ROAD CONDITION SURVEY ALONG DEL MONTE GATE (0+000) – KIBITI (197+400) CONDUCTED ON

15th DECEMBER, 2023


S/N LOCATION CONDITION OBSERVATIONS ONGOING MAINTENANCE REQUIRED
MAINTENANCE
1 0+000 - 11+700 poor Corrugations, potholes, NIL Grading, opening mitre drains
Erosions, no camber and and de-silting of drains
blocked mitre drains
2 11+700 – 27+300 poor Edge erosion, Potholes, NIL Grading, opening mitre drains
(KIKA JUNCTION) blocked mitre, no and de-silting of drains
camber and silted drains
3 27+300 – 40+600 Poor Corrugations, potholes NIL Heavy grading.
and erosion
4 40+600 – 48+000 Fair Corrugations, blocked NIL Light grading.
mitre drains
5 48+000 – 53+000 Fair Corrugations, potholes On Progress Light grading.

6 53+000 – 66+000 Poor Erosions, potholes and NIL Heavy grading, (Replace poor
Surface deterioration material with Gravel Material
from the approved borrow pit)
7 66+000 – 69+000 Fair Potholes and Erosions On Progress Grading, Opening drains and
mitre drains.
8 69+000 – 80+000 Poor Corrugations, potholes On Progress Grading, opening drains and
and erosion de-silting

9 80+000 – 85+000 Fair Corrugations. NIL Light grading.

10 85+000 – 86+000 Poor Potholes, erosions NIL Light grading.

11 86+000 – 92+700 Fair Corrugations. NIL Light grading.


(Mtemere)
12 92+700 – 100+000 Fair Corrugations, potholes NIL Light grading, filling of the
(Mloka) large pothole at km 96+000
13 100+000 – 120+000 Poor Corrugations, potholes, NIL Heavy grading + Reshaping
(Mwaseni) Erosions, no camber, no and opening drains
drains and blocked mitre
drains
14 120+000 – 130+000 Poor Severe potholes, NIL Heavy grading + Reshaping
(Mtanza) corrugations, erosions, and opening drains
no camber and no drains
15 130+000 – 139+000 Poor Severe potholes, NIL Heavy grading + Reshaping
(Ndundunyikanza) corrugations, erosions and opening drains
and no camber
16 139+000 – 151+500 Poor Severe potholes, NIL Heavy grading
(Ngorongo) erosions

17 151+500 - 160+000 Poor Corrugations, Severe NIL Grading, De-silting and


(Mkongo) Potholes and blocked provision of new drains
mitre drains

18 160+000 – 168+000 Poor Severe Potholes and On Progress Grading, De-silting and
(Kilimani) blocked mitre drains, no provision of new drains
side drains
19 168+000 – 181+000 Poor Corrugations, Severe NIL Heavy grading
(Ngulakula) Potholes and no
camber

20 181+000 – 183+000 Fair Corrugations Nil Light grading

21 183+000 – 197+400 Poor Corrugations, potholes, NIL Grading.


(Kibiti) Erosions,
SITE PHOTOS

(From Del monte 0+000 to Kika Junction 27+300)

(From Kika Junction 27+300 to Mtemere Gate 92+700)


Large pothole outside
Mtemere Gate 4km

(From Mtemere gate 92+700 to 139+000)


(From 139+000 to Kibiti 197+400)