APAR CONDITION

Capacity Exp. Date


No Type / Manufacture Classification SWJ No Instalation Date Inspection Date Location Remark
Kg / Ltr Pressure Hose & Restribution
Volume Lock Pin & Tag Visually Handle Demarcation
Gauge Nozzle

Category Condition ; Inspected by, Checked by, Acknowledge by, HSE Approved by,
G : Good
B : Bad
R : Replace

Date : Date : Date : Date :

Ref.SHE.WIN.002.R00 Rev.Fac.FE_10/14
Summary APAR PT MPG

No Description Capacity / Kg Qty


1
2
3
4
5
6
7
8
9
10
11
Total APAR 0

Spare APAR 6 6
Month : Oktober 2023

PT. MITRA PARAMA


GEMILANG FIRE EXTINGUISHER INSPECTION REPORT

APAR CONDITION
Capacity Inspection Exp. Date
No Type / Manufacture Classification SWJ No Pressure Lock Pin & Hose & Instalation Date Location Remark
Kg / Ltr Volume Visually Handle Demarcation Date Restribution
Gauge Tag Nozzle
1 GUNNEBO, ABC Powder A, B, C TU - FE - 45 6 Kg G G G G G G G 19-Jun-11 4-Sep-14 30-Oct-14 Office1st floor
2 PROFE, ABC Powder A, B, C TU - FE - 46 6 Kg G G G G G G G 19-Jun-11 4-Sep-14 30-Oct-14 Pantry
3 DICTAV, ABC Powder A, B, C TU - FE - 47 6 Kg G G G G G G G 8-Dec-11 4-Sep-14 30-Oct-14 Meeting Room
4 PROFE, ABC Powder A, B, C TU - FE - 48 6 Kg G G G G G G G 31-May-08 4-Sep-14 30-Oct-14 Depan Toilet
5 PROFE, ABC Powder A, B, C TU - FE - 49 6 Kg G G G G G G G 31-May-08 4-Sep-14 30-Oct-14 Locker Room
6 GUNNEBO, ABC Powder A, B, C TU - FE - 50 6 Kg G G G G G G G 25-May-08 4-Sep-14 30-Oct-14 Pos Security
7 PROFE, ABC Powder A, B, C TU - FE - 51 6 Kg G G G G G G G 3-Jan-10 4-Sep-14 30-Oct-14 Shipping
13 Feb 13
8 PROFE, ABC Powder A, B, C TU - FE - 52 6 Kg G G G G G G G 4-Sep-14 30-Oct-14 Server Room
(Hydrostatic)
9 GUNNEBO, Foam A, B TU - FE - 53 20 Ltr G G G G G G G 31-May-08 4-Sep-14 30-Oct-14 Depan Rak Shelving
10 PROFE, ABC Powder A, B, C TU - FE - 54 6 Kg G G G G G G G 25-May-11 4-Sep-14 30-Oct-14 Belakang Rak Shelving
11 DIVV Fire, Foam A, B - 50 Ltr G G G G G G G 25-May-11 4-Sep-14 30-Oct-14 Depan House Room
13 Feb 13
12 DIVV Fire, Foam A, B - 50 Ltr G G G G G G G 4-Sep-14 30-Oct-14 Depan House Room
(Hydrostatic)
13 FIRE X, ABC Powder A, B, C - 50 Kg G G G G G G G 4-Sep-14 4-Sep-14 30-Oct-14 Depan House Room
14 FIRE X, ABC Powder A, B, C - 50 Kg G G G G G G G 4-Sep-14 4-Sep-14 30-Oct-14 Depan House Room
15 GUNNEBO, Foam A, B - 9 Ltr G G G G G G G 4-Sep-14 4-Sep-14 30-Oct-14 Depan House Room
16 PROFE, ABC Powder A, B, C - 6 Kg G G G G G G G 4-Sep-14 4-Sep-14 30-Oct-14 WIP

17 PROFE, ABC Powder A, B, C - 6 Kg G G G G G G G 4-Sep-14 4-Sep-14 30-Oct-14 WIP

18 PROFE, ABC Powder A, B, C - 6 Kg G G G G G G G 4-Sep-14 4-Sep-14 30-Oct-14 Reman Core Area


19 PROFE, ABC Powder A, B, C - 6 Kg G G G G G G G - - 30-Oct-14 Forklip DP 70 Pengecekan Dilakukan Oleh Opr. Forklif
20

Category Condition ; Inspected by, Checked by, Acknowledge by, HSE Approved by,
G : Good
B : Bad
R : Replace

Date : Date : Date : Date :

Summary APAR PTTU WH Kariangau

No Description Capacity / Kg Qty


1 ABC Powder 20 2
2 Dictav, ABC Powder 20 Ltr 1
3 Divv Fire 50 2
4 Fire X 50 2
5 Gunnebo, ABC Powder 6 1
6 Gunnebo, Foam 9 Ltr 1
7 Profe, ABC Powder 6 10

Total APAR 19

Ref.SHE.WIN.002.R00 Rev.Fac.FE_10/14
Summary APAR PT. MPG

No Description Capacity / Kg Qty


1 ABC Powder, Dry Chemical 50 1
2 Gunnebo, ABC Powder 12 1
3 Gunnebo, ABC Powder 3 4
4 Gunnebo, ABC Powder 4,5 2
5 Gunnebo, ABC Powder 6 14
6 Gunnebo, CO2 5 1
7 Gunnebo, CO2 6,8 1
8 Profe, CO2 3,2 1
9 PROFE, ABC Powder 3 1
10 PROFE, ABC Powder 6 19
11 Swordsman, Dry Chemical 50 1
Total APAR 46

Spare APAR 6 6