You are on page 1of 1

Application form for installation of Grid Connected SPV Rooftop System Phase-II

To,
The Director
Zoram Energy Development Agency (ZEDA)
Zuangtui, Aizawl
Sir,
I hereby apply for installation of Grid Connected SPV Roftop Systems Phase-II
in my residence and avail Central Finance Assistance (CFA) from MNRE and for
which details are given below :

1 Name of the Applicant

2 Detail Address

3 Contact no
4 Email ID (if any )
5 Aadhaar Card No.
6 Consumer No/ Consumer ID
7 Consumer Category
8 Capacity of SPV Power Plant applied ( in
kWp) 1. Purely Grid Connected
9 Type of Grid Connected System
2. Hybrid Grid Connected
Contracted Load / Contracted Demand of
10
the Consumer ( in kW)
Space Available for installation of SPV
11
Power Plant ( in sqm)
Capacity of Distribution transformer (DT)
12 in which the consumer is connected( in
KVA) with the location of DT
Name of Sub Divisional Office (P&E)
13
under which the consumer is located
Metering applied (specify whether Net or
14
Gross)
Whether Power Purchase Agreement has
15
been signed or not (for Gross Metering)
Document enclosed :
(a) Last Electricity bill
16 (b) Xerox copy of Aadhaar Card
(c) Photocopy of PPA ( for Gross Metering
system,if signed )

Signature :
Name :