LABOUR CONSTANT
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
SUPPLIER MATERIAL DESCRIPTION
ATKC WAREHOUSE Common Bricks (720 PCS/PALLET)
Dimension = 220mm(L) x 96mm(W) x 68mm(H).
1 Pallet = 720 Pcs.
1 Pc = ~2.2 Kg.
Unskilled man-
ITEM Description Unit
hour (hrs)
Unskilled man-
ITEM Description Unit
hour (hrs)
1 Disposal 100m distance, spread & level M3 1.00
A.3 Hardcore
- Filling to make up level
Unskilled man-
ITEM Description Unit
hour (hrs)
1 not exceeding 250mm deep M2 0.50
2 Exceeding 250mm deep M3 2.00
a) Sand - 12.5 %
b) Ordinary Earth - 25%
c) Rock - 75% - 100%
d) Chalk - 50% - 60%
e) Clay - 33% - 50%
f) Gravel - 10% - 20%
Output Average
ITEM Load (M3) Unit
(m3/hour)
1 1/4 M3 8.00
2 3/8 M3 9.00
3 1/2 M3 12.00
4 3/4 M3 18.00
5 1 M3 25.00
a. Bed/Slab/Base
Unskilled man-
Item Description Unit
hour (hrs)
1 n.e 100mm M3 5.00
2 exc 100mm b.n.e 150mm M3 6.00
3 exc. 150mm b.n.e 300mm M3 7.00
4 exc. 300mm M3 8.00
Unskilled man-
Item Description Unit
hour (hrs)
1 Column and Beam M3 8.00
c. Wall
Unskilled man-
Item Description Unit
hour (hrs)
1 n.e 100mm M3 10.00
2 exc 100mm b.n.e 150mm M3 9.00
3 ecx 150mm b.n.e 300mm M3 8.00
4 exc 300mm M3 7.00
B.3 Formwork
-Using times
ITEM Description Unit using times
Labour
i Erecting – 1 skilled worker & 1 unskilled worker
ii Dismantling – 1 unskilled worker
Constant
ITEM Description Unit Erecting Dismantling
1 wall hrs/m2 0.75 0.15
2 floor hrs/m2 0.75 0.15
3 beam, column and lintel hrs/m2 1.15 0.15
Cost of timber : RM/Tonne x 1.42 m3/t
Unskilled man-
ITEM Description Unit
hour (hrs)
Pad Foundation M3 6.00
Ground Floor
≤ 150mm - 300mm thick M3 7.75
150mm - 300mm thick M3 6.50
> 300mm thick M3 5.00
Upper Floor
≤ 150mm - 300mm thick M3 9.25
150mm - 300mm thick M3 7.50
> 300mm thick M3 6.50
Wall
≤ 150mm - 300mm thick M3 10.00
150mm - 300mm thick M3 8.50
> 300mm thick M3 7.50
Column And Beam M3 8.00
Fast
hardened
Ordinary Portland Cement
ITEM Description portland
(Day)
cement
(Day)
1 Side of beams, Wall and Column 3 2
2 Floor (penyokong ditinggalkan) 4 3
3 Menanggal penyokong ke lantai 5
4 Slab under the beam (penyokong ditinggalkan) 8 5
5 Menanggal penyokong ke rasuk 21 8
Remove and
Prepare and Install/m2
ITEM Description Store (day)
Carpenter Unskilled Unskilled
1 Floor, Roof and Wall 1 hrs 0.75 hrs 0.75 hrs
Beam, Column and ambang 1.5 hrs 0.75 hrs 0.75 hrs
ARM PERUNDING SDN BHD
Tying wire
Labour
(i) Handling and unloading – unskilled worker
(ii) Cutting and Bending – skilled worker
(iii) Fixing – skilled worker
1 150mm 0.12
2 200mm 0.16
3 250mm 0.20
4 300mm 0.25
Labour
(i) Handling and unloading – unskilled worker
(ii) Fixing – skilled worker
D PLUMBING
D.1 Hot and cold water system ( upvc , galvanised and HDPE)
Soil, waste and vent. Pipe ( UPVC and Cast iron)
In trench,
ITEM Description Unit hardcore, floor, to Brickwall
ceiling space
1 < 20mm dia. Pipe hrs/m 0.10 0.12
2 25 – 32 mm dia. Pipe hrs/m 0.13 0.15
3 38 – 50 mm dia. Pipe hrs/m 0.15 0.18
(iii) HDPE
In trench,
ITEM Description Unit hardcore, floor, to Brickwall
ceiling space
1 < 20mm dia. Pipe hrs/m 0.10 0.12
2 25 – 32 mm dia. Pipe hrs/m 0.13 0.15
3 38 – 50 mm dia. Pipe hrs/m 0.15 0.18
D.2 Soil, waste and vent. Pipe ( UPVC and Cast iron)
