You are on page 1of 6

List of Tables

Table 3.1. Non-dimensional Scaling of the Provinces

Table 4.1 Comparison between Selected Projects


Table 4.2 Paired Comparison
Table 4.3 Comparison between Projects with Ranked Attributes

Table 5.1.1. House models based on floor area and household percentage
Table 5.1.2. Small house model consumption during the dry season
Table 5.1.3. Small household consumption during the wet season
Table 5.1.4. Medium house model consumption during the dry season
Table 5.1.5. Medium household consumption during the wet season
Table 5.1.6. Large house model consumption during the dry season
Table 5.1.7. Large household consumption during the wet season
Table 5.1.8. Power demand of three house models for the year 2010
Table 5.1.9. Summary of residential sector power demand

Table 5.2.1. Power Consumption for Public Elementary School or High School (Classrooms and Faculty
rooms)
Table 5.2.2. Power Consumption of College or University (Classrooms and Faulty rooms)
Table 5.2.3. Power Consumption of Library and Computer Laboratory for Elementary, Secondary, and
Tertiary Levels
Table 5.2.4. Power Consumption of Government Office
Table 5.2.5. Power Consumption of Restaurant
Table 5.2.6. Power Consumption of Hotel and Resort
Table 5.2.7. Power Consumption of Supermarket

Table 5.3.1. Corresponding road lengths for areas in Negros Occidental


Table 5.3.2. Data needed for the computation of annual power demand
Table 5.3.3. Consumption of road lighting for 1999, 2020, and 2050
Table 5.3.4. Bus terminal power consumption
Table 5.3.5. Seaport power consumption
Table 5.3.6. Airport annual power consumption
Table 5.3.7. Summary of transportation sector power demand

Table 5.4.1. Sugarcane Mill Power Consumption


Table 5.4.2. Cement Manufacturing Plant Power Consumption
Table 5.4.3. Iron and Steel Manufacturing Plant Power Consumption Demand
Table 5.4.4. Pulp and Paper Manufacturing Plant Power Consumption
Table 5.4.5. Bread Manufacturing Plant Power Consumption

Table 5.5.1 Rice Production of Negros Occidental from 2011-2018


Table 5.5.2 Consumption of Rice Production
Table 5.5.3 Electricity Consumption in Aquaculture Production
Table 5.5.4 Electricity Consumption in Poultry Farming
Table 5.5.5 Electricity Consumption in Livestock Farming
Table 5.5.6 Volume of Crop Production of Negros Occidental
Table 5.5.7 Electricity Consumption in Poultry
Table 5.5.8 Summary of Electricity Demand for Agricultural Sector

Table 6.1.1. Feasibility of power plant with the certain type of energy source
Table 6.1.2. Capacity to meet the Power Demand
Table 6.1.3. Determining the Renewable Energy to be used
Table 6.1.4. Determining the Conventional Energy to be used

Table 7.1. First screening of geothermal conversion technologies


Table 7.2. Second screening of geothermal conversion technologies
Table 7.3. Criteria and selection alternatives for Edward’s multi-attribute decision analysis
Table 7.4. Normalized performance value for Edward’s multi-attribute decision analysis
Table 7.5. Weighted normalized performance value for Edward’s multi-attribute decision analysis
Table 7.6. First screening of natural gas conversion technologies
Table 7.7. Second screening of natural gas conversion technologies
Table 7.8. Criteria and selection alternatives for Edward’s multi-attribute decision analysis
Table 7.9. Normalized performance value for Edward’s multi-attribute decision analysis
Table 7.10. Weighted normalized performance value for Edward’s multi-attribute decision analysis

Table 8.1 Primary Screening for Natural Gas and Geothermal Power Plant Site Selection
Table 8.2 Secondary Screening for Natural Gas Power Plant Site Selection
Table 8.3 Final Screening for Natural Gas Power Plant Site Selection
Table 8.4 Normalized Matrix for Natural Gas Power Plant Site Selection
Table 8.5 Rating of Each Criteria for Natural Gas Power Plant Site Selection
Table 8.6 Edward’s Model for Natural Gas Power Plant Site Selection
Table 8.7 Secondary Screening for Geothermal Power Plant Site Selection
Table 8.8 Final Screening for Geothermal Power Plant Site Selection
Table 8.9 Normalized Matrix for Geothermal Power Plant Site Selection
Table 8.10 Rating of Each Criteria for Geothermal Power Plant Site Selection
Table 8.11 Edward’s Model for Geothermal Power Plant Site Selection

