Item 720A repair kit body

weekly demand (units) 1154 135 804


demand for the 13 weeks 15002 1755 10452
Currently on hand 8600 434 15536
safety stocks 0 360 0
requirement met(have - demand) -6402 -961 5084
plastic washer ball valve
2265 12
29445 156
16680 9387
9000 0
-3765 9231
period when order is place lot size extra inventory carried x periods carried =
1 0 -
2 80 0 0
90 10 1
120 30 2
6 150 30 4
7 - 0 0
8 30 0 1
part-periods cumulative part-periods

0 0
10 10 demand
60 70 culmulative demand
120 190
0 0
0 0
periods

1 2 3 4 5 6 7
- 80 10 30 - 30 -
0 80 90 120 120 150 150
8
30
180
week number beg. inv. 1 2 3
quantity

565 gross requirement


LT = 1 scheduled receipts
lot-for-lot projected on-hand
net requirements
planned-order receipts
planned-order releases

Y36 (2) gross requirement


LT = 1 scheduled receipts
lot-for-lot projected on-hand 200
net requirements
planned-order receipts
planned-order releases

J27 (4) gross requirement


LT = 2 scheduled receipts
lot-for-lot projected on-hand
net requirements
planned-order receipts
planned-order releases 640 units