EPICON ZINC RICH PRIMER B-2 Dec. ‘96
(EPZR B-2) CPI

EPICON ZINC RICH PRIMER B-2 is an epoxy zinc rich primer based on a combination of epoxy resin
and polyamide resin pigmented with metallic zinc powder. It has the following advantages:
1. Excellent rust preventing property
2. Fast dry
3. Excellent application workability
4. Excellent physical properties such as toughness, impact, and abrasion resistance
5. Excellent resistance to sea water and water, heat, and oil.

TECHNICAL DATA
Type : Epoxy zinc rich primer
Recommended Use : As a primer for protection of blast-cleaned steel plates used for plants, bridges,
oil tanks, steel structures, etc.
Mixing Ratio : Base : Hardener = 85 : 15 (by weight)
Colour : Brown, Green, Grey
Flash Point : Base : 10°C Hardener : 10°C
Solids by Volume : 33 ± 2 %
Coverage(Theoretical) : 0.045 – 0.075 L/m² ; 76 – 127 g/ m²
Wet Film Thickness : 1.8 – 3.0 mils ; 45 – 75 µ
Dry Film Thickness : 0.6 – 1.0 mils ; 15 – 25 µ
Drying Time : Temperature 5°C 10°C 20°C 30°C
(at D.F.T. 20 µ) Surface Dry 8 min. 7 min. 4 min. 3 min.
Hard Dry 4 hrs. 3 hrs. 2 hrs. 1.5 hrs.
Painting Interval : Minimum 24 hrs. 20 hrs. 16 hrs. 10 hrs.
(at D.F.T. 20 µ) Maximum 180 days 180 days 180 days 150 days
Pot Life : 72 hrs 60 hrs 48 hrs 24 hrs
Thinner : EPICON THINNER
Method of Application : Airless Spray, Brush, Roller
Conditions of Application : Temperature Minimum 5°C
Humidity Maximum 85 % R.H.
For Airless Spray ;
Tip No. GRACO 719
Paint output pressure 84 – 112 Kgf/cm²
Viscosity 9 – 13 Sec.(Ford Cup No. 4)
Thinning 10 – 20 % by volume
Preferable Preceding Coats : -
Preferable Subsequent Coats : Most of our products or the equivalents except oleo resinous paint and
inorganic zinc paint.
Packaging : Two pack product

Note:
*Minimum painting interval for touch up is 4 hours at 20°C.

The Information given in this sheet is effective at the date shown above and subject to revision from time to time without notice