i) Steel Pipe
ii) UPVC
ITEM Description Unit Sesiku Tee
1 < 20mm dia. Pipe hrs/no 0.08 0.12
2 25 – 32 mm dia. Pipe hrs/no 0.10 0.16
3 38 – 50 mm dia. Pipe hrs/no 0.13 0.20
1 Skilled worker
ITEM Description Unit and 1 Unskilled
worker
1 136 litre (30 gelen) 0.30
2 227 litre (50 gelen) 0.50
3 455 litre (100 gelen) 0.80
4 682 litre (150 gelen) 1.20
5 910 litre (200 gelen) 1.50
ARM PERUNDING SDN BHD LABOUR CONSTANT
E SANITARY FITTINGS
E.1 Sanitary appliances
1 skilled / 1
ITEM Description Unit
unskilled (hrs/no)
1 Wash hand basin no 1.75
2 Sink no 1.50
3 WC – Squatting no 2.25
4 WC – Pedestal no 2.00
5 Bowl Urinal no 0.50
6 Bath tab no 3.00
F BRICKWORK
F.1 (i) Number of common bricks per m2
- One brickwall (118 pieces)
- Half brickwall (59 pieces)
(ii) Mortar
- Labour mixing (.052 hr/m3) - 2.05 hr/m3
- Mortar used per m2 area of brickwall
a) one brickwall - 0.052 m3
b) half brickwall - 0.032 m3
Bricklayer Unskilled
ITEM Description
(hrs/m2) man-hour
1 Half brickwall in Ordinary Brick 1.00 0.35
2 One brickwall in Ordinary Brick 1.75 0.70
3 Half brickwall in Facing Brick 2.00 0.50
4 One brickwall in Facing Brick 3.50 1.00
ARM PERUNDING SDN BHD LABOUR CONSTANT
Additional
Jejari Lengkungan
Labour cost
≤ 1.50 m 50%
Unskilled
Bricklayer
Block Size 450mm x 150mm man-hour
(hrs/m2)
(hrs/m2)
100mm thick 0.75 0.35
G ROOF
G.1 (i) Batern and roof tile
Labour constant for batern and roof tile
- Normal roof tile
1 skilled worker and
Batern Overlapping
ITEM Number of tile (No./m2) Unit 1 unskilled worker
length ends (mm)
(hr/m2)
1 59.13 m/m2 9.76 60.00 0.45
2 60.61 m/m2 10.00 65.00 0.45
3 62.16 m/m2 10.26 70.00 0.46
4 63.8 m/m2 10.53 75.00 0.48
5 65.52 m/m2 10.81 80.00 0.49
6 67.34 m/m2 11.11 85.00 0.51
2 ceiling beam and floor beam hr/m 0.07 0.09 0.11 0.12
H.2 Door
1 skilled
ITEM Description Unit worker
(mortise)
1 40 mm mounted door frame HR 0.85
1 skilled
ITEM Description Unit worker
(mortise)
J FINISHES
J.1 Tile fixer
1 tiler fixer
and 1
ITEM Description Unit
unskilled
worker
1 cement pavement hr/m2 0.30
2 granolitik pavement hr/m2 0.35
3 screeded plaster hr/m2 0.25
4 floated plaster hr/m2 0.28
5 trowelled plaster hr/m2 0.30
J.2 Skirting
cement and
ITEM Description Unit Granolitik
sand
1 75mm hr/m 0.35 0.45
2 100mm hr/m 0.38 0.50
3 125mm hr/m 0.41 0.55
4 150mm hr/m 0.45 0.60
1 plasterer
and 1
ITEM Description Unit
unskilled
worker
1 wall hr/m2 0.40
2 ceiling hr/m3 0.50
J.4 Tiles
1 tiler and 1
ITEM Description Unit unskilled
worker
1 wall hr/m2 1.00
2 floor hr/m2 1.25
J.5 Kambi Jubin
1 tiler and 1
ITEM Description Unit unskilled
worker
1 75mm hr/m2 0.20
2 100mm hr/m2 0.23
3 125mm hr/m2 0.26
4 150mm hr/m2 0.30
1 tiler and 1
ITEM Description Unit unskilled
worker
1 Lantai Parket hr/m2 0.50
2 Lantai Strip hr/m2 0.45
3 Kambi Kayu hr/m 0.20
Memasang ke Memasang ke
Memasang
ITEM Description Unit kayu dengan logam dengan
kayu ke dempul
kumai dempul
Permukaan Permukaan
ITEM Description Unit
kayu logam
hr/
1 Membersih buku kayu 100.00m2 3 -
hr/
2 Menyumbat buku kayu 100.00m2 3 -
hr/
3 Mengosok dengan Kertas pasir 100.00m2 3 -
hr/
4 Menyapu cat asas 100.00m2 8 8
hr/
5 Menyapu cat alas 100.00m2 8 8
hr/
6 Menyapu cat kemas 100.00m2 9 9