5.00
5 Wall outlet integrated D-link 72 89.00
6 Patch panel D-link 9 1500.00
7 switch D-link 9 2500.00
8 router Cisco 1 55000.00
9 printer Hp LaserJet 9 7000.00
10 crimper Intel 3 60.00
11 Tester D-link 1 500.00
12 rack 6u rack 9 4500.00
13 trunk 25*40mm 75 60.00
14 Utp cable Cat 6e 3roll 3500.00
15 Fisher 6mm Intel 5pack 35.00
16 Screw 6mm Intel 5pack 45.00
17 Puncher - 3pcs 45.00
18 Drill bit 6mm Intel 5pcs 15.00
19 Drill machine Bosch 2pcs 250.00
=