Table 9.1. Thermodynamic properties at each state of initial design


Table 9.2. Equipment efficiency and property values
Table 9.3. System parameters of initial NGCC power plant design
Table 9.4. Gas turbine models specifications
Table 9.5. Steam turbine models specifications
Table 9.6. System parameters of the condenser
Table 9.7. General Electric condenser specifications
Table 9.8. Pumpsland feedwater pump parameter
Table 9.9. Cooling water initial design parameter
Table 9.10. Delta Cooling Tower model specifications
Table 9.11. Thermodynamic properties at each state of final design
Table 9.12. Final property values and efficiency of equipment
Table 9.13. System parameters of final NGCC power plant design
Table 9.14. Specifications of SGT5-9000HL
Table 9.15. Specifications of SST-5000
Table 9.16. Specifications of PE 580-185-5 boiler feed pump
Table 9.17. Condenser final design parameter
Table 9.18. Specifications of GE’s condenser
Table 9.19. Cooling tower final design parameters
Table 9.20. Delta TR-210812 specifications
Table 9.21. Capital cost of a 580-MW CC power plant
Table 9.22. Capital cost and Operation & Maintenance cost increase due to inflation
Table 9.23. Financial performance of First Gen’s NGCC power plant
Table 9.24. Estimated costs and benefits of the NGCC power plant project in million Php
Table 9.25. Values for present worth method of cost analysis

Table 10.3.1 Initial Calculation of specific enthalpies


Table 10.3.2. Summary of Results based on initial calculations

Table 10.4.1. Specifications of Steam Turbines


Table 10.4.2. Specifications of Generator
Table 10.4.3. Specifications of Condenser

Table 10.5.1. Final Calculations based on the operating conditions of the selected equipment
Table 10.5.2. Summary of Results

Table 10.7.1. Cash Flow using Payback Method


Table 10.7.2. Cash flow using PW method
List of Figures
Figure 2.1 Political Map of Negros Occidental
Figure 2.2 Climate of Negros Occidental

Figure 5.1.1. Projected no. of households from 2010 to 2050


Figure 5.1.2. Projected annual power demand for a small house model
Figure 5.1.3. Projected annual power demand for a medium house model
Figure 5.1.4. Projected annual power demand for a large house model
Figure 5.1.5. Annual total power demand in residential area
Figure 5.1.6. Distribution of power demand in residential sector

Figure 5.2.1. Projection of Power Demand of Commercial Sector

Figure 5.3.1. Projected annual power demand for road lighting


Figure 5.3.2. Projected annual power demand for bus terminals
Figure 5.3.3. Projected annual power demand for seaports
Figure 5.3.4. Ports and airports in Western Visayas Region
Figure 5.3.5. Projected annual power demand for airports
Figure 5.3.6. Distribution of power demand in transportation sector

Figure 5.4.1. Sugarcane Processing


Figure 5.4.2. Pulp and Paper Manufacturing Processes
Figure 5.4.3. Projection of Power Demand of Industrial Sector

Figure 6.1.1. Potential Sites in the Philippines for Tidal Current and Wave Energy Sources
Figure 6.1.2. Annual Sun Hours in the Philippines

Figure 7.1. Yearly worldwide geothermal energy installed capacity

Figure 8.1 Population Map of Negros Occidental


Figure 8.2 Multi-hazard Area of Negros Occidental
Figure 8.3 Soil Liquefaction in Negros Occidental
Figure 8.4 Earthquake Induced Landslide Prone Area in Negros Occidental
Figure 8.5 Volcanic Hazard of Negros Occidental
Figure 8.6 Fault Lines in Negros Occidental

Figure 9.1. Schematic of a combined cycle power plant


Figure 9.3. Ideal and actual Brayton cycle T-s diagram
Figure 9.4. Ideal and actual Rankine cycle T-s diagram
Figure 9.5. Schematic diagram of NGCC for computation
Figure 9.6. ITT Industries condenser specifications
Figure 9.7. Flowserve feedwater pump parameter
Figure 9.8. Siemen’s SGT5-9000HL gas turbine package
Figure 9.9. Siemen’s SST-5000 steam turbine package
Figure 9.10. Benson HNC HRSG from Siemens
Figure 9.11. Almeco AIG-R-6060 open type cooling tower
Figure 9.12. Cumulative cash flow diagram

Figure 10.1.1. Predicted reservoir temperatures based on alteration mineralogy and fluid inclusion data
Figure 10.1.2 Measured temperatures
Figure 10.1.3. Geologic Model of Geothermal System
Figure 10.2.1. Schematic diagram of a double flash system
Figure 10.2.2. T-s diagram of a double flash system
Figure 10.4.1. TOPAIR Generator
Figure 10.4.2. GE Power Condenser
Figure 10.5.1. Alstom GRT Steam Turbine
Figure 10.5.2. TOPAIR Generator
Figure 10.5.3. GE Power Condenser

You might also like