Al Jaber & Partners - Construction & Energy Projects ( WLL)

Project – SAHARA ASPHALT PLANT (ASPQ) Mesaieed, Qatar

Fire Drill Scenario: Fire in Laboratory Office Building

Lab technician was discovered a fire inside laboratory office. Following the fire was thick smoke emanated
from the stock materials (box full of file papers, lab equipment and cable wires). Within seconds, the whole
office was totally black out due to thick smoke from the fire. Panicking and shouting workers are likewise
heard. All staffs and site workers must be evacuated immediately.

Building/Area: Laboratory Office


Project Name: Sahara Asphalt Plant (ASPQ)
Shift: Day Night
Date: 24 January, 2022
Time Start: 0800hrs. Time Completed: Name of In Charge: Froilan D. Diosina
0805hrs.
AM Sr. Production Eng'r.
PM AM PM

SIMULATED FIRE EVACUATION DRILL


Location of simulated: Sahara Asphalt Plant
Type of alarm device iniated: Adressable Fire Alarm System
Yes No N/A
All employees notified before iniatiation of the drill
Fire alarm system function properly?
Fire alarm system reset and back in service afterwards?
If no, describe action taken:

Did the employee(s)evacuate the building/upon raising the alarm?


Fire equipments (Fire Extinguisher, Alarm, Detectors, exits etc.) functioned
properly during the drill? (simulated)
Doors/Exits opened during evacuation?
Employee(s) moved to the nearest assembly point?
Fire Warden or emergency Response Team available?
Emergency hotline 999 initiated (simulated) during the drill?
Emergency Response Team/Fire Warden(s) responded and assumed duties in
accordance with emergency evacuation plan?
Fire exit(s) Door(s) free from obstruction during the drill?
Head count perform after evacuation?
Comments: The drill went on smoothly, as expected, with the full co-operation of Plant Management team,
engineers, administrator, secretary and all concerned workers with a total head count of 35 which was
accounted in 5 minutes.

Prepared By: Approved By:

Edgardo S. Hornilla Froilan D. Diosina


AJP HSSE Officer Sr. Production Engineer