New Technology Computer Center

Proposal For The Hardware &network Service Design

Proposal For The Hardware &Network


Services Design
Group Member

No Trainee’s name Sex Level Mobile No

1 Kulule Beharu F HNS IV 0947869213

2 Tsedalu Beyene F HNS IV 0912356403

3 Chala Tabore M HNS IV 0909553086

4 Tadelu Alemu F HNS IV 0910714368

5 Birhane Asefa F HNS IV 0944099398

2014 E.C
 Introduction

 Objectives
New Technology Computer Center
Proposal For The Hardware &network Service Design

 Planning and Organizing Project work

 Hardware and Software Equipment needed for the project

 Types of Internet connection and their Speed to use

 Required Manpower for the project

 Logical Design of the Project

 Assisting in policy development for client Support and Maintenance

 Conclusion

INTRODUCTION

New Technology Computer Center wants an internet connection and LAN Configuration , after
configuring it provides an internet service for users. Then the user simply access any resources
from outside world and communicates together.

OBJECTIVES

The Basic objective of this project is as follows:

 To provide an internet services for the users or customers

 To provide preventive Maintenance Service

 To give or provide a training for users, Employees and IT Staff for how to use and
troubleshoot a network problems.

Task 1. Planning and organizing project work

Contents

1. Phase of the project


2. Activity to be perform
3. Duration of each activity
4. Require man power responsible body
5. Performance of the employers
New Technology Computer Center
Proposal For The Hardware &network Service Design

N Phase of the Activity to be perform Duration of Require man Performance of Qualification of


o project each activity power the manpower
Responsible body Employers
1 planning Identify and gathering 3day manger 2 BSC HRM
information
2 Organizing Identify and gathering 2day manager 2 BSC HRM
information
3 Design Analysis data and 5day Technical 2 BSC IT
distributed resource
4 Implement Designing the physical 2day Technical 2 HNS L-4
layout of the project
5 Testing Check or testing the project 1day Technical 1 HNS L-4

6 Document testing the project functional 1day Manger 2 BSC HRM


or not
Task 2. Identifying network and internet Infrastructure resources

No Name of items Brand name of Quantity Unit Price


(hardware) manufacture Total Price
1 Severs Dell Power edge (T420) 2 10,000 birr 20,000
2 RJ-45 connecter Rj-45 1000 5 5000
3 router Standard 1 1500 1500
4 Switch 24 port 9 2500 22500
5 Cable Utp cat 5 2 roll 4000 8000
6 Cable tester New 2 1000 2000
7 Crimper New 5 200 1000
8 Adapter New 100 500 50,000
9 computer Dell opt 7080 175 5000 875000
10 Printer Hp laser jet 7 15000 105000

11 Regulator Atm 7 2000 14000

12 Utp cable Cat 5 250 25 6250


13 Driver Cobra 4 50 200
14
Hardware equipment needed

Software needed

No Application and OS name Quantity Unit price Total Price


New Technology Computer Center
Proposal For The Hardware &network Service Design

1 Microsoft server 2012 3 80birr 240 birr


2 Microsoft office Visio 2007 7 60 birr 420
3 Windows xp/7/8/10 7 100 birr 700
4 Antivirus 4 200 birr 800
5 Power Geez 2010 2 700 birr 1400

Internet connection needed

Type of internet connection Estimate price of internet connection


10Mbs EPON (Ethernet optical passive network) Monthly usage fee in birr 2000.00 birr
Broadband internet connection

Task 3. Prepare logical design of an IT infrastructure solution

Task 4. Assist in policy development of client support and maintenance

1. They should be a permanent employer for it support stuff whenever hardware and
networking failure occur
New Technology Computer Center
Proposal For The Hardware &network Service Design

2. Remote helpdesk support


3. Prepare a tutorial CD for troubleshooting easy hardware and networking failure
4. Prepare a training for all employers