The document outlines a plan to implement a new network infrastructure for an organization. It includes two tasks:
1. Planning and organizing the project work, which involves various activities like surveying the existing LAN infrastructure, purchasing equipment, implementation, testing and training over a period of around 75 days.
2. Identifying the network and internet infrastructure resources needed, which includes a list of hardware equipment like computers, servers, switches, UPS, cables etc. along with their specifications and estimated costs totaling around 1.5 million birr. It also lists the software applications required and estimates the monthly internet connectivity fee.
The document outlines a plan to implement a new network infrastructure for an organization. It includes two tasks:
1. Planning and organizing the project work, which involves various activities like surveying the existing LAN infrastructure, purchasing equipment, implementation, testing and training over a period of around 75 days.
2. Identifying the network and internet infrastructure resources needed, which includes a list of hardware equipment like computers, servers, switches, UPS, cables etc. along with their specifications and estimated costs totaling around 1.5 million birr. It also lists the software applications required and estimates the monthly internet connectivity fee.
The document outlines a plan to implement a new network infrastructure for an organization. It includes two tasks:
1. Planning and organizing the project work, which involves various activities like surveying the existing LAN infrastructure, purchasing equipment, implementation, testing and training over a period of around 75 days.
2. Identifying the network and internet infrastructure resources needed, which includes a list of hardware equipment like computers, servers, switches, UPS, cables etc. along with their specifications and estimated costs totaling around 1.5 million birr. It also lists the software applications required and estimates the monthly internet connectivity fee.
Phase of the Activity to be Duration of each Man power Responsible body
project perform activity Knowing the Looking the area 3 days 2 persons IT profession project of buildings Network Administrator Surveying Analyze the 9 days 2 persons IT profession existing LAN Network infrastructure Administrator Propose Purchasing Analysis of the 15 days 5 persons Day Labor purchasing and IT profession buying the devices and equipment’s Implementation Work of the 25 days 12 persons Day labor the network network IT profession installation infrastructure for trucking, cabling Testing and For testing and 7 days 6 persons IT profession labeling labeling all Network network Administrator infrastructure. Installation of Servers, router, 5 days 3 persons IT profession necessary switches and Network hardware software Administrator Prepare training Short term local 2 days 2 persons IT profession for all employers training for the Network and managers and users for how to Administrator it staffs use a network and how to troubleshoot easy problems Task 2:- Identifying network and internet infrastructure resources .
Hardware equipment needed
No Name of items Specification Quantity’s Estimate Estimate
unit price Total price 1 Computers Processor: Intel(R) 175 25,000 864,000 Core(TM) i3-3220 birr birr CPU @ 3.30GHz RAM: 4GB HDD: 500GB 2 Server 16GB RAM, 2 40,000 180,000 500GB HDD for birr File/Print, Domain Controller and DHCP servers 32GB RAM, 2TB HDD for Application and Mail. 3 Router/Core Switch’s 12 port 1 85,000 20,700 birr birr 4 Access Switch 24 port 10 65,000 44,000 birr birr Distribution Switch 12 port 2 75,000 birr 5 UPS 3000 watt 2 5,000 288,140 birr 6 PDU (power distributer 10 3,000 29,870 unit) birr 7 Patch Cord 3meter 6,000 7,570 birr 8 Network Printers 10 55,000 17,110 birr 9 Patch-panel 24 port 10 15,000 13,572 birr 10 RJ-45 10,000 10 birr 2500 birr 11 Cable Cat6e 10 role 7,000 11,368 birr 12 Trunk 25x60 cm 1,200 Per thickness meter 40 birr 13 Outlet and faceplate 200 14 Rack 12U 1 6U 2 4U 10
Software needed
No Application and OS name Specification Quantity’s Estimate unit Estimate total
price price 1 Microsoft server 2012 2 Microsoft exchange server 2010 for centralize messaging system 3 ISA server 2006 4 KASPERSKY server based antivirus for the server virus protection 5 Windows 7 ultimate 6 Microsoft office 2013 8 Power geez
Internet connection needed
10 Mb/s EPON broadband Internet Connection for the whole employers.
Connection type Estimate price of internet connectivity
10Mbs EPON Broadband internet connection Monthly usage fee is birr 5,550.00